USPTO serial 79149015
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
NAVARRA DE TECNICAS DE SOLDADURA Y FIJACION, S.L.
E-31170 ARAZURI, NAVARRA, ES
Other trademarks owned by NAVARRA DE TECNICAS DE SOLDADURA Y FIJACION, S.L.
NAVARRA DE TECNICAS DE; SOLDADURA Y FIJACION, S.L.
E-31170 ARAZURI, NAVARRA, ES
Other trademarks owned by NAVARRA DE TECNICAS DE; SOLDADURA Y FIJACION, S.L.
NAVARRA DE TECNICAS DE; SOLDADURA Y FIJACION, S.L.
E-31170 ARAZURI, NAVARRA, ES
Other trademarks owned by NAVARRA DE TECNICAS DE; SOLDADURA Y FIJACION, S.L.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Sam Yip
Sam Yip Idea Intellectual LimitedNo. 49 Bo Ai Road, Zhongzheng District12F-1Taipei City, 10044| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; building materials of metal, namely, reinforcing materials of metal, flashing of metal, drywall corner bead of metal; transportable buildings of metal; metallic materials for railway tracks, namely, soffits of metal, metal panels, steel sheets, metal foil, tinfoil, arches of metal, cabins made of metal, cast iron, unwrought or semi-wrought; non-electric cables and wires of common metal; ironmongery and small items of metal hardware, namely, nails, screws, anchors, washers, bolts, nuts, slot nuts, thread rods, cotter pins, loads, and metal wire goods, metal turnbuckles, rivets; metal threaded fasteners, threaded metal rods, threaded bars of metal, screw threaded fasteners of metal, bolts of metal, stops of metal, metal joinery fittings, metal and metallic flanges, corrosion-resistant metal overlays and alloys for fittings, steel plates, flanges, piping components; metal cable wire, springs of metal, ferrules of metal, wire stretchers tension links, pot hooks of metal; cermets; metal threaded fasteners; fasteners, namely, metal bars and chains; pegs of metal; rivets, cramps and nails of metal; soldering wire of metal; metal building flashing; metal plugs; rails of metal; wire rope fittings of metal, namely, sockets; cable joints of metal; non-electric; metal pipe clips; rope thimbles of metal; crash barriers of metal for roads; solder wire of metal; bindings of metal; metal junction sleeves for non-electric cables; cable junction sleeves of metal; reinforcing materials of metal for pipes; non-automatic metal turnstiles; metal latch bars; anchor bolts of metal for bridge connection; bolts of metal; metal hardware, namely, springs; binding screws of metal for cables; tubes of metal; metal safes; metal strong boxes; goods of common metal, namely, metal gutter pipes; steel in the form of sheets, plates, foils and coils; back-up boards, back-up sheets, back-up panels, entry boards, entry sheets, and entry panels made out of metal for use in the operation of drilling holes in printed circuit boards; cladding of metal for construction and building; elbows of metal for pipes including those from alloy steel and titanium; metal pipe fittings for rigid pipes; metal pipes and metal fittings therefor; metal pipe fittings, namely, rosettes for rigid pipes; metal pipes and metal fittings therefor; manifolds of metal for pipelines; duckboards of metal; metal trellises; brackets of metal for building; tension links of metal; linings of metal for building purposes; sheet metal linings; metal partitions for building; ores; metal nuts; metal screws; alloys used for casting | SECTION 70 - CANCELLED | — |
| 035 | Advertising; business management; business administration; office functions; procurement services for others, namely, purchasing all kinds of metal hardware, including screws and all welding and fastening elements for all industrial purposes for other businesses; business information; business management assistance; commercial and industrial management assistance; commercial administration of the licensing of the goods and services of others; computerized file management; commercial representation services, namely, promotional marketing and representation services for sales to the public sector; business advice relating to franchising; organization of exhibitions for commercial or advertising purposes; auctioneering; administrative processing of purchase orders; sales promotion for others; outsourcing services; wholesale and retail store services and on-line retail store services featuring metal hardware, screws and all welding and fastening elements for all industrial sectors | SECTION 70 - CANCELLED | — |
| 039 | Transport and storage of goods; distribution services, namely, delivery of all kinds of metal hardware, screws and all welding and fastening elements for all industrial purposes for other businesses; packaging articles for transportation; rental of vehicles; rental of storage containers; vehicle towing; freight, transport and ship brokerage; freighting services | SECTION 70 - CANCELLED | — |
| 040 | Treatment of materials, namely, metal tempering; treatment of metals; finishing of metals; treatment of metals, namely, cold forming of metals; metal stamping, metal galvanizing, metal plating; metal machining; metal molding; metal punching; metal pressing, metal polishing, metal recycling, metal welding, heat treatment of metals | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 29, 2024 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Sep 29, 2024 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jun 16, 2024 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Mar 24, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 11, 2022 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jun 21, 2022 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Dec 2, 2021 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Dec 2, 2021 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Dec 2, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 25, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 15, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 16, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 21, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 21, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 4, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 4, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 3, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 26, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 8, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 5, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 5, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 16, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 16, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 4, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 31, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 31, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 11, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 11, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 11, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 21, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 16, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jan 28, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 28, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 28, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 28, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 28, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 22, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 21, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 21, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 16, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 28, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 28, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 25, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 24, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 17, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 17, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 11, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |