Drawing for VESTAS POWERPLUS

USPTO serial 79157884

VESTAS POWERPLUS

Reviewed by CopyMark Law Group

Reg. 4861518Status 707Registered
Filing date
Status date
Registration date
Dec 1, 2015
Examiner
FLETCHER, TRACY L
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with VESTAS POWERPLUS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

LEIGH ANN LINDQUIST

LEIGH ANN LINDQUIST SUGHRUE MION, PLLC2000 PENNSYLVANIA AVENUE NW, SUITE 9000WASHINGTON, DC 20006United States

Goods and services

ClassDescriptionStatusFirst use
007[ Wind mills, wind power plants, wind turbines, wind-operated machines, namely, off-shore wind mills, offshore turbines and offshore wind-operated machines in the nature of wind-powered electricity generators; parts and accessories specially adapted to upgrade wind turbines, wind mills and wind-operated electricity generators, namely, mill towers and masts, blades, blade hubs, mill housings, bottom-mounted and floating mill foundations, rotation yaw rings and gears; devices specially adapted for wind turbines and wind mills for use setting the pitch of the blades; devices specially adapted for wind turbines and wind mills, namely, brakes and brake linings, main shafts, universal joints, transmissions for machines, clutches, electric generators and cooling fans; reserve power supply plants ]SECTION 71 - CANCELLED—
009[ Electrical, electronic and computer equipment for wind mills, wind power plants, wind turbines and other wind-operated machines, namely, electrical controls for automatically turning on and off power generators and for automatically starting power generators after public power line break-downs; apparatus for overvoltage protection from lightning strikes, namely, voltage regulators and lightning rods; microprocessors for controlling and monitoring voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brake pads, temperature, wind direction and wind speed; vibration and oscillation sensors for installation in mill housings; watt-hour electric meters; computer software for the operation, control and maintenance of wind turbines; software for use enhancing the performance of wind turbines ]SECTION 71 - CANCELLED—
035[ Commercial business advisory services relating to exploitation of wind energy; business consultation in connection with optimizing energy productions and yield from wind turbines ]SECTION 71 - CANCELLED—
042Scientific and technological services, namely, research and design in the field of wind energy, wind turbines and wind power plants; product research and development in the field of wind turbines; technological consultation in connection with implementing products and processes for optimization of energy production from wind turbines; technological consultation in connection with improving, monitoring, operating and control of wind mills, wind turbines and wind power plants and other renewable energy power plants, including remote monitoring, operation and control of wind mills, wind turbines and wind power plantsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 8, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 8, 202671.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Oct 5, 2026EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Apr 10, 2026PR71POST REGISTRATION ACTION MAILED - SEC.71—
Mar 23, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 1, 2025ES71TEAS SECTION 71 RECEIVED—
Dec 1, 2024REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 10, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 15, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Sep 2, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 2, 2023INPCINVALIDATION PROCESSED—
Aug 3, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 3, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Dec 3, 202271.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Nov 8, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 31, 2022ES71TEAS SECTION 71 RECEIVED—
Dec 1, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 20, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 11, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 9, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 8, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 18, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 18, 2016FIMPFINAL DISPOSITION PROCESSED—
Mar 1, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 1, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 16, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 15, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 15, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 11, 2015GPNXNOTIFICATION PROCESSED BY IB—
Aug 26, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 26, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 26, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 10, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 3, 2015ALIEASSIGNED TO LIE—
Jul 22, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 21, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 21, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 21, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 14, 2015RFNTREFUSAL PROCESSED BY IB—
Jan 23, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 23, 2015RFRRREFUSAL PROCESSED BY MPU—
Jan 22, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 21, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 15, 2015DOCKASSIGNED TO EXAMINER—
Jan 10, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 6, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance