USPTO serial 79153344
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anna Kurian Shaw
Anna Kurian Shaw Hogan Lovells US LLP555 13th Street NWWashington, DC 20004UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Wind-powered machines, namely, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy; turbines, namely, wind turbines; structural parts and accessories for such wind-powered machines, namely, rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power units in the nature of auxiliary power units for supplying electrical power ] | SECTION 71 - CANCELLED | — |
| 009 | [ Switch cabinets, namely, cabinets specifically designed to house electric switches, electrical and electronic instruments and apparatus for recording, processing, storage and transmission of data from wind power plants and wind farms, namely, computer hardware and computer software to measure wind speed, the sun's position, solar radiation flux density, air temperature, air pressure, relative humidity, photovoltaic module temperature, and other data relevant to wind power plants and wind farms, switch cabinets in the nature of electrical and electronic control apparatus and instruments for wind power plants and wind farms, electrical and electronic voltage and current regulators for wind power plants and wind farms, electrical and electronic regulating, checking, supervision, control and monitoring apparatus and instruments for wind power plants and wind farms, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants, data processing apparatus, computer hardware, computer software for operating, monitoring and regulating wind power plants and wind farms; computer software for calculating the dimensions of wind farms and the surrounding land, as well as calculating their efficiency, and computer software for calculating the dimensions of rotors used on the wind mills in wind farms, computer interface boards and graphical user interface software, voltage surge protectors; electronic vibration sensors, measuring apparatus, namely, meters for measuring electricity in watt-hours, inverter units, namely, electric converters and electric transformers, all of the foregoing for wind power plants and wind farms ] | SECTION 71 - CANCELLED | — |
| 035 | [ Professional business consultancy with regard to wind power plants and wind farms ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building construction in the field of wind power plants; installation services, namely, installation of towers, turbines, electrical and computer hardware systems for wind power plants and farms; maintenance and rebuilding of wind powered machines that have been worn or partially destroyed; maintenance and repair of wind power plants; installing rotor blades in wind turbines for others ] | SECTION 71 - CANCELLED | — |
| 040 | [ Production of energy using wind power; generation of electricity using wind power ] | SECTION 71 - CANCELLED | — |
| 042 | [ Remote maintenance, remote control and remote monitoring of wind power plants and wind farms through computerized retrieval of data via the Internet; ] conducting technical measurements, inspections for taking technical measurements, and calculations in the field of wind power plants and wind farms using remote measuring devices in the nature of computer software, as well as aerial digital imaging, to measure the exterior features of wind power plants and wind farms [ ; electronic data storage; surveying, namely, reviewing the engineering data collected in the field of wind power plants and wind farms and analyzing the results of said surveys; design and development of computer software in the field of wind power plants and wind farms; technical consultancy in engineering, engineering services, namely, technical planning and technical development services as well as technical project management of wind power plants projects; new product engineering for others, namely, designing rotor blades for others; technical research in the field of wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; technical quality monitoring services of rotor blades ] | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 26, 2024 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Oct 26, 2024 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 10, 2024 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Dec 20, 2022 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 9, 2022 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Nov 9, 2022 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Oct 15, 2022 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 16, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 15, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Feb 15, 2022 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Feb 14, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 13, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 15, 2021 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jan 27, 2016 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Nov 12, 2015 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 4, 2015 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 27, 2015 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 11, 2015 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 11, 2015 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 10, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 12, 2015 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Mar 12, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 10, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 25, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 8, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 5, 2014 | NPUB | NOTICE OF PUBLICATION | — |
| Oct 21, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 21, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 21, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 21, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 21, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 20, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 20, 2014 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 20, 2014 | ALIE | ASSIGNED TO LIE | — |
| Oct 20, 2014 | CNEA | EXAMINER'S AMENDMENT MAILED | — |
| Oct 20, 2014 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 20, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 17, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 17, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 16, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |