Drawing for UPSAVER

USPTO serial 79157228

UPSAVER

Reviewed by CopyMark Law Group

Reg. 4824422Status 404
Filing date
Status date
Registration date
Oct 6, 2015
Examiner
MARTIN, EUGENIA K
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with UPSAVER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Keith A. Weltsch

Keith A. Weltsch Scully, Scott, Murphy & Presser, P.C.400 Garden City Plaza, Suite 300Suite 300Garden City, NY 11530

Goods and services

ClassDescriptionStatusFirst use
009UPS, namely, uninterruptible power supplies; AC/DC power supplies; rectifiers; industrial rectifier-battery chargers; power factor controllers, namely, power factor regulator to economize the delivery of electrical power in the nature of a rod containing minerals contained in a PVC tubes; power conversion devices, namely, electric converters; frequency converters; commutators; EPS, namely, emergency power supplies; inverters; static inverters; electronic components for computer; computer software, namely, data processing programs; electric batteries; battery chargers; microprocessors; microprocessors, namely, microprocessors for computers; transformers; battery switch boxes; recorded computer software, namely, software for remote monitoring of uninterruptible power supplies (UPS) and supervision, namely, control of uninterruptible power supplies (UPS) and software for use in energy management, namely, software for management of uninterruptible power supply machines; battery performance monitors in the nature of battery thermal probes and battery testers; electronic transistors; electrical distribution boxes; electrical static switches; electrical static transfer switches; thyristor modules, namely, thyristors; electric control panels; alarm installations and alarms; acoustic sound alarms; electrical power distribution units; distribution circuit boards; voltage stabilizers; electric cables; uninterruptible electrical power supplies; DC input power supplies; voltage regulators; static voltage regulators; voltage surge protectors; voltage surge suppressors; voltage monitoring units; high-voltage transformers; high-voltage power supplies; voltage testers; overvoltage protection controllers; photovoltaic cells; solar panels for production of electricity; wafers for solar cells; solar panels for electricity generation; solar cells; solar wafers; photovoltaic power plants, namely, photovoltaic installations for generating electricity; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic thermal module; chargers for electric batteries; anemometers; electric meters; temperature sensors; remote controls for uninterruptible electrical power supplies; electro-dynamic apparatus for the remote control of signals; computer programs for searching the contents of computers and computer networks by remote control; electronic devices, namely, energy meters for tracking and monitoring energy usage; power access port for use with electrical control panels for connecting multiple data and electrical devices; automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation and electrical distribution; electronic power controllers; electrical power distribution blocks; medium voltage power distribution and protection component system composed of breakers and switchgears; electricity distribution consoles; reed switches for use with security control panels; alarm monitoring systems; computer operating software; computer software for controlling and managing access server applicationsSECTION 71 - CANCELLED—
037Installation, maintenance and repair of uninterruptible power supplies and emergency power supplies; installation and repair of apparatus for the generation, transmission, distribution, supply and conservation of energy; rental of uninterruptible power supplies and emergency power supplies; providing information relating to the repair or maintenance of power distribution or control machines and apparatus; repair or maintenance of power distribution or control machines and apparatus; installation, maintenance and repair of apparatus for distributing electricity; repair of energy supply installations; emergency servicing of apparatus for supplying electricity; installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; installation, maintenance and repair of electronic data processing apparatus; installation, maintenance and repair of hardware for data communication networks; installation, maintenance and repair of computer hardware for electronic data processing systems; installation and maintenance of computer hardware for the transfer of data for remote reading of electricity meters; installation of power generating apparatus; installation of reactive power compensation apparatus; maintenance and repair of power shift transmissions; servicing of power generating apparatus and installations; providing information relating to the repair or maintenance of power generators; installation, maintenance and repair of energy conversion apparatus; installation, construction, maintenance, servicing and repair of energy and power generating apparatus, equipment and installations; installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules. installation, maintenance and repair of solar installations for generating powerSECTION 71 - CANCELLED—
042Technical consultancy in relation to the technical application and use of computer software in the field of generation, transmission, distribution, supply and conservation of energy; technical consultancy in relation to the technical application and use of computer software in the field of installations of uninterruptible power supplies and emergency power supplies; technical consultancy in relation to the technical application and use of computer software in the field of energy management; design and development of uninterruptible power supplies and emergency power supplies; installation, maintenance and updating of computer software; computer software design; computer software consultancy; research and consultancy services in the field of information and telecommunications technology; development of energy and power management systems; technological analysis relating to energy and power needs of others; consultancy relating to technological services in the field of power and energy supply; consulting services in the fields of energy measurement to improve energy efficiency; engineering services in the field of energy efficiency; programming of energy management software; design and development of energy distribution networks; engineering services relating to energy supply systems; design and development of regenerative energy generation systems; technological consultancy in the field of alternative energy generation; design and development of software for control, regulation and monitoring of solar energy systems; provision of information concerning research and technical project studies relating to the use of natural energy; engineering services in the field of energy technology; engineering services relating to information technology; research in the field of data processing technology; consultancy and information services relating to information technology, information technology architecture and infrastructure and computer system integration; development of computer software for use with programmable controllers; development of computer software for use with computer-controlled switching systems; monitoring of computer systems by remote access to ensure proper functioning; testing services for computer hardware and software used with alarm and monitoring systemsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 14, 2024DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Sep 14, 2024DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 14, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 16, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 15, 2023INPCINVALIDATION PROCESSED—
Dec 22, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 22, 2022C71TCANCELLED SECTION 71—
Oct 14, 2021LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 31, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 31, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 31, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 31, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 31, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 27, 2020LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Oct 6, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 11, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 24, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 24, 2016FIMPFINAL DISPOSITION PROCESSED—
Jan 6, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 6, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 21, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 21, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 17, 2015GPNXNOTIFICATION PROCESSED BY IB—
Jul 1, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 1, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 1, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 17, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 15, 2015ALIEASSIGNED TO LIE—
May 28, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 27, 2015XAECEXAMINER'S AMENDMENT ENTERED—
May 27, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 27, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
May 27, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
May 13, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 13, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 23, 2015RFNTREFUSAL PROCESSED BY IB—
Jan 7, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 7, 2015RFRRREFUSAL PROCESSED BY MPU—
Jan 1, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 31, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 27, 2014MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 23, 2014DOCKASSIGNED TO EXAMINER—
Dec 23, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 19, 2014LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Dec 18, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance