USPTO serial 79151729
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,550
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Claudia W. Stangle
Claudia W. Stangle LEYDIG, VOIT & MAYER, LTD.180 N. STETSON AVESuite 4900CHICAGO, IL 60601| Class | Description | Status | First use |
|---|---|---|---|
| 009 | ELECTRIC APPARATUS AND INSTRUMENTS FOR ELECTRICAL ENGINEERING, NAMELY, FOR CONDUCTING, CONVERTING, STORAGE, REGULATING AND CONTROLLING OF ELECTRIC CURRENT, ELECTRIC VOLTAGE, ELECTRIC ENERGY, AND ELECTRIC POWER, IN CONNECTION WITH TRANSFORMERS, POWER TRANSFORMERS, DISTRIBUTION TRANSFORMERS, PHASE ANGLE REGULATING TRANSFORMERS, TAP CHANGERS ON TRANSFORMERS, MOTOR DRIVES FOR SUCH TAP CHANGERS, VOLTAGE CONTROLLERS, CURRENT CONTROLLERS, POWER CONTROLLERS, REACTIVE POWER CONTROLLERS, UNIFIED POWER FLOW CONTROLLERS (UPFC), FLEXIBLE AC TRANSMISSION SYSTEMS (FACTS), STATIC SYNCHRONOUS COMPENSATORS (STATCOM), STATIC VAR COMPENSATOR (SVC), VARIABLE OR INVARIABLE INDUCTORS FOR REACTIVE POWER CONTROL, VARIABLE OR INVARIABLE CAPACITORS FOR REACTIVE POWER CONTROL, ELECTRIC OR ELECTRONIC FILTERS FOR ELECTRICAL GRIDS, ELECTRIC SENSORS, AND ELECTRIC OR ELECTRONIC CONTROL APPARATUS, THE AFORESAID APPARATUS AND INSTRUMENTS FOR ACTIVATING, CONTROLLING, REGULATING, MONITORING, TESTING AND SUPERVISION OF THE OPERATING STATE AND OPERATING ABILITY OF TRANSFORMERS, OF ADVANCE-RETARD SWITCHES FOR USE IN PHASE SHIFT TRANSFORMERS, OF TAP CHANGERS ON TRANSFORMERS, AND OF MOTOR DRIVES FOR SUCH TAP CHANGERS, NONE OF THE AFORESAID GOODS BEING IN RELATION TO LOCKS, ELECTRONIC LOCKS, ALARM SYSTEMS AND ACCESS CONTROL SYSTEMS, TO MEASURING APPARATUSES FOR GEOMETRICAL QUANTITIES AND TO MEASURING DEVICES FOR GEOMETRICAL QUANTITIES; ELECTRIC APPARATUS AND INSTRUMENTS FOR ELECTRICAL ENGINEERING, NAMELY, TRANSFORMERS, POWER TRANSFORMERS, DISTRIBUTION TRANSFORMERS, PHASE ANGLE REGULATING TRANSFORMERS, TAP CHANGERS ON TRANSFORMERS, VOLTAGE CONTROLLERS, CURRENT CONTROLLERS, POWER CONTROLLERS, REACTIVE POWER CONTROLLERS, UNIFIED POWER FLOW CONTROLLERS (UPFC), POWER LINE TRANSMISSION MACHINES AND APPARATUS, NAMELY, FLEXIBLE AC TRANSMISSION SYSTEMS (FACTS), STATIC SYNCHRONOUS COMPENSATORS (STATCOM), STATIC VAR COMPENSATOR (SVC), VARIABLE OR INVARIABLE ELECTRICAL INDUCTORS FOR REACTIVE POWER CONTROL, VARIABLE OR INVARIABLE CAPACITORS FOR REACTIVE POWER CONTROL, ELECTRIC OR ELECTRONIC FILTERS FOR ELECTRICAL GRIDS, ELECTRIC SENSORS, AND ELECTRIC OR ELECTRONIC CONTROL APPARATUS, THE AFORESAID APPARATUS AND INSTRUMENTS FOR ACTIVATING, CONTROLLING, REGULATING, MONITORING, TESTING AND SUPERVISION OF THE OPERATING STATE AND OPERATING ABILITY OF TRANSFORMERS, OF ADVANCE-RETARD SWITCHES FOR USE IN PHASE SHIFT TRANSFORMERS, OF TAP CHANGERS ON TRANSFORMERS, AND OF MOTOR DRIVES FOR SUCH TAP CHANGERS, NONE OF THE AFORESAID GOODS BEING IN RELATION TO LOCKS, ELECTRONIC LOCKS, ALARM SYSTEMS AND ACCESS CONTROL SYSTEMS, TO MEASURING APPARATUSES FOR GEOMETRICAL QUANTITIES AND TO MEASURING DEVICES FOR GEOMETRICAL QUANTITIES; ELECTRIC APPARATUS AND INSTRUMENTS FOR WEAK-CURRENT ENGINEERING, NAMELY, FOR MEASURING, CALCULATING, CONTROLLING AND REGULATING OF ELECTRIC CURRENT, ELECTRIC VOLTAGE, ELECTRIC ENERGY, AND ELECTRIC POWER, IN CONNECTION WITH VOLTAGE CONTROLLERS, CURRENT CONTROLLERS, POWER CONTROLLERS, ELECTRIC OR ELECTRONIC FILTERS FOR ELECTRICAL GRIDS, ELECTRIC SENSORS, AND ELECTRIC OR ELECTRONIC CONTROL APPARATUS, NONE OF THE AFORESAID GOODS BEING IN RELATION TO LOCKS, ELECTRONIC LOCKS, ALARM SYSTEMS AND ACCESS CONTROL SYSTEMS, TO MEASURING APPARATUSES FOR GEOMETRICAL QUANTITIES AND TO MEASURING DEVICES FOR GEOMETRICAL QUANTITIES; ELECTRIC APPARATUS AND INSTRUMENTS FOR WEAK-CURRENT ENGINEERING, NAMELY, VOLTAGE CONTROLLERS, CURRENT CONTROLLERS, POWER CONTROLLERS, ELECTRIC OR ELECTRONIC FILTERS FOR ELECTRICAL GRIDS, ELECTRIC SENSORS, AND ELECTRIC OR ELECTRONIC CONTROL APPARATUS, NONE OF THE AFORESAID GOODS BEING IN RELATION TO LOCKS, ELECTRONIC LOCKS, ALARM SYSTEMS AND ACCESS CONTROL SYSTEMS, TO MEASURING APPARATUSES FOR GEOMETRICAL QUANTITIES AND TO MEASURING DEVICES FOR GEOMETRICAL QUANTITIES; APPARATUS, INSTRUMENTS AND COMPUTER PROGRAMS FOR ACTIVATING, CONTROLLING, REGULATING, MONITORING, TESTING AND SUPERVISION OF THE OPERATING STATE AND OPERATING ABILITY OF TRANSFORMERS, OF ADVANCE-RETARD SWITCHES FOR USE IN PHASE SHIFT TRANSFORMERS, OF REACTIVE POWER CONTROLLERS, OF UNIFIED POWER FLOW CONTROLLERS (UPFC), OF FLEXIBLE AC TRANSMISSION SYSTEMS (FACTS), OF STATIC SYNCHRONOUS COMPENSATORS (STATCOM), OF STATIC VAR COMPENSATOR (SVC), OF VARIABLE OR INVARIABLE INDUCTORS FOR REACTIVE POWER CONTROL, OF VARIABLE OR INVARIABLE CAPACITORS FOR REACTIVE POWER CONTROL, OF TAP CHANGERS ON TRANSFORMERS, AND OF MOTOR DRIVES FOR SUCH TAP CHANGERS, NONE OF THE AFORESAID GOODS BEING IN RELATION TO LOCKS, ELECTRONIC LOCKS, ALARM SYSTEMS AND ACCESS CONTROL SYSTEMS, TO MEASURING APPARATUSES FOR GEOMETRICAL QUANTITIES AND TO MEASURING DEVICES FOR GEOMETRICAL QUANTITIES | ACTIVE | — |
| 037 | INSTALLATION, SERVICING, MAINTENANCE AND REPAIR OF ELECTRIC APPARATUS AND INSTRUMENTS FOR ELECTRICAL ENGINEERING, NAMELY, COMPUTERS, COMPUTER HARDWARE, COMPUTER PERIPHERALS, ELECTRICAL CONTROLLERS, AND ELECTRICAL CONTROL SYSTEMS FOR MEASURING, CALCULATING, CONTROLLING, AND REGULATING TECHNOLOGY; INSTALLATION, SERVICING, MAINTENANCE AND REPAIR OF ELECTRIC APPARATUS AND INSTRUMENTS FOR CONDUCTING, CONVERTING, STORAGE, REGULATING AND CONTROLLING OF ELECTRIC CURRENT, ELECTRIC VOLTAGE, ELECTRIC ENERGY, AND ELECTRIC POWER; INSTALLATION, SERVICING, MAINTENANCE AND REPAIR OF TRANSFORMERS, OF POWER TRANSFORMERS, OF DISTRIBUTION TRANSFORMERS, OF PHASE ANGLE REGULATING TRANSFORMERS, OF TAP CHANGERS ON TRANSFORMERS, OF MOTOR DRIVES FOR SUCH TAP CHANGERS, OF VOLTAGE CONTROLLERS, OF CURRENT CONTROLLERS, OF POWER CONTROLLERS, OF REACTIVE POWER CONTROLLERS, OF UNIFIED POWER FLOW CONTROLLERS (UPFC), OF FLEXIBLE AC TRANSMISSION SYSTEMS (FACTS), OF STATIC SYNCHRONOUS COMPENSATORS (STATCOM), OF STATIC VAR COMPENSATOR (SVC), OF VARIABLE OR INVARIABLE INDUCTORS FOR REACTIVE POWER CONTROL, OF VARIABLE OR INVARIABLE CAPACITORS FOR REACTIVE POWER CONTROL, OF ELECTRIC OR ELECTRONIC FILTERS FOR ELECTRICAL GRIDS, OF ELECTRIC SENSORS, AND OF ELECTRIC OR ELECTRONIC CONTROL APPARATUS; INSTALLATION, SERVICING, MAINTENANCE AND REPAIR OF ELECTRIC APPARATUS AND INSTRUMENTS FOR WEAK-CURRENT ENGINEERING, NAMELY, COMPUTERS, COMPUTER HARDWARE, COMPUTER PERIPHERALS, ELECTRICAL CONTROLLERS, AND ELECTRICAL CONTROL SYSTEMS FOR MEASURING, CALCULATING, CONTROLLING, AND REGULATING TECHNOLOGY; INSTALLATION, SERVICING, MAINTENANCE AND REPAIR OF ELECTRIC APPARATUS AND INSTRUMENTS FOR MEASURING, CALCULATING, CONTROLLING AND REGULATING OF ELECTRIC CURRENT, ELECTRIC VOLTAGE, ELECTRIC ENERGY, AND ELECTRIC POWER; INSTALLATION, SERVICING, MAINTENANCE AND REPAIR OF VOLTAGE CONTROLLERS, OF CURRENT CONTROLLERS, OF POWER CONTROLLERS, OF ELECTRIC OR ELECTRONIC FILTERS FOR ELECTRICAL GRIDS, OF ELECTRIC SENSORS, AND OF ELECTRIC OR ELECTRONIC CONTROL APPARATUS | ACTIVE | — |
| 042 | INSTALLATION, MAINTENANCE, SERVICING AND REPAIR OF COMPUTER PROGRAMS FOR ACTIVATING, CONTROLLING, REGULATING, MONITORING, TESTING AND SUPERVISION OF THE OPERATING STATE AND OPERATING ABILITY OF TRANSFORMERS, OF ADVANCE-RETARD SWITCHES FOR USE IN PHASE SHIFT TRANSFORMERS, OF REACTIVE POWER CONTROLLERS, OF UNIFIED POWER FLOW CONTROLLERS (UPFC), OF FLEXIBLE AC TRANSMISSION SYSTEMS (FACTS), OF STATIC SYNCHRONOUS COMPENSATORS (STATCOM), OF STATIC VAR COMPENSATOR (SVC), OF VARIABLE OR INVARIABLE INDUCTORS FOR REACTIVE POWER CONTROL, OF VARIABLE OR INVARIABLE CAPACITORS FOR REACTIVE POWER CONTROL, OF TAP CHANGERS ON TRANSFORMERS, AND OF MOTOR DRIVES FOR SUCH TAP CHANGERS, NONE OF THE AFORESAID SERVICES BEING IN RELATION TO LOCKS, ELECTRONIC LOCKS, ALARM SYSTEMS AND ACCESS CONTROL SYSTEMS | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 6, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 18, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 15, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jun 15, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jun 15, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 25, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jul 8, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 8, 2025 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 8, 2025 | EWOR | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED | — |
| Jul 8, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 8, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 8, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 8, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 29, 2025 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Feb 23, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 26, 2022 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jul 26, 2022 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jul 19, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 7, 2022 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Dec 10, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 29, 2021 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 10, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 16, 2017 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 5, 2017 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 6, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 30, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 30, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 29, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 29, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 26, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 10, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 10, 2016 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 15, 2016 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 12, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 12, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 28, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 24, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 23, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 14, 2015 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Dec 4, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 4, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 4, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 4, 2015 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Nov 27, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 25, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 25, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 25, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 25, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 18, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 18, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 18, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 28, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 28, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 23, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 21, 2015 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Oct 14, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 13, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 13, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 19, 2015 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 19, 2015 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 19, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 23, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 23, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 23, 2015 | ALIE | ASSIGNED TO LIE | — |
| Mar 13, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 3, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 15, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 15, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 13, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 12, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 9, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 5, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 5, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 4, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |