Drawing for NEXT LEVEL FOR IT INFRASTRUCTURE

USPTO serial 79157708

NEXT LEVEL FOR IT INFRASTRUCTURE

Reviewed by CopyMark Law Group

Reg. 4861505Status 404
Filing date
Status date
Registration date
Dec 1, 2015
Examiner
NGUYEN, NICOLE ASHLEY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with NEXT LEVEL FOR IT INFRASTRUCTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew J. Smith

RITTAL GMBH & CO KGAUF DEM STÜTZELBERGHERBORN, 35745GERMANY

Goods and services

ClassDescriptionStatusFirst use
009Metal cabinets specially adapted to protect computer and telecommunications equipment for use in industry, installation, electronics, telecommunications, data reprocessing, interactive terminal systems and data transmission; mounts and mounting brackets adapted for electric cables all the aforesaid goods being earthquake-proof, vandal-proof, and explosion-proof; mounting racks for computer and telecommunications hardware; sound alarms, namely, signalling devices that emit sounds and light for monitoring and safeguarding switch cupboards; electric current distribution components, included in this class in particular electronic apparatus adaptors for connectors and devices, and load-breakers; modules and system components for energy subdistribution, namely, transformers, power supplies, namely, power supply units, electric accumulators; power supplying apparatus, namely, uninterruptible power supplies, including in modular form; electric power converters; power inverters; electric accumulators for computer and telecommunications hardware; overload protection devices for sensitive electronic apparatus and computers, namely, fuses and monitoring units; alarm installations, in particular fire alarms, fire extinguishing apparatus and fire extinguishing systems constructed therefrom; water warning alarm apparatus and installations constructed thereof; electrical power distribution units; electric and electronic access control apparatus-us and installations constructed therefrom, namely, access control and alarm monitoring systems consisting of video cameras, code cards and card readers, magnetic cards and card readers, transponders, chipcards and card readers, biometric identification apparatus, humidity detectors, smoke detectors, fire detectors; electric and electronic control apparatus, installations, and instruments for the operation of control stations, control rooms, console workstations, and CAD workstations; electric apparatus for control, regulation, and monitoring of building systems and alarm monitoring for the security of electrical switchgear cupboards; configuration and monitoring software for security rooms in the field of information technology; electrical conduit, ducting, and plug device enabling connection and disconnection of cables; metal grounding bushings for use only as parts and fittings for electrical cable, and not for non-electric cable or machinery or machine parts; metal grounding clamps for use only as parts and fittings for electrical cable, and not for non-electric cable or machinery or machine parts and electronic indicator panels adapted for housings for electric fittings; plug-in connector units for computer and telecommunications storage racks, namely, plug-in network cards, host bus circuit boards, blank storage cassettes, test pins for testing printed circuit boards and socket connectors; main supply circuit, namely, power supply units; data processing accessories, namely, disc wallets and storage containers; microfilm storage containers, namely, wallets and cases for microfilm; storage wallets and containers for magnetic data carriers, including magnetic tapes, magnetic disks, floppy discs, and compact discs (CDs); electronic devices for monitoring gas pipelines; casing parts for electrical equipment, namely, housing for switching apparatus; calculating machines, data-processing equipment and computers; fire-extinguishing apparatus; storage containers, namely, cases for magnetic data carriers; data processing computer hardware; computer hardware, computer software for monitoring and supervision of switchboard cabinets; computer software for ITmanagement; computer software for configuration and planning of IT-rooms, network systems, security rooms, climatization, and low voltage systemsSECTION 70 - CANCELLED—
037Construction of buildings, in particular, security areas for information technology; building construction; repair of electrical power distribution systems, computer networking hardware and telecommunications network hardware; installation services of electrical power distribution systems, computer networking hardware and telecommunications network hardware; construction supervision in connection with the construction and development of data or communications sitesSECTION 70 - CANCELLED—
042Technical project studies for buildings, namely, conducting feasibility studies in the field of secure areas for information technology; scientific and technological services, namely, research and design in the field of computer networking hardware and computer data center architecture; industrial analysis and research services in the field of computer networking hardware; design and development of computer hardware and software; consulting services for others in the field of analysis, planning, and implementation project management of scientific research and computer software testing; scientific and technological services, namely, technical analysis and design in the field of energy supply, security systems, fire alarm and extinguishing technology, air conditioning installations, and data processing and data back-ups; technical support services, namely, providing back-up computer programs and facilities for integrated information technology centres; consultancy in the fields of computer hardware, updating, creation and rental of computer programs, technical and mechanical engineering research, construction drafting software, material testing, physics researchSECTION 18 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 13, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Dec 13, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 10, 2018TMBNTTAB RELEASE CASE TO TRADEMARKS—
Oct 10, 2018CANTCANCELLATION TERMINATED NO. 999999—
Oct 6, 2018C18PCANCELLED SECTION 18-PARTIAL—
Sep 20, 2018CANGCANCELLATION GRANTED NO. 999999—
Jun 20, 2018PETCCANCELLATION INSTITUTED NO. 999999—
Mar 18, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 2, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 2, 2016FIMPFINAL DISPOSITION PROCESSED—
Mar 1, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 1, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 15, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 15, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 11, 2015GPNXNOTIFICATION PROCESSED BY IB—
Aug 26, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 26, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 26, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 11, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 3, 2015ALIEASSIGNED TO LIE—
Jul 22, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 24, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 23, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 23, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 23, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 23, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 9, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 9, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 23, 2015RFNTREFUSAL PROCESSED BY IB—
Jan 8, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 8, 2015RFRRREFUSAL PROCESSED BY MPU—
Jan 7, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 6, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 30, 2014DOCKASSIGNED TO EXAMINER—
Dec 30, 2014NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 26, 2014REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance