Drawing for FERROMONT

USPTO serial 79152006

FERROMONT

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
Examiner
RICHARDS, LESLIE
Law office
TMEG LAW OFFICE 106 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FERROMONT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines and machine tools; namely customized special-purpose machines for plants, customized plant sections and their componentsSECTION 70 - CANCELLED
009Scientific, surveying, optical, weighing, measuring, signalling, and checking apparatus and instruments; apparatus and instruments for conducting, switching, transforming, storing, regulating and controlling electricity; data processing equipment and computers; in particular electrical and electronic control and operation systems (not included in other classes) for machines and motors; electrical distribution, measuring and control cabinets and distributor panels, terminal boards; control panels; electrical switching devices; electric switchgears; switchboards for electricity; circuits; integrated circuits; switches, in particular circuit breaker switches; remote switches; remote control apparatus; electrical systems for the control of industrial operational procedure; electrical control apparatus; pneumatic and solenoid valve distributors; lift control systems; electrical switch cabinets; electrical and electronical equipment safety cabinets; terminal boxes; fire detection systems; software, in particular for supervising and controlling machines; electrical and electronic control systems; all in the fields and for the purpose of plant construction, operation and maintenance and the relevant machinerySECTION 70 - CANCELLED
037Construction consultation building construction supervision and advisory services; construction project management services; on site project management and accompanying services relating to the construction and relocation of buildings; construction of buildings; relocation dismantling, re-fitting of and customized maintenance services for plants; hire of tools for construction, repair, installation of plants; mechanical and electrical machinery engineering, installation, maintenance and repair; installation, maintenance and repair of electrical and generating machinery; installation and maintenance of piping systems; all particularly in the fields of energy generation, pulp, paper, stone, earth, cement, wood, fibre, steel and metallurgy processing, storage and conveying systems; assembly services, relating to the installation of machinesSECTION 70 - CANCELLED
040Material treatment related to and for the purpose of plant construction, operation and maintenance and the relevant machinery and systems, in particular custom manufacture of special purpose machinery and customized plant components as well as the relevant spare parts; manufacture of steel structures, platforms, stairs, handrails made of aluminium, carbon steel and stainless steel; treating and bending of metal and pipes with machines; welding; manufacture of pipesSECTION 70 - CANCELLED
042Scientific and technological services and research work and related designer services; industrial testing and research services; design and development of customized software applications; engineering, engineering work, in particular in connection with the preparation of calculations, in connection with machines and engineering plants and control, measuring, and checking apparatus for the aforementioned machines and plants; electrical engineering services; engineering services for the design of machinery; process visualization; process control engineering; all related to and for the purpose of plant construction, operation and maintenance and the relevant machinery and systems particularly in the fields of energy generation, pulp, paper, stone, earth, cement, wood, fibre, steel and metallurgy processing, storage and conveying systemsSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 30, 2024DETHDEATH OF INTERNATIONAL REGISTRATION
Sep 30, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB
Mar 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Feb 2, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED
May 13, 2016FINTFINAL DECISION TRANSACTION PROCESSED BY IB
Apr 27, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB
Apr 27, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 11, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Feb 24, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 24, 2016OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 27, 2015MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 27, 2015ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Oct 17, 2014RFNTREFUSAL PROCESSED BY IB
Sep 29, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 29, 2014RFRRREFUSAL PROCESSED BY MPU
Sep 27, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 26, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 26, 2014MAFRAPPLICATION FILING RECEIPT MAILED
Sep 22, 2014DOCKASSIGNED TO EXAMINER
Sep 22, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 18, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB