Drawing for GREENBRAIN

USPTO serial 79158022

GREENBRAIN

Reviewed by CopyMark Law Group

Reg. 4879029Status 404
Filing date
Status date
Registration date
Jan 5, 2016
Examiner
MITTLER, ROBIN M
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with GREENBRAIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrea Anderson

Andrea Anderson Holland & Hart LLPP.O. Box 8749Attn: Trademark DocketingDenver, CO 80201

Goods and services

ClassDescriptionStatusFirst use
009Photovoltaic apparatus and installations for producing solar electricity, namely, photovoltaic cells and modules, photovoltaic inverters, photovoltaic systems that convert sunlight into electric and thermal energy; solar and photovoltaic panels for electricity production; electric monitoring apparatus, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals; electric measuring apparatus, namely, voltmeters, amperage testers, electronical sensors for measuring solar radiation; circuit breakers; electric control panels; breakers, namely, circuit breakers; electric apparatus for commutation, namely, commutators; electricity distribution consoles and electrical power distribution units, namely, electric distribution cabinets and boards; switchboards; electric distribution, junction and connection boxes; electric converters; electric switches; electrical transformers; fuses; apparatus for analyzing signals, current and voltage, namely, electronic audio analyzers for the measurement and analysis of audio signals, electrical eddy current test equipment, electronic monitors and monitor modules for monitoring electric current and electrical signals, voltage monitor modules; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric switches, electric transformers, electric accumulators, voltage regulators, and electrical controlling devices; data processing apparatus; computers; computer peripherals; electric batteries; electric wires; memory cards; blank integrated circuit cardsSECTION 71 - CANCELLED—
037Installation, maintenance and repair of photovoltaic or solar electricity production apparatusSECTION 71 - CANCELLED—
042Consulting services in the field of testing of electronic components and electronic systems, namely, technical information and advice on installations for providing and/or producing and/or distributing electricity; consumer product safety testing consultation, namely, advice on electrical product safety; quality control for others for electric and photovoltaic installations; scientific and industrial research services in the field of photovoltaics and solar collectors; research and development services in the field of photovoltaic cells and electricity production; technical consulting and expertise in the field of design of solar photovoltaic systems; design and development of photovoltaic systems; evaluations, estimates and research in scientific and technological fields provided by engineers, namely, scientific research, materials testing and evaluation, quality evaluation for others in the field of maintenance, repair and installation of solar installations and photovoltaic installations; research and development of new products for others; technical project studies, namely, conducting of feasibility studies in the field of new technologies, these services not in connection with the fields of cellular biology, molecular biology, biotechnology and biochemistry; conversion of data or documents from physical to electronic mediaSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 18, 2025DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Apr 18, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
May 22, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Apr 29, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 29, 2023INPCINVALIDATION PROCESSED—
Mar 22, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 13, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 22, 2022C71TCANCELLED SECTION 71—
Jan 5, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 7, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 8, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 7, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 7, 2016FIMPFINAL DISPOSITION PROCESSED—
Apr 5, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 5, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 20, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 20, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 17, 2015GPNXNOTIFICATION PROCESSED BY IB—
Sep 30, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 30, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 30, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 11, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 9, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 14, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 7, 2015ALIEASSIGNED TO LIE—
Jul 24, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 4, 2015CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 22, 2015CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Feb 20, 2015RFNTREFUSAL PROCESSED BY IB—
Jan 28, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 28, 2015RFRRREFUSAL PROCESSED BY MPU—
Jan 28, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 27, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 12, 2015DOCKASSIGNED TO EXAMINER—
Jan 10, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 6, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 2, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance