Drawing for GALECO

USPTO serial 79158750

GALECO

Reviewed by CopyMark Law Group

Reg. 4820303Status 404
Filing date
Status date
Registration date
Sep 29, 2015
Examiner
LAWRENCE, SUSAN KASTRINER
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with GALECO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Metal gutter fittings for gutter systems, sheet metal, tin-plated sheet metal, metal hooks, elbows of metal for pipes, chimney cowls of metal, chimney shafts of metal, pipes of metal, roof gutters of metal, gutters of metal, clamping rings of metal for pipes and guttersSECTION 70 - CANCELLED—
019Concrete building elements, namely, concrete blocks and slabs; non-metallic building materials, namely, soffits; non-metallic tiles; non-metallic steel angles for use in building construction; non-metallic chimneys; non-metallic branching pipes; non-metal gutter fittings; multilayer panels of plastic for building construction purposes; non-metallic reinforcement for concrete and wood buildings, namely, rods; road-building materials, namely, concrete road pavement boards; bituminous coatings for roofing, non-metallic roofing; non-metallic drainpipes, non-metallic gutter pipes, non-metallic rigid pipes for building, stoneware pipes, cement pipes; non-metallic scaffolding, non-metallic gutters fittings for gutter systems, non-metallic valves for drainpipesSECTION 70 - CANCELLED—
035Retail and wholesale store services featuring building supplies in the nature of articles, materials and goods of metal and not of metal for building; advertising agencies, online advertising on a computer network, dissemination of advertising materials, professional business consultancy, business management and organisation consultancy, business efficiency expert servicesSECTION 70 - CANCELLED—
037* Construction consultancy *SECTION 70 - CANCELLED—
039Storage of goods, packaging of goods for transportation, transport of goods and cargo, unloading of cargo, car rental, rental of warehouses, freight forwardingSECTION 70 - CANCELLED—
041Practical training in the area of use of computers, building construction, building materials marketing; teaching in the field of building construction, building materials marketing; arranging and conducting of educational conferences and seminars; publication of texts in the nature of text books; providing demonstrations for educational purposes; translations, namely, translation servicesSECTION 70 - CANCELLED—
042[ Construction consultancy, ] Gutter and drainage system design, designer services, namely, engineering design services in the nature of design of gutter and drainage systemsSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 18, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jul 18, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 2, 2018INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Feb 21, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 21, 2017COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 20, 2017CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
May 5, 2017RINXUSPTO CORRECTION PROCESSED BY IB—
May 5, 2017CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Mar 24, 2017RINXUSPTO CORRECTION PROCESSED BY IB—
Jul 8, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 22, 2016XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 22, 2016XXCRGENERIC MADRID TRANSACTION CREATED—
Dec 29, 2015FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 29, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 17, 2015GPNXNOTIFICATION PROCESSED BY IB—
Jul 14, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 1, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 1, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 24, 2015NPUBNOTICE OF PUBLICATION—
Jun 10, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 6, 2015ALIEASSIGNED TO LIE—
May 15, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 30, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 30, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 30, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 13, 2015RFNTREFUSAL PROCESSED BY IB—
Feb 23, 2015CRSNCORRECTION SENT TO IB—
Feb 23, 2015CRCRCORRECTION CREATED FOR IB—
Feb 20, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 20, 2015RFRRREFUSAL PROCESSED BY MPU—
Feb 20, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 19, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2015DOCKASSIGNED TO EXAMINER—
Jan 20, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 16, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 15, 2015SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance