Drawing for J&P

USPTO serial 79159805

J&P

Reviewed by CopyMark Law Group

Reg. 5051650Status 404
Filing date
Status date
Registration date
Oct 4, 2016
Examiner
HINES, REGINA C
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with J&P?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James L. Bikoff

James L. Bikoff Smith, Gambrell & Russell, LLP1055 Thomas Jefferson Street, NWSuite 400Washington, DC 20007

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, namely, facades and facade elements, railings, cable railings and cable structures; Metal building materials, namely, reinforcing elements for concrete building components, namely, metal reinforcing channels, stud rails, shear reinforcements, reinforcing anchors, double-headed anchors, sandwich anchors, single shear dowels; metal anchor channels, metal railing fastening channels and metal mounting channels; holders for the aforesaid channels and suspension parts, namely, metal railing posts; trapezoidal sheet metal fixing rails; connection elements made of common metal for use as concrete building components; metal stud rails for building construction; common metal reinforcing connectors; metal support brackets for use in brickwork; metal grout-in brackets; metal support foot elements, wall shoe elements, bearings, bearing means and staircase bearings for setting in concrete; pre-fabricated metal parts for masonry in the nature of supporting and fixing elements, namely, carbon steel or stainless steel facade connection systems like brickwork support angle brackets, windposts, brick anchors and associated sliding ties, connecting needles for use in masonry or for affixing pre-cast concrete parts together; [ reinforcement connectors, namely, ] reinforcement connectors, namely, reinforcement continuity system like rebar splices or couplers with male rebars with bolt threads and female bars with threaded couplers and sockets doublethreaded and size reduction connectors; metal connection elements, namely, screws, nuts, sleeves, rivets, pins, hammerhead screws, toothed bolts, hook bolts and nuts, slide bolts, dowels, socket dowels, transport anchors, double shear dowels, anchors, sandwich anchors, support anchors, holding anchors, retaining brackets, torque anchors, tie bolts, transport anchor bolts, securing wedges and retaining brackets; metal building anchor sleeves and screw sleeves for setting in concrete; metal building anchor sleeves and cable eyelet fittings for transporting building components and for pre-cast concrete parts and for pre-fabricated masonry and for chimneys; steel wire ropes and accessories, namely, steel wire ropes with end terminations like loops or threaded end fixings, bolt terminals, thimbles, shackles, turnbuckles, clamps for fixing and connecting construction items; metal chains; metal building materials, namely, anchor systems for transporting concrete parts; metal parts of building components, namely, grounding connections, grounding anchors and reinforcing bars; metal supports, namely, transport anchors, transport loops featuring wire rope; steel wire ropes, metal cable loops; metal earthing bridges for concrete reinforcements; sheet metal strips, sheet metal sealing strips featuring a non-metallic coating for use in sealing concrete construction joints; building materials of metal, namely, shuttering elements for concrete construction; metal shaped chests; metal profiles for building construction; Mouldings of metal for use in building construction; metal anchoring system for installing building components, concrete, masonry, pre-cast concrete parts or prefabricated masonry; metal mounting parts, namely, fasteners and connectors for concrete formwork for fastening to concrete formwork, blind formwork, recessing bodies and mouldings of metal; metal tags, stoppers and mounting bars; metal clamps for use with concrete loops; metal mounting brackets; metal storage chests; metal hangers made of wire ropesSECTION 71 - CANCELLED
017Plastic packing and insulating materials; self-expanding tape for sealing concrete joints; heat and sound-insulating structural panels for concrete component joints; non-metal flexible pipes; non-metal sealing elements, namely, joint tapes, strips and panels for commercial use in concrete construction; joint tapes and joint sealing tapes of plastic; flat sealing sheets of plastic; plastic expansion joint connectors for concrete constructionSECTION 71 - CANCELLED
019Non-metal building materials, namely, facades and facade elements of glass; non-metal mounting parts for fastening to concrete formwork, blind formwork and recessing bodies, namely, plastic caps, nailing plates, nailing plugs, fixing screw, moulding insert, recess disc for use in building construction; non-metal mouldings for building construction; rigid pipes, not of metal for building construction; casing pipes of paper or cardboard as formwork shuttering for concrete construction; injection hoses for use with concrete building components; pipe ducts of plastic for concrete building components and/or sandwich building elements; non-metal drain pipes for installation in building construction for floor drains, roof drains and pump wells; plastic shuttering elements for concrete construction; non-metal moldings for building constructionSECTION 71 - CANCELLED
020Non-metal concrete construction hardware, namely, load transfer dowels; Plastic fastening anchors for setting in concrete and for hollow wall elements; stoppers, namely, plastic caps or plugs, not of metal, for anchor sleeves/anchor sockets; retaining brackets of plastic; storage chests of plastic for housing fixing and connecting elements in building construction; plastic mounting hardware goods, namely, fittings of plastic to mount wire rope, hemp rope, plastic rope, chains and lifting straps; furniture fittings not of metal; non-metal profiles for use in building construction; plastic anchoring means, namely, plastic dowels, sockets and brackets for incorporating into building components, concrete, masonry, pre-cast concrete parts or pre-fabricated masonry; non-metal tags, namely, key tags, keychain tags, data clips and ear tags; plastic stoppers for containers or bottles; plastic clamping elements for use with concrete loops; plastic nail plates; non-metal hardware, namely, plastic screws, nuts, sleeves and socket dowelsSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 1, 2024DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Nov 1, 2024DETHDEATH OF INTERNATIONAL REGISTRATION
Feb 5, 2024INNTTOTAL INVALIDATION PROCESSED BY THE IB
Jan 6, 2024INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jan 6, 2024INPCINVALIDATION PROCESSED
Dec 21, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Apr 21, 2023C71TCANCELLED SECTION 71
Oct 4, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Jul 31, 2020INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Jun 16, 2020INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jun 16, 2020INPCINVALIDATION PROCESSED
May 20, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Nov 21, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Sep 20, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED
Sep 20, 2019PLGLASSIGNED TO PARALEGAL
Feb 24, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 8, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 8, 2017FIMPFINAL DISPOSITION PROCESSED
Jan 4, 2017ES7RTEAS SECTION 7 REQUEST RECEIVED
Jan 4, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 4, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 23, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jul 28, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jul 19, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jul 19, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 13, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jul 13, 2016OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Jun 29, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 29, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jun 29, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jun 13, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 7, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
May 9, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED
May 9, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
May 9, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 30, 2015GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2015GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 12, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 12, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 12, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 2, 2015RFNPREFUSAL PROCESSED BY IB
Apr 14, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 14, 2015RFRRREFUSAL PROCESSED BY MPU
Apr 14, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 13, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 19, 2015ACECAMENDMENT FROM APPLICANT ENTERED
Mar 19, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 12, 2015ALIEASSIGNED TO LIE
Mar 4, 2015FAXXFAX RECEIVED
Feb 26, 2015RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Feb 26, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 25, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 17, 2015DOCKASSIGNED TO EXAMINER
Feb 17, 2015MAFRAPPLICATION FILING RECEIPT MAILED
Feb 13, 2015DOCKASSIGNED TO EXAMINER
Feb 13, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 12, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance