USPTO serial 79159979
SENV1ON
Reviewed by CopyMark Law Group
Reg. 5033601Status 404
- Filing date
- Status date
- Registration date
- Sep 6, 2016
- Examiner
- HUSSAIN, TASNEEM
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with SENV1ON?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Wind-powered machines, namely, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy; turbines, namely, wind turbines; structural parts and accessories for such wind-powered machines, namely, rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power units in the nature of auxiliary power units for supplying electrical power | SECTION 71 - CANCELLED | — |
| 009 | Switch cabinets, namely, cabinets specifically designed to house electric switches, as well as designed to house electrical and electronic instruments and apparatus for recording, processing, storage and transmission of data from wind power plants and wind farms, namely, computer hardware and computer software to measure wind speed, the sun's position, solar radiation flux density, air temperature, air pressure, relative humidity, photovoltaic module temperature, and other data relevant to wind power plants and wind farms; switch cabinets specifically designed to house electrical and electronic control apparatus and instruments for wind power plants and wind farms; switch cabinets specifically designed to house electrical and electronic voltage and current regulators for wind power plants and wind farms; switch cabinets specifically designed to house electrical and electronic regulating, checking, supervision, control and monitoring apparatus and instruments for wind power plants and wind farms, namely, electric or electronic monitors, meter and sensors for measuring turbine performance and power generation in wind power plants, data processing apparatus, computer hardware, and computer software for operating, monitoring and regulating wind power plants and wind farms; computer software for calculating the dimensions of wind farms and the surrounding land, as well as calculating their efficiency, and computer software for calculating the dimensions of rotors used on the wind mills in wind farms, computer interface boards and graphical user interface software, voltage surge protectors; electronic vibration sensors, measuring apparatus, namely, meters for measuring electricity in watt-hours, inverter units, namely, electric converters and electric transformers; all of the foregoing for wind power plants and wind farms | SECTION 71 - CANCELLED | — |
| 035 | Professional business consultancy with regard to wind power plants and wind farms | SECTION 71 - CANCELLED | — |
| 037 | Building construction in the field of wind power plants; installation services, namely, installation of towers, turbines, electrical and computer hardware systems for wind power plants and farms; maintenance and rebuilding of wind powered machines that have been worn or partially destroyed; maintenance and repair of wind power plants; installing rotor blades in wind turbines for others | SECTION 71 - CANCELLED | — |
| 040 | Production of energy using wind power; generation of electricity using wind power | SECTION 71 - CANCELLED | — |
| 042 | Remote maintenance in the nature of remote control and remote monitoring of wind power plants and wind farms through computerized retrieval of data via the Internet; conducting technical measurements, inspections for taking technical measurements, and calculations in the field of wind power plants and wind farms using remote measuring devices in the nature of computer software, as well as aerial digital imaging, to measure the exterior features of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the range of wind power plants and wind farms, namely, reviewing the engineering data collected in the field of wind power plants and wind farms and analyzing the results of said surveys; design and development of computer software in the field of wind power plants and wind farms; technical consultancy in engineering and engineering services, namely, technical planning and technical development services as well as technical project management in the nature of engineering of wind power plants projects; new product engineering for others, namely, designing rotor blades for others; technical research in the field of wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; technical quality monitoring services of rotor blades | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SENVION GmbH
- Other trademarks owned by SENVION GmbH
- Other trademarks owned by SENVION GmbH
- Other trademarks owned by Siemens Gamesa Renewable Energy Service GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named SENV1ON
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 24, 2025 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jan 24, 2025 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jan 1, 2024 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 29, 2023 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Nov 29, 2023 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Nov 17, 2023 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 17, 2023 | C71T | CANCELLED SECTION 71 | — |
| Apr 16, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 6, 2021 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 15, 2021 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 17, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 25, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 25, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 6, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 4, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 6, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 13, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 13, 2016 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 1, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 21, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 21, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 1, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 1, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 1, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 16, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 9, 2016 | ALIE | ASSIGNED TO LIE | — |
| May 5, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 27, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 27, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 27, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 27, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 6, 2016 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 6, 2016 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 6, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 4, 2015 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 6, 2015 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jul 6, 2015 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jul 6, 2015 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 1, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 1, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 1, 2015 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 24, 2015 | ALIE | ASSIGNED TO LIE | — |
| Jun 16, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 15, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 15, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 13, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 23, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 23, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 21, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 21, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 20, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 17, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 17, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 12, 2015 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |