Drawing for RHOMBERG SERSA RAIL GROUP

USPTO serial 79153289

RHOMBERG SERSA RAIL GROUP

Reviewed by CopyMark Law Group

Reg. 4750151Status 709
Filing date
Status date
Registration date
Jun 9, 2015
Examiner
TENG, SIMON
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RHOMBERG SERSA RAIL GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; metal building materials, namely, soffits, fascia, ceiling boards, and floor boards; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; small items of metal hardware, namely, ironmongery in the nature of metal garden stakes; pipes and tubes of metal; figures of common metal; beams of metal; metal rails; metal shelter supporting structures; metal fish plates in the nature of hardware for fastening rails; steel buildings; materials of metal for railway constructionSECTION 71 - CANCELLED—
007Casting machines; machine tools, namely, compressing machines; motors and engines except for land vehicles; machine coupling and transmission components except for land vehicles; agricultural implements other than hand-operated, namely, hay balers, incorporators, coulters, and seed drills; machines for manufacturing railway tracks; railway track construction machine tools in the nature of railway track laying machines; railroad constructing machines, namely, machines for cutting railway tracksSECTION 71 - CANCELLED—
035Advertising services; business management; business administration; providing office functions; advertising and sales promotion in relation to railway construction, railway track construction, and railway track laying; business consulting and business efficiency expert services in the fields of railway construction, railway track construction, and railway track layingSECTION 71 - CANCELLED—
037Building construction; repair and installation of railway tracks; construction of railways; construction of railway tracks; construction of permanent ways for railways; modernized repair, restoration, maintenance, and renovation in the field of structural railway tracks; maintenance services in the field of railway tracks; installation and replacement services in the field of railway tracks; repair, installation, restoration, maintenance, and servicing of railway tracks and railway platforms; repair, maintenance, and installation advisory and consultancy services in the field of railway tracks; providing information in the field of repair, maintenance, and installation of railway tracks; rental of railway track construction machines and track laying construction machinesSECTION 71 - CANCELLED—
042Scientific and technological services, namely, product research and new product design services in the field of railway tracks; industrial analysis and research services in the field of engineering of railway tracks; design and development of computer hardware and software; technical consultation services in the nature of civil engineering in the fields of rail traffic route construction, railway construction, and railway track construction; scientific and technological services, namely, scientific research in the fields of railway construction, rail traffic route construction, and railway track construction; research and testing on civil engineering in the fields of rail traffic route construction, railway construction and railway track construction; engineering consultancy, information and support in the field of civil engineering relating to rail traffic route construction, railway construction, and railway track constructionSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 8, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 20, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 26, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 24, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 26, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 26, 2022INPCINVALIDATION PROCESSED—
Aug 24, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 24, 2021C71TCANCELLED SECTION 71—
Jun 9, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 17, 2015FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 30, 2015FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 30, 2015FIMPFINAL DISPOSITION PROCESSED—
Sep 9, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 17, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 9, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 4, 2015GPNXNOTIFICATION PROCESSED BY IB—
Mar 24, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 24, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 18, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 18, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 4, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 14, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 13, 2015ALIEASSIGNED TO LIE—
Jan 27, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 26, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 26, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 26, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 26, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 21, 2014RFNTREFUSAL PROCESSED BY IB—
Nov 6, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 6, 2014RFRRREFUSAL PROCESSED BY MPU—
Nov 5, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 4, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 4, 2014DOCKASSIGNED TO EXAMINER—
Oct 30, 2014RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Oct 29, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 28, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 21, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 17, 2014DOCKASSIGNED TO EXAMINER—
Oct 17, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 16, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance