Drawing for INTRINSIC

USPTO serial 79157947

INTRINSIC

Reviewed by CopyMark Law Group

Reg. 4975247Status 707Renewal
Filing date
Status date
Registration date
Jun 14, 2016
Examiner
MORRIS, KRISTINA KLOIBER
Law office
—

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with INTRINSIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*

Plus Government fees of $850

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Marlene J. Williams

Marlene J. Williams Winston & Strawn LLP101 California StreetSan Francisco, CA 94111United States

Goods and services

ClassDescriptionStatusFirst use
007[ Ceramic structural elements being parts of machines, namely, heat sinks for use in machines, pistons being internal combustion engine parts, cyclones, pump housings, shafts for pumps, shaft couplings not for land vehicles, mining bits, mechanical seals, bearings, flue gas desulphurization nozzles, grinding mills for chemical processing, industrial chemical reactors and parts therefor, mining components and oil and gas drilling components, namely, drilling bars, drilling bits, drilling heads, drilling rods, drilling shafts, drilling tool joints, drilling strings; ceramic-coated parts of machines, namely, heat sinks for use in machines, pistons being internal combustion engine parts, cyclones, pump housings, shafts for pumps, shaft couplings not for land vehicles, mining bits, drills for the mining industry, mechanical seals, bearings, flue gas desulphurization nozzles, grinding mills for chemical processing, industrial chemical reactors and parts therefor; connections being parts of machines predominantly of metal, in particular for connecting metal and ceramic parts, namely, joints and joint parts for connecting sliding strips, plates and guides, couplers ]SECTION 71 - CANCELLED—
009Supports and frames of ceramic goods for electro-technical and electronic equipment, namely, heat sinks for use in as supports or frames in computers and electronic components [, housings for printed circuit boards, housing for semiconductor chips, casings and casing parts for electrical equipment, namely, housing for switching apparatus, semiconductor chip housings in the nature of vertical and horizontal boats, supports and frames for electrical or chemical reactor tubes, ceramic pedestals sold empty that are specially adapted to contain photographic and computer components, camera housings, supports and frames for chuck cold plates, supports and frames for vacuum wafer chucks, supports and frames for stage location mirrors, optical benches, supports and frames for optical metering structures, supports and frames for optical mirrors, housings for optics, namely, housings for lasers and optical lenses; measuring apparatus and instruments, including metrology equipment, namely, air-gearing guide bars and traverses for measuring direction and elevation, electric meters, weighing machines, spectrometers, distance measuring apparatus, instruments for measuring length, slide calipers, measuring apparatus, namely, bevels, angle finders, buckets, cups, glassware, rulers, spoons ]ACTIVE—
019[ Articles of ceramics for building purposes, namely, ceramic tiles, ceramic pipes and fittings therefor, non-metal pipe fittings, non-metal water pipes, non-metal gutter pipes, non-metal sewer pipes, and non-metallic drainage pipes, non-metal tubing and tubing couplings for joining and terminating pipes, nonmetal tubular liners for the lining of coal power plant systems, mining systems, and oil and gas drilling systems, filling material for refilling of shafts, pipe systems for pipe or shaft sealing; portable non-metal buildings; ceramic composite components, namely, non-metal tiles, pipes and fittings therefor, tubular liners for the lining of coal power plant systems, mining systems, and oil and gas drilling systems; semi-prefabricated components of ceramic and building materials, namely, non-metal architectural mouldings of oxide ceramic materials, in particular aluminum oxide, zirconium oxide, beryllium oxide, magnesium oxide, magnesium/aluminum oxide and silicon oxide, aluminum titanate, aluminum silicate, mullite, sillimanite, silicon carbide, in particular being based on silicon carbide, including being reaction-bonded and silicon-infiltrated; all of the aforesaid goods, including being wholly or partially impregnated, reinforced and/or with protective surface coatings, in particular containing silicon carbide and/or boron carbide ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 7, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 10, 2026ES71TEAS SECTION 71 RECEIVED—
Jun 14, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Aug 21, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 21, 2024ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 21, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 21, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 21, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 21, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 9, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Apr 15, 2024INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Mar 13, 2024INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 13, 2024INPCINVALIDATION PROCESSED—
Mar 7, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 7, 2023NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jul 7, 202371.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Jul 4, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 14, 2022ES71TEAS SECTION 71 RECEIVED—
Jul 12, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 12, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 12, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 28, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 28, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 28, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jul 28, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 28, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 28, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jun 14, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 12, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 15, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 15, 2016FIMPFINAL DISPOSITION PROCESSED—
Sep 14, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 17, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 14, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 1, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 1, 2016OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 6, 2016ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Jan 15, 2016ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Dec 22, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 22, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 18, 2015GPNXNOTIFICATION PROCESSED BY IB—
Dec 2, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 2, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 2, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 13, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 22, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 21, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 21, 2015ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 10, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 10, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 10, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 16, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 15, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 15, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 31, 2015RFNPREFUSAL PROCESSED BY IB—
Jan 15, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 15, 2015RFRRREFUSAL PROCESSED BY MPU—
Jan 14, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 13, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 6, 2015DOCKASSIGNED TO EXAMINER—
Jan 6, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance