USPTO serial 79153709
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jennifer M. Hetu
Jennifer M. Hetu Honigman Miller Schwartz and Cohn LLP39400 Woodward Avenue, Suite 101Bloomfield Hills, MI 48304UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Water intake apparatus, namely, equipment for treating groundwater and soil comprising distribution lines, distribution manifolds, drop tubes, well seals and blowers; fittings for gas and water apparatus and pipes, namely, bibs, cocks, sink strainers, traps, valves, aerators for faucets, couplers, drains, faucet filters, shower control valves, spouts, baffles; water-softening apparatus and installations; water desalination plants; filters for drinking water; biogas generators; purification installations for sewage; cooling installations in the nature of water coolers, water cooling towers, and beverage-cooling apparatus; cooling installations for water; economisers, namely, devices for warming feed water in heating boilers; regulating and safety accessories for water or gas apparatus and pipes, namely, metered valves, pressure regulators, flashback arrestors and reverse flow check valves for gas pipes; biogas clarifying installations in the nature of biogas fermentation reactors, namely, percolating fermenters and dry fermenters; pipes and tubes being parts of hot water heating systems through which warm or high temperature circulates; coils as parts of distilling, heating or cooling installations; safety equipment for water and gas apparatus or for water and gas pipes, namely, vacuum release safety valve for flow shutoff for water and biogas plants; water-heating installations, namely, water heaters; steam valves for steam-heating installations; regulating accessories for water or gas apparatus and pipes; water-filtering apparatus; water supply installations, namely, drainage water treatment tanks, hot water tanks, waste water treatment tanks, water purification tanks; pipes being parts of sanitary facilities; water conduits installations, namely, pipes being parts of sanitary facilities, pipes for heating boilers, flexible pipes being parts of sink plumbing installations and basin plumbing installations; water softening apparatus and installations; water purification installations; water purification apparatus and machines; flushing apparatus, namely, automatic flush valves for toilets, flush levers, flushometer valves, flushometers; heat pumps; heat exchangers not parts of machines | SECTION 71 - CANCELLED | — |
| 037 | Installation and repair of irrigation devices; drilling of wells; construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities, building construction; pipeline construction and maintenance; pump repair; plumbing; rental of earth-moving machines; underwater construction; underwater repair; heating equipment installation and repair | SECTION 71 - CANCELLED | — |
| 042 | Geological prospecting; conducting geological surveys; engineering; construction drafting; engineering drawing | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 23, 2024 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Nov 23, 2024 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jan 31, 2023 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 14, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 14, 2022 | INPC | INVALIDATION PROCESSED | — |
| Nov 25, 2022 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 25, 2022 | C71T | CANCELLED SECTION 71 | — |
| Sep 8, 2020 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 15, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 25, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 25, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 8, 2015 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 8, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 23, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 23, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 3, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 15, 2015 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 14, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 14, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 14, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 14, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 14, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 23, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 23, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 23, 2015 | ALIE | ASSIGNED TO LIE | — |
| Apr 22, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 28, 2014 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 7, 2014 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 7, 2014 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 7, 2014 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 6, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 4, 2014 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 31, 2014 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 31, 2014 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 23, 2014 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |