Drawing for FREEFAB

USPTO serial 79143364

FREEFAB

Reviewed by CopyMark Law Group

Reg. 4718522Status 404
Filing date
Status date
Registration date
Apr 14, 2015
Examiner
BEVERLY, JOSETTE MICHELLE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FREEFAB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Frederick W. Meyers

Frederick W. Meyers IP Solved, LLP53 W.Jackson Blvd, Suite 950chic, IL 60604UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Non-metallic building materials, namely, concrete, industrial concrete for use in civil engineering works; non-metallic formwork, namely, tables, scaffolding, mouldings, not of metal, for building; portable non-metallic buildings; concrete components, namely, blocks, beams, bricks, posts, slabs, panels, floors; works of stone masonry, namely, blocks, beams, bricks, posts, slabs, panels, floors; natural stone; articles of natural stone for building purposes, namely, blocks, beams, bricks, posts, slabs, panels, floors; articles of concrete for construction purposes, namely, blocks, beams, bricks, posts, slabs, panels, floors; precast concrete beams; precast concrete building elements, namely, blocks, beams, bricks, posts, slabs, panels, floors; precast concrete floor elements, namely, floor panels, floor tiles; precast concrete floor slabs; precast concrete girdersSECTION 71 - CANCELLED—
037Building construction; general building construction contractor and project management services; construction facilities management; building repair and renovation; installation services of panelling, tiling, flooring and glass; refurbishment and fitting out of buildings; engineering construction, namely, construction and repair of buildings and structures; civil engineering construction, namely, construction of roads, railway, underground utilities, housing and waterways; electric appliance installation and repairSECTION 71 - CANCELLED—
040Custom construction of building materials and precast concrete building elements, namely, blocks, beams, bricks, posts, slabs, panels, floors; custom fabricating, making or manufacturing of structures of concrete components, namely, blocks, beams, bricks, posts, slabs, panels, floors for othersSECTION 71 - CANCELLED—
042Research on building construction or city planning; building research services on testing, analyzing and evaluating the structural properties of masonry and concrete structures; engineering research services; architecture and construction drafting; design of buildings, structures concrete components, namely, blocks, beams, bricks, posts, slabs, panels, floors; engineering; environmental engineering; material testing, urban planning, design of stone work for buildings; consultancy in use of stone and concrete in construction drafting; mechanical and electrical engineering servicesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 29, 2024DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Apr 29, 2024DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Apr 29, 2024DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 2, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 6, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 6, 2022INPCINVALIDATION PROCESSED—
Jul 26, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 26, 2021C71TCANCELLED SECTION 71—
Apr 14, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 25, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 4, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 25, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 12, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 17, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 4, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 4, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 19, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 19, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 4, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 18, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 18, 2015FIMPFINAL DISPOSITION PROCESSED—
Jul 14, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 14, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 27, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 27, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 23, 2015GPNXNOTIFICATION PROCESSED BY IB—
Jan 7, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 7, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 7, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 19, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 17, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 17, 2014XAECEXAMINER'S AMENDMENT ENTERED—
Dec 17, 2014GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 17, 2014GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 17, 2014CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 2, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 2, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 2, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 11, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 8, 2014PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
May 24, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 22, 2014ALIEASSIGNED TO LIE—
May 12, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 14, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 14, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 14, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 9, 2014ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 9, 2014REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 4, 2014RFNPREFUSAL PROCESSED BY IB—
Mar 17, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 17, 2014RFRRREFUSAL PROCESSED BY MPU—
Mar 17, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 16, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 11, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 7, 2014DOCKASSIGNED TO EXAMINER—
Mar 7, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 6, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance