USPTO serial 79151578
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $850
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy J. Maier
Timothy J. Maier Maier & Maier, PLLC345 South Patrick St.Alexandria, VA 22314United States| Class | Description | Status | First use |
|---|---|---|---|
| 019 | [ Building materials not of metal, namely, cement mixes, Portland cement, roofing cement, hydraulic cement, mortars, mortar mix; stone for building and construction, tar-based concrete and asphalt patching compounds, tiles of clay, glass, gypsum, ceramic or earthenware for walls, floors and ceilings; granite, marble, lumber, bricks, wood and concrete beams, planks, non-metal suspended ceiling systems comprising panels; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments not of metal ] | SECTION 71 - CANCELLED | — |
| 037 | Building construction, Building restoration, Construction of railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects, namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators, power plants, civil buildings, hospitals and industrial construction complexes in the public and private sectors; repairing of railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects, namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators and powerplants, civil buildings, hospitals and industrial construction complexes in the public and private sectors; installation services for elevators, lifts, windows, doors, walls, air handling units, generators, appliances and cooling towers, plumbing equipment, lightning systems, electrical systems, fire systems, sanitary fittings, flooring, ceiling systems, roofs in connection with railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects, namely, water reservoirs, spillways, wells, river diversion tunnels, water pumping stations, water collection tunnels, pressure pipelines, penstocks, sluices, shafts, canals, intake structures, turbines, pumps, generators and powerplants, civil buildings, hospitals and industrial construction complexes in the public and private sectors | ACTIVE | — |
| 040 | [ Treatment of building materials, namely, processing, finishing and polishing of stone articles and glass; treatment of wood building materials for preservation purposes, namely, processing, finishing and polishing of wood; recycling of waste and trash ] | SECTION 71 - CANCELLED | — |
| 042 | [ Scientific and technological services, namely, research and design for utility, industrial and commercial companies and governments in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; industrial research for utility, industrial and commercial companies and governments in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; and industrial analysis for utility, industrial and commercial companies and governments, namely, consultation in the field of architectural and structural engineering design pertaining to railroads and subways, streets and motorways, airports and ports, bridges, viaducts and tunnels, dams, hydraulic and hydroelectric projects and powerplants, civil buildings, hospitals and industrial construction complexes; design and development of hardware and software ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 11, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 11, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 7, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 15, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 14, 2025 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Nov 22, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 7, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 6, 2024 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 6, 2024 | INPC | INVALIDATION PROCESSED | — |
| Feb 29, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 25, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 30, 2023 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jun 30, 2023 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jun 30, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 12, 2022 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jul 1, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 19, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 14, 2021 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 12, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 21, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 21, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 14, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 14, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 29, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 29, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 25, 2016 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 9, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 9, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 9, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 26, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 24, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 18, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 10, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 10, 2016 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 2, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 2, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 2, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 2, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 2, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 2, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 5, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 5, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 5, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 2, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Apr 17, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 17, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 17, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 19, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 19, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 12, 2015 | ALIE | ASSIGNED TO LIE | — |
| Mar 4, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 4, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 25, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 9, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 9, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 9, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 6, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 5, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 5, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 5, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 4, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |