Drawing for COLD PAD

USPTO serial 79142327

COLD PAD

Reviewed by CopyMark Law Group

Reg. 4665261Status 709
Filing date
Status date
Registration date
Jan 6, 2015
Examiner
HUSSAIN, TASNEEM
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with COLD PAD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brooks R. Bruneau

Brooks R. Bruneau FisherBroyles, LLC100 Overlook CenterSecond FloorPrinceton, NJ 08540

Goods and services

ClassDescriptionStatusFirst use
017Rubber, raw gum and products made from these materials, namely, sealing and insulating materials for sealing against liquids and gas; sealing and insulating materials made of semi-processed plastics for sealing against liquids and gas; synthetic resin-based plates designed to insulate and reinforce using bonding technology; binding preparations in the nature of adhesive sealants for sealing against liquids and gas; synthetic fibers as well as structural components thereof in the form of plates, matting, tapes for insulation, sealing and bonding; plastic fibers as well as structural components thereof in the form of plates, matting, and tapes for insulation, sealing and bonding; fiberglass fabrics in an unbleached, coated or processed state, all for insulation, sealing and bonding; sealing and insulating materials based on bituminous or similar products; sealing and insulating materials based on plastic materials or similar products; carbon fiber fabrics for insulation and reinforcement using bonding technology; semi-processed artificial and semi-finished synthetic resins for insulation and reinforcement using bonding technology; synthetic polymer thin film waterproof coatings in the nature of physical insulation for use in sealing against liquids and gas; water-tight rings for plumbing pipes and tanks; sealing and insulating materialsSECTION 71 - CANCELLED
037Repair of buildings, civil engineering structures, marine engineering structures, aircraft engineering structures, petroleum engineering structures, automotive engineering structures, railway engineering and nuclear engineering structures using bonded assembly, such services not for use in roads and other paths and running surfaces and earthworks; waterproofing of buildings, civil engineering work structures, marine engineering structures, petroleum engineering structures, aeronautical engineering structures, nuclear engineering structures, automotive engineering structures, railway engineering structures; installation of products for packing, stopping, insulating and reinforcing buildings, civil engineering structures, marine engineering structures, petroleum engineering structures, aeronautical engineering structures, automotive engineering structures, nuclear engineering structures, railway engineering structures, such services not for use in roads and other paths and running surfaces, and earthworks; services, namely, repair, reinforcement, maintenance, and demolition of buildings, civil engineering structures, marine engineering structures, petroleum engineering structures, aeronautical engineering structures, automotive engineering structures, nuclear engineering structures, railway engineering structures; construction, reinforcement, maintenance and repair of enclosures, retention basins, reservoirs and silos; supervision of construction, other than for roads and other such paths, running surfaces and earthworks; repair, reinforcement of metal structures, steel structures, wooden structures, masonry structures, concrete structures, other than for roads and other such paths, running surfaces and earthworks; reinforcement of steel structures and metal structures with the aim of protecting them from corrosion, other than structures for roads and other such paths, running surfaces and earthworks, reinforcement of metal structures, steel structures, wooden structures, concrete structures and masonry structures, with the aim of protecting them against fire, other than structures for roads and other such paths, running surfaces and earthworks; reinforcement of metal structures, steel structures, wooden structures, concrete structures and masonry structures, in order to make them watertight-proof or to seal them, other than structures for roads and other such paths, running surfaces and earthworksSECTION 71 - CANCELLED
042Technical inspection services in the field of structural bonding and sealing; monitoring for quality control purposes of buildings, civil engineering structures, marine engineering structures, petroleum engineering structures, aeronautical engineering structures, nuclear engineering structures, automotive engineering structures, railway engineering structures, other than road works, earth works and running surface works; research and development of new products and services for others; research and development of prototypes; engineering services in the field of construction, other than earthworks and road engineering; engineering and technical engineering consulting relating to the repair, reinforcement and protection of metal structures, steel structures, wooden structures, masonry structures and concrete structures, other than for roads and other such paths, running surfaces and earthworks; engineering services and technical engineering consulting with regard to waterproofing, sealing, fire protection for buildings, civil engineering structures, marine engineering structures, petroleum engineering structures, aeronautical engineering structures, automotive engineering structures, nuclear engineering structures, railway engineering structures, other than road works, earth works and running surface works; engineering and technical engineering consulting in construction, other than for road construction and civil engineering works, running surface works and earthworks, engineering and technical engineering consulting services for all of the following products, namely, rubber, gum and products made from these materials and not included in other classes, for sealing against liquids and gas, processed plastic products for sealing against liquids and gas, resin-based plates designed to insulate and reinforce using bonding technology, binding preparations for sealing against liquids and gas, synthetic fibers and components thereof, in the form of plates, matting, tapes for insulation, sealing and bonding, plastic fibers and components thereof, in the form of plates, matting, tapes for insulation, sealing and bonding, unprocessed, coated or treated glass fiber fabrics for insulation, sealing and bonding, sealing preparations based on bituminous or similar products, sealing products based on plastic materials or similar products, carbon fiber fabrics for insulation and reinforcement using bonding technology, artificial and synthetic resins as semi-finished products for insulation and reinforcement using bonding technology, waterproof coatings, water-tight rings, sealing and insulating fittingsSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2026C71TCANCELLED SECTION 71
Nov 22, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED
Jan 6, 2024REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Oct 5, 2023RNWLINTERNATIONAL REGISTRATION RENEWED
Jul 29, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Feb 23, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Feb 23, 202171AGREGISTERED-SEC.71 ACCEPTED
Feb 10, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Dec 29, 2020ES71TEAS SECTION 71 RECEIVED
Jan 6, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Dec 12, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Nov 8, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Dec 14, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED
Jun 7, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB
May 18, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB
May 18, 2015FIMPFINAL DISPOSITION PROCESSED
Apr 6, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jan 6, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 24, 2014GPNXNOTIFICATION PROCESSED BY IB
Oct 21, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 21, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 8, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Oct 8, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Oct 1, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Sep 17, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Sep 10, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 9, 2014XAECEXAMINER'S AMENDMENT ENTERED
Sep 8, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Sep 8, 2014GNEAEXAMINERS AMENDMENT E-MAILED
Sep 8, 2014CNEAEXAMINERS AMENDMENT -WRITTEN
Sep 3, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 3, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 27, 2014ALIEASSIGNED TO LIE
Aug 20, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 14, 2014RFNTREFUSAL PROCESSED BY IB
Feb 22, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Feb 22, 2014MAFRAPPLICATION FILING RECEIPT MAILED
Feb 20, 2014RFRRREFUSAL PROCESSED BY MPU
Feb 19, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 18, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2014DOCKASSIGNED TO EXAMINER
Feb 18, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 17, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance