Drawing for NSK

USPTO serial 79142635

NSK

Reviewed by CopyMark Law Group

Reg. 4669214Status 739Registered
Filing date
Status date
Registration date
Jan 13, 2015
Examiner
WOOD, CAROLINE
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with NSK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mainak H. Mehta

Mainak H. Mehta Procopio, Cory, Hargreaves & Savitch LLP525 B Street, Suite 2200San Diego, CA 92101United States

Goods and services

ClassDescriptionStatusFirst use
004Mineral oils and greases for industrial purposes, not for fuel; non-mineral oils and greases for industrial purposes, not for fuel; lubricating greaseACTIVE—
007Vehicle engine parts, namely, rocker arms; parts for non-electric prime movers for land vehicles, namely, tensioners for land vehicle engine timing belts; ball bearings for industrial machines in this class; roller bearings for machines; needle roller bearings for machines; tapered roller bearings for machines; bearings integral with bearing stands for machines; linear motion bearings for machines; bearings for water pumps which circulate engine cooling water; bearings, for use as machine elements other than for land vehicles; parts and fittings of bearings for machine elements, not for land vehicles; shafts, axles and spindles, not for land vehicles; shaft couplings and connectors for machine elements, not for land vehicles; spindles for use as parts of machine tools; machine parts, namely, joints; cam clutches for machines; one-way clutches for machines; speed change gears for machine elements, not for land vehicles; actuators, namely, rotational actuators and linear actuators; power transmissions and gearing for machines, not for land vehicles; ball screws for machines; positioning devices for machines; machine parts, namely, index devices; machine parts, namely, XY tables; AC motors and DC motors not including those for land vehicles but including parts for any AC motors and DC motors.ACTIVE—
012Wheel bearings for land vehicles; wheel bearings integral with wheel hubs for land vehicles; bearings for clutches for land vehicles; bearings for use as machine elements for land vehicles; parts and fittings of bearings for land vehicles; shafts, axles and spindles for land vehicles; shaft couplings and connectors for land vehicles; one-way clutches for land vehicles; pulleys integral with one-way clutches and bearings for land vehicles; machine elements for land vehicles, namely, transmissions and their parts and fittings, water pump bearings, joints, rocker arms, pulleys, tensioners, idlers, friction clutch assemblies, friction plates, separator plates, brake bands, ball screws, and speed change gears; steering devices for land vehicles; parts and fittings of steering devices for land vehiclesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 21, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Apr 21, 2025C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Apr 21, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 4, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Jan 13, 2024REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jan 28, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 3, 2021NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Feb 3, 2021C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Feb 1, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 5, 2020ES75TEAS SECTION 71 & 15 RECEIVED—
Jan 13, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Feb 28, 2019RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 12, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 22, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 22, 2015FIMPFINAL DISPOSITION PROCESSED—
Apr 13, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 13, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 13, 2014CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Nov 10, 2014APETASSIGNED TO PETITION STAFF—
Nov 3, 2014EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Oct 28, 2014NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 28, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 23, 2014GPNXNOTIFICATION PROCESSED BY IB—
Oct 8, 2014OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 8, 2014OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 8, 2014NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 19, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 14, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 23, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 23, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 11, 2014ALIEASSIGNED TO LIE—
Aug 7, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 7, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 21, 2014RFNTREFUSAL PROCESSED BY IB—
Mar 5, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 5, 2014RFRRREFUSAL PROCESSED BY MPU—
Mar 4, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 3, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 25, 2014DOCKASSIGNED TO EXAMINER—
Feb 25, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 19, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 18, 2014LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Feb 17, 2014SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance