Drawing for SENVION WIND ENERGY SOLUTIONS

USPTO serial 79156854

SENVION WIND ENERGY SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 4990795Status 404
Filing date
Status date
Registration date
Jul 5, 2016
Examiner
BUONGIORNO, CHRISTOPHER L
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SENVION WIND ENERGY SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

TIMOTHY J. LYDEN

TIMOTHY J. LYDEN HOGAN LOVELLS US LLP7930 JONES BRANCH DRIVE, 9TH FLOORBOX INTELLECTUAL PROPERTYMCLEAN, VA 22182

Goods and services

ClassDescriptionStatusFirst use
007Wind-powered machines, namely, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy; turbines, namely, wind turbines; structural parts and machine parts for wind-powered machines, namely, rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power units in the nature of auxiliary power units for supplying electrical powerSECTION 71 - CANCELLED—
009Switch cabinets, namely, cabinets specifically designed to house electric switches, electrical and electronic instruments and apparatus for recording, processing, storage and transmission of data from wind power plants and wind farms, namely, computer hardware and computer software to measure wind speed, the sun's position, solar radiation flux density, air temperature, air pressure, relative humidity, photovoltaic module temperature, and other data relevant to wind power plants and wind farms, switch cabinets in the nature of electrical and electronic control apparatus and instruments for wind power plants and wind farms, electrical and electronic voltage and current regulators for wind power plants and wind farms, electrical and electronic regulating, checking, supervision, control and monitoring apparatus and instruments for wind power plants and wind farms, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants, data processing apparatus, computer hardware, computer software for operating, monitoring and regulating wind power plants and wind farms; computer software for calculating the dimensions of wind farms and the surrounding land, as well as calculating their efficiency, and computer software for calculating the dimensions of rotors used on the wind mills in wind farms, computer interface boards and graphical user interface software, voltage surge protectors; electronic vibration sensors, measuring apparatus, namely, meters for measuring electricity in watt-hours, inverter units, namely, electric converters and electric transformers, all of the foregoing for wind power plants and wind farmsSECTION 71 - CANCELLED—
035Professional business consultancy with regard to wind power plants and wind farmsSECTION 71 - CANCELLED—
037Building construction in the field of wind power plants; installation services, namely, installation of towers, turbines, electrical and computer hardware systems for wind power plants and farms; maintenance and rebuilding of wind powered machines that have been worn or partially destroyed; maintenance and repair of wind power plants; installing rotor blades in wind turbines for othersSECTION 71 - CANCELLED—
040Production of energy using wind power; generation of electricity using wind powerSECTION 71 - CANCELLED—
042Remote maintenance, remote control and remote monitoring of wind power plants and wind farms through computerized retrieval of data via the Internet; conducting technical measurements, inspections for taking technical measurements, and calculations in the field of wind power plants and wind farms using remote measuring devices in the nature of computer software, as well as aerial digital imaging, to measure the exterior features of wind power plants and wind farms; electronic data storage; surveying, namely, reviewing the engineering data collected in the field of wind power plants and wind farms and analyzing the results of said surveys; design and development of computer software in the field of wind power plants and wind farms; technical consultancy in engineering, engineering services, namely, technical planning and technical development services as well as technical project management of wind power plants projects; new product engineering for others, namely, designing rotor blades for others; technical research in the field of wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; technical quality monitoring services of rotor bladesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 10, 2025DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jan 10, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 15, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 27, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 27, 2023INPCINVALIDATION PROCESSED—
Sep 20, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 20, 2023C71TCANCELLED SECTION 71—
May 21, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 5, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 23, 2017GPNXNOTIFICATION PROCESSED BY IB—
Nov 4, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 18, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 18, 2016FIMPFINAL DISPOSITION PROCESSED—
Oct 5, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 5, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 1, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 11, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 11, 2016OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 19, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 19, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 30, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 30, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 30, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 17, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 16, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 16, 2016XAECEXAMINER'S AMENDMENT ENTERED—
Mar 16, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 16, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 16, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 14, 2016RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Sep 14, 2015RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Sep 4, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 9, 2015GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 9, 2015GNSLLETTER OF SUSPENSION E-MAILED—
Mar 9, 2015CNSLSUSPENSION LETTER WRITTEN—
Feb 23, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 23, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 16, 2015ALIEASSIGNED TO LIE—
Feb 9, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 9, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 9, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 15, 2015RFNTREFUSAL PROCESSED BY IB—
Dec 24, 2014RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 24, 2014RFRRREFUSAL PROCESSED BY MPU—
Dec 24, 2014RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 23, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 20, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 16, 2014DOCKASSIGNED TO EXAMINER—
Dec 16, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 12, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance