USPTO serial 79151155
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
SARA M DORCHAK
SARA M DORCHAK COLLARD & ROE PC1077 NORTHERN BLVDROSLYN, NY 11576UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and mechanical apparatus for the generation of compressed air, vacuum and air flow, namely, screw air compressors and reciprocating air compressors; compressors as machines, reciprocating compressors and screw compressors, namely, gas compressors; blowers for the compression, exhaustion and transport of gases; blowing machines; air suction machines; vacuum pumps being machines; replacement parts of the aforesaid goods, including central screw compressor units or central reciprocating compressor units; air machines, namely, compressed air machines; pneumatic transporters; compressed air machines; compressed air motors except for land vehicles; compressed air pumps; compressed air vessels being parts of machines; pressure tanks being parts of machines; pumps being parts of machines, motors or engines; turbines, other than for land vehicles; machine tools for the compression, exhaustion and transport of gases; pneumatic hammers; filters being parts of compressed air machines; air filters for motors and/or compressors; catalytic converters for the adsorption of hydrocarbon vapors, gas catalytic converters; activated carbon absorbers and catalytic converters, being parts of machines; activated carbon filters for use in compressed air systems, being parts of machines; high pressure filters being parts of compressed air machines; condensate separators being parts of machines; electric vacuum cleaners and their components; cooling devices, namely, cooling radiators for motors and engines; cooling radiators for motors, compressors or blowers; air condensers; condenser installations comprised of air condensers and air-cooled condensers; de-aerators being parts of machines; oil separators being parts of machines, including de-oilers for separating oil from air; replacement parts for compressors and machines; replacement parts for steam engine boilers; taps being parts of machines or motors; mechanical seals being parts of machines. compressed air main charging systems comprised of control devices for the regulation of compressed air, being parts of machines; compressed air reservoirs being parts of machines; regulators being parts of machines; speed governors for machines and motors; pressure regulators being parts of machines; valves being parts of machines, including pressure valves; pressure reduction valves being parts of machines; pneumatic controls for machines and motors; motors, other than motors for land vehicles; electric motors, other than for land vehicles; generators of electricity; machine housings, namely, housings for compressed air machines, vacuum pump machines, air suction machines, compressors and blowing machines; mounts for machines; stands for machines; tables specially adapted for holding machines; couplings and driving belts, other than for land vehicles; gear boxes, other than for land vehicles; ball-bearings for use in compressed air machines; shaft couplings being machines; cranks being parts of machines; crank shafts being parts of machines; machine wheels; axles for machines; pump diaphragms; superchargers for compressed air machines; turbo compressors for machines; fans for motors; anti-pollution devices for motors and/or compressors, being parts of machines and motors; heat exchangers being parts of machines; replacement parts of all the aforesaid goods; all of the aforesaid goods being for powering air tools, for use in connection with moles for trenchless laying of cables, for leakage tests, for shot-blasting with sand and other materials, for use in sprinkler irrigation, for use in repair shops and for use in field applications, such as construction sites, quarries and mining | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 13, 2024 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jul 26, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 8, 2024 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jun 28, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 15, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 2, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Aug 28, 2022 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 5, 2022 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 5, 2022 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 8, 2022 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 8, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 1, 2022 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Feb 1, 2022 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Feb 1, 2022 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Jan 3, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 6, 2019 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Dec 5, 2019 | OPNS | OPPOSITION NOTICE (IB REFUSAL) SENT TO IB | — |
| Dec 5, 2019 | OPNC | OPPOSITION NOTICE (IB REFUSAL) CREATED | — |
| Jul 1, 2019 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Jun 28, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 11, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 11, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 22, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 22, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 22, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 6, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 22, 2019 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Apr 22, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 5, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 4, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 4, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 12, 2018 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Oct 12, 2018 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Oct 12, 2018 | EPEN | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY | — |
| Oct 12, 2018 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Jul 24, 2018 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Jan 5, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 12, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 27, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 27, 2016 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 11, 2015 | GEA1 | NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED | — |
| Nov 11, 2015 | GECD | ACTION DENYING REQ FOR RECON E-MAILED | — |
| Nov 11, 2015 | CNCF | ACTION CONTINUING FINAL - COMPLETED | — |
| Nov 11, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 11, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 11, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 11, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 28, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 28, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 21, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 21, 2015 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Oct 21, 2015 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Oct 21, 2015 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Apr 22, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 22, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 22, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 19, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 19, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 12, 2015 | ALIE | ASSIGNED TO LIE | — |
| Mar 4, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 19, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 4, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 4, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 3, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 2, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 29, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 25, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 25, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 21, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |