USPTO serial 79159108
CONEX
Reviewed by CopyMark Law Group
Reg. 4910798Status 706Registered
- Filing date
- Status date
- Registration date
- Mar 8, 2016
- Examiner
- TANNER, MICHAEL R
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with CONEX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mainak H. Mehta
Mainak H. Mehta Procopio, Cory, Hargreaves & Savitch LLP525 B Street, Suite 2200San Diego, CA 92101United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Fittings of metal for connecting pipes and tubes, namely, [ clips, brackets, ] tees, [ flanges, ] bends, elbows for pipes, bends, couplers, connectors, namely, metal pipe connection fittings for connecting sections of pipes and tubes, washers and caps for sealing the ends of pipes and tubes, [ plugs, nipples, ] pipe connectors, pipe fasteners, flanges, washers, stop ends, namely, metal fittings used as leak-proof seals at the ends of rigid pipes and tubes, and caps for pipes, all of the foregoing goods made of metal; [ pipes of metal; tubes of metal; valves, namely, metal valves not being machine parts, manually operated metal valves; ] nuts of metal [ metal seals for use in plumbing and heating applications; and structural parts and fittings for the aforesaid goods; all of the foregoing goods for use in the fields of heating and plumbing ] | ACTIVE | — |
| 011 | Pipe connection fittings specifically designed to be used as integrated parts of water supply, air conditioning, heating, ventilation and sanitation systems, namely, water and gas pipes and tubes, stop ends, pipe connectors, tees, [ flanges, ] bends, and elbows for water and gas pipes; [ valves, namely, regulating accessories for water supply, namely, metered valves, valves for central heating radiators, valves for boilers for heating installations, valves for heating installations, thermostatic valves as parts of heating installations, gas regulators, valves for water purification installations, valves for water softening apparatus and installations, valves as parts of radiators; ] and structural parts and fittings therefor; all of the foregoing goods for use in the fields of heating and plumbing | ACTIVE | — |
| 019 | [ Pipes not of metal, namely, non-metallic drainage pipes, non-metal water pipes; accessories for non-metal pipes, namely, non-metal pipe collars, plastic pipe supports, non-metal pipe connectors, namely, non-metal pipe fittings for rigid pipes and non-metal couplings and joints, non-metal elbows for pipes, non-metal pipe fittings for rigid pipes; and structural parts and fittings for the aforesaid goods; all of the foregoing goods for use in the fields of heating and plumbing ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Conex IPR Limited
- Other trademarks owned by Conex IPR Limited
- Other trademarks owned by Conex IPR Limited
- Other trademarks in Class 006
- Other trademarks in Class 011
- Other trademarks in Class 019
- Similar marks named CONEX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 8, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jun 8, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jun 1, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 18, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 2, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 8, 2025 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Oct 10, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jul 3, 2023 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| May 25, 2023 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| May 25, 2023 | INPC | INVALIDATION PROCESSED | — |
| Apr 24, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 24, 2022 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Aug 24, 2022 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Aug 2, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 4, 2022 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Mar 8, 2021 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 15, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 28, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 28, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 8, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 8, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 22, 2015 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 22, 2015 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 18, 2015 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 2, 2015 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 2, 2015 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 2, 2015 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 26, 2015 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 29, 2015 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 29, 2015 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 29, 2015 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 29, 2015 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 9, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 8, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 8, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 4, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 12, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 12, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 12, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 11, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 11, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 11, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 11, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 10, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 6, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 3, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 30, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 29, 2015 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |