Drawing for RIGQUIP

USPTO serial 79147978

RIGQUIP

Reviewed by CopyMark Law Group

Reg. 4801596Status 404
Filing date
Status date
Registration date
Sep 1, 2015
Examiner
MACFARLANE, JAMES W
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RIGQUIP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Denys

Todd A. Denys PORZIO, BROMBERG & NEWMAN, P.C.600 ALEXANDER ROAD, SUITE 2-1Princeton, NJ 08540UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Drilling rigs; drilling equipment and parts, namely, derricks, mast structures of metal, crown blocks in the nature of mechanical pulley blocks as parts of machines, mud systems in the nature of machines for mixing and moving mud during drilling, power systems in the nature of electric power generators for drilling rigs, pipe handling machines, mud pumps, structural, mechanical and electrical parts specially designed for electric mud pumps, drawworks in the nature of hoists, structural, electrical and mechanical parts specially designed for drawworks in the nature of hoists, travelling blocks in the nature of mechanical pulley blocks as parts of machines, structural parts for travelling block in the nature of mechanical pulley blocks, dollies in the nature of structural parts for drilling rigs, stabbing baskets in the nature of structural and mechanical parts specially designed for drilling rigs, top drives in the nature of electrical, hydraulic and mechanical equipment and parts specially designed for rotating and providing drill string torque in drilling rigs, mud production equipment in the nature of machines for producing mud on drilling rigs, solids control equipment in the nature of machines for removing solids in the mud on drilling rigs, valves as machine components, blow out preventors in the nature of structural, mechanical and electrical parts and machines specially designed for drilling rigs, iron roughnecks in the nature of electrical, mechanical and structural parts specially designed for connecting and disconnecting tubulars on drilling rigs, rotary tables in the nature of structural, mechanical and electrical machines and parts specially designed for suspending and rotating the drill string on drilling rigs, handling tools in the nature of structural, electrical and mechanical parts and machines specially designed for handling tubulars on drilling rigs, alternating current (AC) drive systems in the nature of drives for machines, silicon-controlled rectifier (SCR) systems in the nature of drives for machines, and motors not for land vehicles; drilling equipment and parts, namely, drilling instrumentation in the nature of computer systems and electro-mechanical sensors including pressure sensors, level sensors, torque sensors, proximity sensors and encoders, all sold as integral components of drilling rigs; drilling equipment and parts, namely, control systems in the nature of electrical controls sold as integral components of drilling rigs; drilling equipment and parts, namely, control systems in the nature of hydraulic controls for machinesSECTION 70 - CANCELLED
009Drilling-related computer hardware and firmware for operating and monitoring drilling equipment and mud systems, and computer software for operating and monitoring drilling equipment and mud systemsSECTION 70 - CANCELLED
037Repair, maintenance, installation and commissioning, namely, bringing into operation, of drilling rigs and drilling rig equipment; installation, maintenance and repair of drilling-equipment-related computer hardwareSECTION 70 - CANCELLED
042Design and development of drilling equipment, including drilling equipment related computer hardware and software; computer programming on drilling equipment and systems; installation, maintenance and repair of drilling-equipment-related computer softwareSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 14, 2024DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Sep 14, 2024DETHDEATH OF INTERNATIONAL REGISTRATION
Sep 1, 2024REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Mar 24, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Mar 24, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 24, 202271AGREGISTERED-SEC.71 ACCEPTED
Mar 24, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 24, 2022PUNQOFFICE ACTION ISSUED- NO RESPONSE REQUIRED POU
Mar 21, 2022EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Sep 20, 2021PUM1OFFICE ACTION ISSUED POU1
Sep 17, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 1, 2021ES71TEAS SECTION 71 RECEIVED
Sep 1, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Mar 4, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 12, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 12, 2016FIMPFINAL DISPOSITION PROCESSED
Dec 1, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Sep 1, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 16, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jun 16, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 12, 2015GPNXNOTIFICATION PROCESSED BY IB
May 27, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
May 27, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
May 27, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
May 11, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
May 9, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
May 9, 2015XAECEXAMINER'S AMENDMENT ENTERED
May 9, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
May 9, 2015GNEAEXAMINERS AMENDMENT E-MAILED
May 9, 2015CNEAEXAMINERS AMENDMENT -WRITTEN
Mar 20, 2015CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Feb 27, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Feb 27, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 27, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 5, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 5, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 5, 2015ALIEASSIGNED TO LIE
Dec 19, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 7, 2014CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Sep 4, 2014ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2014REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 22, 2014RFNTREFUSAL PROCESSED BY IB
Jun 27, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 27, 2014RFRRREFUSAL PROCESSED BY MPU
Jun 27, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 26, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 21, 2014MAFRAPPLICATION FILING RECEIPT MAILED
Jun 17, 2014DOCKASSIGNED TO EXAMINER
Jun 17, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 12, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance