USPTO serial 79143665
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
JOSE MARIA ARRUFAT
JOSE MARIA ARRUFAT ARRUFAT GRACIA PLLC54 WEST, 40TH STREET, SUITE 816NEW YORK, NY 10018UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; metal building materials, namely, soffits, fascia, trim; transportable buildings of metal; metallic materials for railway tracks; non-electric cables and wires of common metal; ironmongery, namely, hinges, mounting brackets, nails, metal pipes; metal safes; ores of metal; metal boxes; boxes of common metal; metal lattices; metal gratings; metal cable trays used in building construction; metal moldings; tool and tool accessory trays made of metal sold empty and parts and fittings therefor; metal formwork tables scaffolding and metal scaffolding; pillars of metal for buildings; steel frames for building; metal containers for the storage and transportation of goods; masts of metal; metal posts; ventilating ducts of metal; metal lids; wall panels of metal; metal strapping or tie downs; all-purpose metal straps; metal bolts; ironmongery, namely, stops of metal, metal joinery fittings; steel plates and sheets; steels in the form of sheets, plates, foils and reels; metal and metallic flanges; corrosion-resistant metal overlays and alloys for fittings, steel plates, flanges, piping components; metal pipe couplings and joints; metal pipe clips; metal cable wire; magnet wire, namely, copper or aluminum wire covered with thin insulation for use in the manufacture of electric and electronic apparatus; washers of metal for electrical installations; metal hardware, namely, springs; ferrules of metal for use as mounting bases for handles; ferrules of metal for use in holding cables and wires; ferrules of metal structures, namely, steel buildings; metal cable wire stretchers; tension links of metal; metal hooks; metal, wash down spray nozzles for commercial and industrial use; metal hardware, namely, springs, cermets; metal threaded fasteners; metal screws; sealing caps of metal; fasteners, namely, metal bars and chains; metal bonding fasteners for mounting and demounting of ceiling and wall panels; pegs of metal; rivets, cramps and nails of metal; soldering wire of metal; metal building flashing; metal plugs; rails of metal; wire rope fittings of metal, namely, sockets, threaded studs and buttons; Metal self-aligning demountable snap fasteners consisting of press fasteners and press studs for use in attaching panels, hatches, floors and furniture in boats, motor vehicles, trains, aircraft and buildings; cable joints of metal, non-electric; rope thimbles of metal; crash barriers of metal for roads; solder wire; bindings of metal; metal junction sleeves for non-electric cables; cable junction sleeves of metal; reinforcing materials of metal for pipes; non-automatic metal turnstiles; metal latch bars; anchor bolts of metal for bridge connection; binding screws of metal for cables; metal nuts; metal reinforcement materials for buildings; awnings of metal; general purpose metal storage bins; metal gutter pipes; steel in the form of sheets, plates, foils and coils; back-up boards, back-up sheets, back-up panels, entry boards, entry sheets, and entry panels made out of metal for use in the operation of drilling holes in printed circuit boards; cladding of metal for construction and building; elbows of metal for pipes including those from alloy steel and titanium; metal pipe fittings for rigid pipes; metal pipes and metal fittings therefor; metal pipe fittings, namely, rosettes for rigid pipes; metal pipes and metal fittings therefor; manifolds of metal for pipelines; duckboards of metal; metal trellises; brackets of metal for building; tension links of metal; linings of metal for building purposes; sheet metal linings; metal partitions for building; sculptures of metal | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 14, 2024 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 14, 2024 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 14, 2024 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| May 9, 2023 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 17, 2023 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 17, 2023 | INPC | INVALIDATION PROCESSED | — |
| Mar 1, 2023 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 15, 2022 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jul 1, 2022 | C71T | CANCELLED SECTION 71 | — |
| Jun 21, 2022 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jun 25, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 15, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 21, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 21, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 4, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 4, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 3, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 26, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 8, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 8, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 8, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 15, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 15, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 29, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 29, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 25, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 9, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 9, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 9, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 4, 2015 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Aug 26, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 25, 2015 | ALIE | ASSIGNED TO LIE | — |
| Aug 19, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 19, 2015 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 7, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 7, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 7, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 7, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 7, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 16, 2014 | RDX3 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED | — |
| Dec 16, 2014 | RDX1 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED | — |
| Dec 16, 2014 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Nov 21, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 20, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 20, 2014 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 31, 2014 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 31, 2014 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 31, 2014 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 9, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 8, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 8, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 4, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 18, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 17, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 17, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 17, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 16, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 14, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 13, 2014 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Mar 13, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |