Drawing for Serial No. 79151577

USPTO serial 79151577

Serial No. 79151577

Reviewed by CopyMark Law Group

Reg. 4975224Status 706Renewal
Filing date
Status date
Registration date
Jun 14, 2016
Examiner
MARCY, AMY ALFIERI
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with Serial No. 79151577?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $3,400

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy J. Maier

Timothy J. Maier Maier & Maier, PLLC345 South Patrick St.Alexandria, VA 22314United States

Goods and services

ClassDescriptionStatusFirst use
019[ Building materials not of metal, namely, cement mixes, Portland cement, roofing cement, hydraulic cement, mortars, mortar mix; stone for building and construction, tar-based concrete and asphalt patching compounds, tiles of clay, glass, gypsum, ceramic or earthenware for walls, floors and ceilings; granite, marble, lumber, bricks, wood and concrete beams, planks, non-metal suspended ceiling systems comprising panels; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments not of metal ]ACTIVE—
037Building construction, Building restoration, Construction of railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators, power plants, civil buildings, hospitals and industrial construction complexes in the public and private sectors; repairing of railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators and powerplants, civil buildings, hospitals and industrial construction complexes in the public and private sectors; installation services for elevators, lifts, windows, doors, walls, air handling units, generators, appliances and cooling towers, plumbing equipment, lightning systems, electrical systems, fire systems, sanitary fittings, flooring, ceiling systems, roofs in connection with railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators and powerplants, civil buildings, hospitals and industrial construction complexes in the public and private sectorsACTIVE—
040Treatment of building materials, namely, processing, finishing and polishing of stone articles and glass; treatment of wood building materials for preservation purposes, namely, processing, finishing and polishing of wood; recycling of waste and trashACTIVE—
042Scientific and technological services namely, research and design for utility, industrial and commercial companies and governments in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; industrial research for utility, industrial and commercial companies and governments in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; and industrial analysis for utility, industrial and commercial companies and governments, namely, consultation in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; design and development of hardware and softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 11, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 11, 202671AGREGISTERED-SEC.71 ACCEPTED—
Sep 7, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 15, 2026ES71TEAS SECTION 71 RECEIVED—
Jun 14, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Nov 22, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 25, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 3, 2023NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jul 3, 2023C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jul 1, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 14, 2022ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 1, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 19, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 14, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 16, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 28, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 28, 2016FIMPFINAL DISPOSITION PROCESSED—
Sep 14, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 14, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 29, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 29, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 25, 2016GPNXNOTIFICATION PROCESSED BY IB—
Mar 9, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 9, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 9, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 26, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Feb 18, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 10, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 10, 2016OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 2, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 2, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 2, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 23, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 23, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 23, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 29, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 29, 2015ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 2, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 1, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 1, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 1, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 4, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 4, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 4, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 4, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 25, 2014RFNTREFUSAL PROCESSED BY IB—
Sep 9, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 9, 2014RFRRREFUSAL PROCESSED BY MPU—
Sep 9, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 6, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 5, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 5, 2014DOCKASSIGNED TO EXAMINER—
Sep 5, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 4, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance