USPTO serial 79157900
NEXT LEVEL FOR IT INFRASTRUCTURE
Reviewed by CopyMark Law Group
Reg. 4953375Status 404
- Filing date
- Status date
- Registration date
- May 10, 2016
- Examiner
- ROACH, APRIL K
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with NEXT LEVEL FOR IT INFRASTRUCTURE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew J. Smith
RITTAL GMBH & CO KGAUF DEM STÜTZELBERGHERBORN, 35745GERMANYGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Metal switching cabinets specially adapted to protect computer and telecommunications equipment for use in industry, installation, electronics, telecommunications, data reprocessing, interactive terminal systems and data transmission; electricity conducting bracket systems comprised of mounts and mounting brackets adapted for electric cables all the aforesaid goods being earthquake-proof, vandal-proof, and explosion-proof; mounting racks, namely, subracks for plug in units with electrical circuits, for computer and telecommunications hardware; sound alarms, namely, signalling devices that emit sounds and light for monitoring and safeguarding switch cupboards; electric current distribution components, included in this class in particular electronic apparatus adaptors for connectors and devices, and load-breakers; modules and system components for energy subdistribution, namely, transformers, power supplies, namely, power supply units, electric accumulators; power supplying apparatus, namely, uninterruptible power supplies, including in modular form; electric power converters; power inverters; electric accumulators for computer and telecommunications hardware; overload protection devices for sensitive electronic apparatus and computers, namely, fuses and monitoring units; alarm installations, in particular fire alarms, fire extinguishing apparatus and fire extinguishing systems constructed therefrom; water warning alarm apparatus and installations constructed thereof; electrical power distribution units; electric and electronic access control systems consisting of video cameras, magnetically encoded cards and card readers, magnetic cards and card readers, transponders, magnetically encoded chipcards and card readers, and biometric identification apparatus; electric and electronic control apparatus, installations, and instruments for the operation of control stations, control rooms, console workstations, and CAD workstations, namely, electronic controls for remote control of industrial operations;electric apparatus for control, regulation, and monitoring of building systems and alarm monitoring for the security of electrical switchgear cupboards; configuration and monitoring software for security rooms in the field of information technology; rubber clamping sections, namely, grounding clamps for use only as parts and fittings for electrical cable, and not for non-electric cable or machinery or machine parts and electronic indicator panels adapted for housings for electric fittings; plug-in connector units for computer and telecommunications subracks, namely, plug-in network cards, host bus circuit boards, blank storage cassettes, test pins for testing printed circuit boards and socket connectors; main supply circuit, namely, power supply units; data processing accessories, namely, filing containers for floppy discs in the nature of disc wallets and storage containers; microfilm filing storage containers, namely, wallets and cases for microfilm; storage containers in the nature of folders and pockets specially adapted for magnetic data carrier tapes, magnetic disks, floppy discs, and compact discs; electronic devices for monitoring gas pipelines; calculating machines, data-processing equipment and computers; fire-extinguishing apparatus; storage containers, namely, cases for magnetic data carriers; data processing computer hardware; computer hardware, computer software for monitoring and supervision of switchboard cabinets; computer software for ITmanagement; computer software for configuration and planning of IT-rooms, network systems, security rooms, climatization, and low voltage systems | SECTION 70 - CANCELLED | — |
| 037 | Construction of buildings, in particular, security areas for information technology; building construction; repair of electrical power distribution systems, computer networking hardware and telecommunications network hardware; installation services of electrical power distribution systems, computer networking hardware and telecommunications network hardware; construction supervision in connection with the construction and development of data or communications sites | SECTION 70 - CANCELLED | — |
| 042 | Technical project studies for buildings, namely, conducting engineering feasibility studies in the field of secure areas for information technology; scientific and technological services, namely, research and design in the field of computer networking hardware and computer data center architecture; industrial analysis and research services in the field of computer networking hardware; design and development of computer hardware and software; consulting services for others in the field of analysis, planning, and implementation project management of scientific research and computer software testing; scientific and technological services, namely, computer system analysis and design of new technology in the fields of energy supply, security systems, fire alarm and extinguishing technology, air conditioning installations, and data processing and data back-ups; technical support services, namely, providing back-up computer programs and facilities for integrated information technology centres; consultancy in the fields of computer hardware, updating, creation and rental of computer programs, technical and mechanical engineering research, construction drafting software, material testing, physics research | SECTION 18 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by RITTAL GmbH & Co. KG
- Other trademarks owned by RITTAL GmbH & Co. KG
- Other trademarks owned by RITTAL GmbH & Co. KG
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named NEXT LEVEL FOR IT INFRASTRUCTURE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 13, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Dec 13, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 16, 2018 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Oct 16, 2018 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Oct 12, 2018 | C18P | CANCELLED SECTION 18-PARTIAL | — |
| Sep 21, 2018 | CANG | CANCELLATION GRANTED NO. 999999 | — |
| Jun 12, 2018 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Sep 2, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 11, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 11, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 10, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 10, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 23, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 23, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 20, 2016 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 3, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 3, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 3, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 20, 2016 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Jan 20, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 20, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 20, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 20, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 20, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 14, 2016 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 14, 2016 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Jan 14, 2016 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Jan 14, 2016 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Jan 4, 2016 | RDX3 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED | — |
| Jan 4, 2016 | RDX1 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED | — |
| Jan 4, 2016 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Dec 2, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 1, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 1, 2015 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 16, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 16, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 16, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 24, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 23, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 23, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 23, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 23, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 9, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 9, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 31, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 14, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 14, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 13, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 12, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 10, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 6, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 6, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 2, 2015 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |