USPTO serial 79147807
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Clifford D. Hyra
Clifford D. Hyra Fresh IP PLC11710 Plaza America Drive Suite 2000Reston, VA 20190United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Goods of metal, namely, [ building materials, namely, barriers for the protection of buildings, machines, racks, pedestrians, dangerous areas, constructions, and vehicles, transportable buildings, non-electric cables and wires, ironmongery, in the nature of pipes and tubes, security lock cylinders, closures, namely, metal partitions for segregation between two areas, people, traffic; wire gauze, locks, springs, door handles, key rings, cable clips, cable linkages, rods, rivets, armour plate, armour plating, stops, Wheel clamps, bolts, heating ducts, pipe junctions, hinges, valves other than parts of machines, key for locks, screws, nuts, tension links, ] fence posts, posts, [ beams, hoop iron, sheets of metal, metal name plates, door hinges, window fittings, door fittings, sash fasteners for windows, metal grids components for suspending ceiling systems, namely, main runners, cross tees, wall angles and wall channels, ] fencing panels, [ rope thimbles, chains, coupling for chains, crampons of metal, laths, canopies, bird repellent spikes, latch bars, ] guard barriers for segregation and protection [ , braces, hooks, eye bolts, wall plugs, padlocks; metal demarcation systems comprised of metal poles and wires, trellis, fireplace screens, storm shelters, door frames, ladders, greenhouses, steel sheets, door panels, framework, reinforcing materials for building purposes, metal tubes for manufacturing props, wire fences, non-luminous metal beacons, cladding for building, fittings for buildings, namely, metal window fittings, clips for cables and pipes, shims, bolts, pillars for buildings, duckboards, drain pipes, rails, metal fish plates in the nature of hardware for fastening rails, partitions for building, ] non- luminous and non-mechanical metal signs, poles, [ bars for metal railings, scaffolding, stairs, ] stair treads, [ metal toilet partitions, ] Upright signboards of common metal, crash barriers, [ safety chains of metal, ] guard rails, [ non-luminous and non-mechanical signs and ] signaling panels [ for roads, wall linings, ] all the aforesaid goods for the purpose of protecting against accidents, including collisions and falling from ladders and work platforms and for the safety of machines, buildings, land vehicles, balustrades and railings; [ metal hardware for preventing slipping, namely, slats, shutterboxes, side frames, end caps, crank handles, pull straps, side tracks, ball bearings and installation hardware, namely, rollers, rails, cables, carriers, pins, locks, clips, brackets; all the aforesaid goods for both industrial and private use applications, ] all the aforesaid goods not forming part of housing or membrane keyboards | ACTIVE | — |
| 017 | Plastic in extruded form for use in manufacture, namely, sealing material, sealing rings, reinforcing materials for pipes not of metal, junctions not of metal, for pipes in the nature of pipe gaskets, non-metallic flexible pipes, weather-stripping compositions for use in factories, production plants, industrial buildings, public places, parking lots, airports, warehouses, [ floating anti-pollution barriers, soundproofing materials, insulating materials, ] Semi-processed synthetic raisin, semi-processed acrylic resins, padding materials of rubber or plastics, soldering threads of plastic material not for textile use, flexible tubes of plastic, rubber, threads of rubber not for textile use, rings of rubber for use as pipe connection seals, rubber stoppers for industrial packaging containers, flexible tubes of plastic and not of metal, door stops of rubber, plastic films for visually reflecting light for use in connection with road markings and signaling panels and markings for vehicles; all the aforesaid goods for both private and industrial applications; all the aforesaid goods not forming part of housings or membrane keyboards | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 14, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 26, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 26, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 26, 2025 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Nov 17, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 23, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Feb 21, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 22, 2025 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 22, 2025 | INPC | INVALIDATION PROCESSED | — |
| Nov 18, 2024 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Oct 18, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 15, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 14, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Dec 14, 2023 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Nov 23, 2023 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Sep 11, 2023 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| May 3, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| May 2, 2023 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| Apr 18, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 13, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 13, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jun 13, 2022 | NA15 | SEC. 15 ACKNOWLEDGEMENT - E-MAILED | — |
| Jun 13, 2022 | 15AK | REGISTERED - SEC. 15 ACKNOWLEDGED | — |
| Jun 13, 2022 | XXXX | POST REGISTRATION ACTION CORRECTION | — |
| Jun 12, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 8, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Sep 8, 2021 | E15R | TEAS SECTION 15 RECEIVED | — |
| Nov 17, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 17, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 7, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 11, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 20, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 20, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 17, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 17, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 1, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 1, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 12, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 12, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 12, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 25, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 25, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jul 14, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 14, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 13, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 13, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 25, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 13, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 13, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 13, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 27, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 26, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 26, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 12, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 25, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 25, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 24, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 23, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 20, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 16, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 16, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 13, 2014 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jun 12, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |