USPTO serial 79152037
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Stewart J. Bellus
STEWART J. BELLUS COLLARD & ROE, P.C.1077 NORTHERN BLVDROSLYN, NY 11576UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 002 | Stainless steel in foil and powder form for painters, decorators, printers and artists | SECTION 71 - CANCELLED | — |
| 006 | Chrome iron ores concentrate, iron ore and calcine chromite concentrate, chromite ore, chromium pellets, processing slags from production of ferrochrome and stainless steel in powder, granule or pellets form; ferrochrome in powder, granule or slab form in the nature of stainless steel plates, sheets, strips, bars, rods, sealing and gasket rings, foils, non-electric wires, welding wires, sheet metal blanks, sheet metal pile sections, punched, deep-drawn, rolled and bent metal replacement parts, rivets and cold-formed parts, truncheons, slabs, cast blocks, pipes, seamless and welded tubes, forged, continuous casting and cast parts made of stainless steel, goods made of common metals and alloy metals or non-rusting steels, namely, containing nickel, chromium, iron, copper, zirconium, titanium, niobium, tantalum, manganese, cobalt, aluminium, magnesium, zinc, tin, lead, molybdenum and their alloys, namely, for use as components in building gas and steam turbines, kettles construction and the construction of heating and power station buildings as well as for use as structural parts in the chemical and petrochemical industry, nuclear energy technology industry, the electronics industry, the electrical engineering industry, in offshore industry, the car and aviation industry, medical technology industry and architecture industry; unwrought and semi-wrought common metals and alloy metals; semi-finished products and metal goods, namely, of stainless steel, nickel, chromium, iron, copper, zirconium, titanium, cobalt, molybdenum, aluminium, magnesium, niobium, tantalum, manganese, zinc, tin, lead and their alloys, namely, in the form of rods, non-electric wires, pipes, tubes, wirebars, bars, slabs, billets, blooms, sheets, plates, strips, foils, profiles, poles, springs, fittings; semi-finished products of brass, namely, in form of rods, non-electric wires, wirebars, bars, slabs, billets, blooms, sheets, plates, strips; semi-finished products of magnetic raw materials, particular into configuration by strips, sheets, foils, wires, rods, profiles, namely, as structural parts in the electronics industry, the electrical engineering industry; raw and semi-wrought non-ferrous alloys metals made of nickel, chromium, iron, copper, zirconium, titanium, cobalt, molybdenum, aluminium, magnesium, niobium, tantalum, manganese, zinc, tin, lead and their alloys in blocks, slabs, plates, sheets, bars, rods, seamless or welded tubes, sheet metal blanks, truncheons, cast products, stretched, rolled, pressed, forged; shaped parts of metal, namely, in form of rods, non-electric wires, pipes, tubes, wirebars, bars, slabs, billets, blooms, sheets, plates, strips, foils, profiles, poles, springs, fittings; bronze bars, pipes tubes, strips and bronze tubes for conduits; compound metals where the core metal and coating metal are welded or soldered together, namely, in the form of rods, non-electric non-electric wires, pipes, tubes, wirebars, bars, slabs, billets, blooms, sheets, plates, strips, foils, profiles, poles, springs, fittings; welding additive materials of stainless steel and nickel alloy filler metals, including, metal maintenance rods, metal welding wiring and metal flux-cord wire; components and prepared metal components and thereof alloys for the electrolytic extraction by zinc, namely, plates; products of stainless steel in form of rods, non-electric wires, pipes, tubes, wirebars, bars, slabs, billets, blooms, sheets, plates, strips, foils, profiles, poles, springs, fittings for pipe and tubes; stainless steel and nickel alloy filler metals; stainless steel for architecture, building and construction, transport, industrial equipments, catering and household; non-precious metal goods not included in other classes, namely, decoration of stainless steel | SECTION 71 - CANCELLED | — |
| 007 | Rolling machines for stainless steel tubes, pipes, rods, wires, wirebars, bars, slabs, billets, blooms, plates, sheets, strips, and foils; machine parts, namely, valves, springs | SECTION 71 - CANCELLED | — |
| 009 | Electrical resistors; electric measuring, precision and slide resistors; electric dropping resistors for measuring instruments, electric shunt-wound resistors for ammeters, electric starter resistors, electric load resistors, electric regulation and control resistors, electric heating resistances; anodes; circuit boards; wires of common metals and thereof alloys, namely, of nickel, chromium, cobalt, iron and thereof alloys of common metal for electric purposes; electric heating conductors and electric resistors of metallic raw materials into configuration by wires, strips, foils and spirals; construction parts, namely, being parts by fuel cells of common metals, in particular, irons and chromium | SECTION 71 - CANCELLED | — |
| 011 | Semi-products and products, namely, parts and components for refrigeration, air-conditioning and heating systems in the nature of pipes and tubes of stainless steel; heat exchangers of stainless steel not parts of machines | SECTION 71 - CANCELLED | — |
| 040 | Treatment of stainless steel | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological consultancy relating to mining exploration, metallurgy and energy producing, metal working, environmental protection and non-organic chemical industry | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 29, 2024 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Apr 29, 2024 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Dec 27, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 28, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 28, 2022 | INPC | INVALIDATION PROCESSED | — |
| Oct 25, 2022 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 25, 2022 | C71T | CANCELLED SECTION 71 | — |
| Feb 16, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 3, 2016 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 5, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 21, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 21, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 11, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 8, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 11, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 26, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 22, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 6, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 6, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 6, 2015 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 18, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 18, 2015 | ALIE | ASSIGNED TO LIE | — |
| Mar 30, 2015 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Mar 27, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 27, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 27, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 6, 2015 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 4, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 12, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 12, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 12, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 12, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 17, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 2, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 2, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 2, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 1, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 26, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 22, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 22, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 18, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |