Drawing for MEGAWAT BLU

USPTO serial 79155247

MEGAWAT BLU

Reviewed by CopyMark Law Group

Reg. 4834053Status 404
Filing date
Status date
Registration date
Oct 20, 2015
Examiner
WILKE, JOHN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MEGAWAT BLU?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brewster Taylor

Brewster Taylor STITES & HARBISON PLLC1199 North Fairfax St.Suite 900Alexandria, VA 22314

Goods and services

ClassDescriptionStatusFirst use
007Machine couplings and transmission components not for land vehicles; electric generators; current generators; electrical energy generators; hydraulic power generators; aerogenerators for producing wind power; hydraulic power plants; wind turbines; motors and engines not for land vehicles; electric motors; hydraulic engines; hydraulic motors; pumps, namely, electric pumps; centrifugal pumps; water pumps being machines; turbines, electric power turbines, hydraulic turbines, and wind turbines, all not for land vehicles; hydraulic controls for electrical generators, machines, motors and engines, pumps, turbines, hydraulic power units and wind power turbines; pneumatic controls for generators, machines, motors and engines, pumps, turbines, hydraulic power units and wind power turbines; hydromechanical equipment for hydroelectric operations, compressors, regulators, superheaters, and superchargers; pneumatic, mechanical and electronic control systems and mechanisms for electrical generators, machines, motors, engines, pumps, turbines, hydraulic power installations and wind power installations; hydraulic and wind power electricity generating power plants; condenser power plants; thermal power plants; electricity generating power plants; electric power plants using pumped storage and compressed air for the production and distribution of energy; electric power plants using fuel oil and coal; gas turbine power plants; structural parts for all the aforesaid goodsSECTION 71 - CANCELLED—
011Nuclear power plants; nuclear reactors; structural parts for all the aforesaid goodsSECTION 71 - CANCELLED—
037Construction, repair, and installation of machine couplings and transmission components not for land vehicles, electric generators, current generators, electrical energy generators, hydraulic power generators, aerogenerators for producing wind power, wind turbines, motors and engines not for land vehicles, electric motors, hydraulic engines, hydraulic motors, pumps, namely, electric pumps, centrifugal pumps, water pumps being machines, turbines, electric power turbines, hydraulic turbines, and wind turbines, all not for land vehicles, hydraulic controls for electrical generators, machines, motors and engines, pumps, turbines, hydraulic power units and wind power turbines, pneumatic controls for generators, machines, motors and engines, pumps, turbines, hydraulic power units and wind power turbines, hydromechanical equipment for hydroelectric operations, compressors, regulators, superheaters, and superchargers, hydraulic and wind power electricity generating power plants, condenser power plants, thermal power plants,electric power plants using pumped storage and compressed air for the production and distribution of energy, electric power plants using fuel oil and coal, gas turbine power plants, and structural parts for all the aforesaid goods; providing information on construction, repair and installation of machine couplings and transmission components not for land vehicles, electric generators, current generators, electrical energy generators, hydraulic power generators, aerogenerators for producing wind power, wind turbines, motors and engines not for land vehicles, electric motors, hydraulic engines, hydraulic motors, pumps, namely, electric pumps, centrifugal pumps, water pumps being machines, turbines, electric power turbines, hydraulic turbines, and wind turbines, all not for land vehicles, hydraulic controls for electrical generators, machines, motors and engines, pumps, turbines, hydraulic power units and wind power turbines, pneumatic controls for generators, machines, motors and engines, pumps, turbines, hydraulic power units and wind power turbines, hydromechanical equipment for hydroelectric operations, compressors, regulators, superheaters, and superchargers, hydraulic and wind power electricity generating power plants, condenser power plants, thermal power plants,electric power plants using pumped storage and compressed air for the production and distribution of energy, electric power plants using fuel oil and coal, gas turbine power plants, and structural parts for all the aforesaid goodsSECTION 71 - CANCELLED—
039Distribution, transport, storage, and transfer of electricity, air, gas, oil and fuels for the production of energy; transport by oil pipelines; transport by pipelineSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 11, 2024DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 11, 2024DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 28, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 20, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 23, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 23, 2023INPCINVALIDATION PROCESSED—
Jan 6, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 6, 2022C71TCANCELLED SECTION 71—
Oct 20, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 11, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 12, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 12, 2016FIMPFINAL DISPOSITION PROCESSED—
Jan 20, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 20, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 4, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 4, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 15, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 2, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 1, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 22, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 22, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 12, 2015ALIEASSIGNED TO LIE—
Jun 11, 2015ALIEASSIGNED TO LIE—
May 29, 2015ALIEASSIGNED TO LIE—
May 26, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 12, 2014RFNTREFUSAL PROCESSED BY IB—
Nov 25, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 25, 2014RFRRREFUSAL PROCESSED BY MPU—
Nov 25, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 22, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 21, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 21, 2014DOCKASSIGNED TO EXAMINER—
Nov 21, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 20, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance