USPTO serial 79146821
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Scott J. Major
Scott J. Major MILLEN, WHITE, ZELANO & BRANIGAN, P.C.2200 Clarendon Blvd., Suite 1400Arlington Courthouse Plaza 1Arlington, VA 22201| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Generators of electricity; current generators; alternators; machines, engines and motors for electric apparatus to create electric current ] | SECTION 71 - CANCELLED | — |
| 009 | Apparatus and instruments, namely, electric controllers and switches for conduction, allocation, transformation, storage, regulation and control of electricity and electric current, electric and electronic components, namely, power supply units, electric transformers, coupling devices, measuring current transformers, interface converters for apparatus and instruments for conduction, allocation, transformation, storage, regulation or control of electricity and electric current; electric and electronic devices and instruments, namely, measuring transducers, alarm indicators, control and auxiliary circuits for monitoring and supervision of electricity, leakage resistance, current, voltage and other electric or non-electric amplitude and its characteristics with or without switching function; devices and instruments, namely, insulation meters for monitoring and measurement of electricity supply and insulation with or without switching function; devices and instruments, namely, relays for monitoring and supervision of devices and instruments for generating, transferring and allocating electricity and its insulation with or without switching function; measuring apparatus, namely, supervision and monitoring relays for electric apparatus and systems; electric and electronical measurement instruments, namely, relays; test apparatus, namely, safety analysers and testers for measurement and supervision of electric and non-electric parameters of electric operating resources, medical electrical devices and electric apparatus; analogue and digital multimeter for measurement and supervision of electric and non-electric parameters of electric operating resources, medical electrical devices and electric apparatus, electric and electrical components and devices and systems, namely, power supply units, electricity transformers, measuring current transformers, coupling devices, alarm indicators for electricity supply in hospitals and facilities used for medical purposes; components, namely, controllers, measuring and monitoring relays, residual current monitors for monitoring, control and service of electricity supply and power distribution devices and their components; computer hardware and software for analysis, visualization and storage of operating parameters and metered values of electric apparatus and systems; ammeter; electronic indicator panels; observation instruments, namely, insulation fault locators, insulations fault evaluators, insulation monitors, automatic transfer switches and monitors for safety power supplies for measurement, monitoring and switching as well as interruption and troubleshooting of electricity and respective insulation devices; computer monitors for monitoring and analysis of electronic instruments; computers for monitoring and analysis of electronic instruments, computers for measurement, monitoring, switching, interruption and troubleshooting of electricity and respective insulation devices; computer operating programs, recorded, for electric current measurement, monitoring, control, interruption and troubleshooting of electricity and respective insulation devices; computer peripheral devices; computer programs recorded on data media for use in electrical current measurement, monitoring, control, interruption and troubleshooting of electricity and respective insulation devices; downloadable computer software programs for electrical current measurement, monitoring, control, interruption and troubleshooting of electricity and respective insulation devices; computer software recorded on data media for use in electrical current measurement, monitoring, control, interruption and troubleshooting of electricity and respective insulation devices; diagnostic apparatus, namely, detectors of abnormalities in electricity usage, amperage and insulation defects; diagnostic apparatus for evaluating current and voltage quality, not for medical purposes; electronic notice boards; electric resistors; anti-interferences electricity devices, namely, power quality testers; frequency meters; electricity limiters; electric light dimmers, electrical inductors; integrated circuits; interfaces for computer; [ blank integrated circuit cards; blank smart cards; encoded integrated circuit cards containing programming used to evaluate and monitor power quality; electricity accumulators; comparators; ] electric regulating apparatus, namely, voltage relays, current relays; [ measuring apparatus, namely, jigs; data processing equipment, namely, readers for monitoring and evaluating power quality; material testing instruments and machines, namely, electrical shock safety testers; ] measuring instruments, namely, ammeters, voltmeters, voltage and current relays; [ computer programs for monitoring and analysis of instruments, namely, insulation monitors, insulation fault locators, power supply units, safety testers; ] optical apparatus and instruments, namely, insulation monitors, current and voltage relays for measurement and control of electricity and its insulation; [ radio pagers for transmission of system status and alarm messages; ] electricity switchboards; [ commutators; electric switches; electric commutators; electricity distribution consoles; ] electricity control panels; transmitter of electronic signals for transmission of power supply system status and alarm messages in respect of electrical safety; electronic indicator panels; electronic indicator boards; electric battery chargers; voltmeters; current limiter; current rectifiers; electricity conduits; circuit closers; ] circuit breakers; electric loss indicators, namely, insulation fault locators, current relays and voltage relays; [ converters; inverters; ] voltage surge protectors; electric monitoring apparatus, namely, residual current monitors, loop monitoring relays to monitor loop resistances, loop monitors, fault voltage monitors; surveying apparatus and instruments; surveying chains; electricity distribution boards; electric resistances [ ; air quality measurement apparatus, namely, particle counters; circuit breaker indicators, namely, cell switches ] | ACTIVE | — |
| 042 | Technical consulting services in the field of electrical power system engineering; engineering services, namely, technical project planning and design engineering of electrical power systems; technical consulting services in the field of electrical power system design and testing, namely, services of an engineer, physicists, measuring and testing laboratory and technicians for control systems and system engineers, technical consultancy and expert reviewing services in respect of electrical power systems, building design and construction drafting; computer system design for electricity and insulation monitoring devices, instruments, apparatus and its components; draft and development of computer-hardware and software regarding analysis, visualization and storage of operating parameters and metered values of electric apparatus and systems; technical support services, namely, technical administration of servers for others and troubleshooting in the nature of diagnosing server problems; non-physical data conversion of computer programs and data; measurement evaluations in the field of electricity engineering; performance of technical measurements; performance of scientific research in the field of electricity engineering; calibration and performance tests of measurement devices in the field of electricity engineering and leakage resistance devices; construction drafting for electricity and insulation monitoring devices; material testing; quality management services, namely, quality evaluation and analysis, quality assurance, and quality control, in the field of electricity engineering | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 8, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 8, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Oct 8, 2025 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Oct 6, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 30, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Mar 5, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 5, 2025 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Mar 5, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 5, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 18, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Dec 30, 2023 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jun 27, 2022 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 14, 2022 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 14, 2022 | INPC | INVALIDATION PROCESSED | — |
| Nov 30, 2021 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 31, 2021 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Mar 31, 2021 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Feb 2, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 14, 2020 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jun 1, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 14, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 14, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 30, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 30, 2014 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 10, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 14, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 24, 2014 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 11, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 10, 2014 | ALIE | ASSIGNED TO LIE | — |
| Aug 27, 2014 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Aug 27, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 27, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 27, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 13, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 27, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 27, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 24, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 23, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 16, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| May 16, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 15, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |