USPTO serial 79150211
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials including small parts, namely, soffits, bolts, nails, rivets, screws; transportable buildings mainly of metal; floorings, wall tiles, coverings for ceilings and window casement boxes and chimney shafts all mainly of metal; pre-fabricated and finished parts of buildings that are mainly of metal, namely, soffits, curtain walls; doors and inspection flaps as parts of doors that are all mainly of metal; prefabricated cabins for installation in ships and offshore oil platforms mainly of metal | SECTION 71 - CANCELLED | — |
| 019 | Non-metal building materials, namely, semi-worked woods, pre-cast concrete wall forms; transportable buildings of timber; floorings, wall tiles, wall panels, coverings for ceilings and window casement boxes and chimney shafts all mainly non-metal; pre-fabricated and finished parts of buildings that are mainly non-metal, namely, soffits, curtain walls, doors and inspection flaps as parts of doors that are all mainly non-metal; prefabricated cabins for installation in ships and offshore oil platforms mainly non-metal | SECTION 71 - CANCELLED | — |
| 037 | Assembly work in the nature of construction of buildings, maintenance and repair work in building construction, in industrial construction, in plant construction, in shipbuilding, in construction of offshore oil platforms, in pipeline construction, in steel construction and in container construction and in electrical engineering in the nature of electrical system installation; building construction services in measurement technique, in the fields of insulation for heat, insulation for cold, sound insulation, fire protection requirements related to fire alarm installation and protection against electromagnetic radiation in the nature of radiation source disposal services; interior construction of buildings, of ships and of offshore oil platforms | SECTION 71 - CANCELLED | — |
| 042 | Technical consulting in the field of environmental engineering, technical planning and development services, namely, product development and engineering services for others and technical project management for engineering services related to the organization and implementation of repair and maintenance work in the fields of building constructions, of industrial construction, of plant construction, of shipbuilding, of construction of offshore oil platforms, of pipeline construction, of steel construction and of container construction and of electrical engineering, of measurement technique, of insulation for heat, of insulation for cold, sound insulation, fire protection requirements and of protection against electromagnetic radiation, interior construction of buildings, of ships and of offshore oil platforms | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 24, 2024 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 6, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 5, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 5, 2022 | INPC | INVALIDATION PROCESSED | — |
| Sep 21, 2022 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 21, 2022 | C71T | CANCELLED SECTION 71 | — |
| Nov 20, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 4, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 4, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 7, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 7, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 21, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 17, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 1, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 1, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 1, 2015 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 13, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 4, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 12, 2015 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Feb 12, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 9, 2015 | PAPER RECEIVED | — | |
| Feb 5, 2015 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Feb 5, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 4, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jan 27, 2015 | FAXX | FAX RECEIVED | — |
| Jan 3, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Aug 29, 2014 | RFNP | REFUSAL PROCESSED BY IB | — |
| Aug 16, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 14, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 14, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 14, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 13, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 12, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 8, 2014 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Aug 7, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |