USPTO serial 79160055
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,550
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Peter Kunin
Peter Kunin Downs Rachlin Martin PLLC199 Main Street, PO Box 190Burlington, VT 05402-0190UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal bollards; landscape edgings of metal; paving slabs and blocks of metal; [ paving slabs of metal; metal drainage channels; rigid metal channels for drainage; metal building materials, namely, drainage channels, pipes, and metal profiles; ] covers of metal for manholes; manholes of metal; [ sluices channels of metal, other than parts of machines, for use with gases and liquids; run-off channels, of metal; path edgings, of metal; walling, of metal; walling products and panels formed from metallic materials, namely, metal wall panels; metallic curbing blocks; ] metal guard rails; * all the aforesaid goods for use in relation to paving solutions; * metal furniture fittings; metal canopies; floorboards and panels of metal for walkways; [ storage shelters of metal; ] metal canopy structures; bicycle storage racks of metal; metal bins; [ metal hoardings; ] post caps, being caps of metal for posts; metal gratings; [ metal telephone booths; metal holders for advertising signs; ] bicycle parking installations of metal; [ motorcycle parking installations of metal; ] metal bollards; [ metal storage shelters; ] [ metal road signs; metal road signage; ] metal fencing, namely, rails, fencing panels, posts, and gates; portable metal free-standing barriers; [ metal window grilles; metal tree supports for holding planted trees in an upward position; ] [ metal manhole covers; ] [ metal gazebos; ] * none of the aforesaid goods being for cable management, power distribution or wiring products and solutions, or any electrical and electronic apparatus and instruments relating thereto, including but not limited to trunking, conduits, ducting, power units, power poles, switches or sockets, guttering, soil and sanitary waste pipeworks and/or systems, underground systems for moving waste water and foul discharge from above ground systems, rainwater systems, drainage systems other than linear and block drainage channels, manholes or sluices for paving solutions * | ACTIVE | — |
| 011 | [ Lamps, electric luminaires, LED luminaires, light post luminaires; luminaires using LEDs as a light source for street or roadway lighting; lamp parts, namely, columns and brackets; street lamps; * none of the aforesaid goods being for cable management, power distribution or wiring products and solutions, or any electrical and electronic apparatus and instruments relating thereto, including but not limited to trunking, conduits, ducting, power units, power poles, switches or sockets, guttering, soil and sanitary waste pipeworks and/or systems, underground systems for moving waste water and foul discharge from above ground systems, rainwater systems, drainage systems other than linear and block drainage channels, manholes or sluices for paving solutions * ] | SECTION 71 - CANCELLED | — |
| 019 | Paving slabs and blocks of concrete and stone; paving stones; non-metal drainage channels; non-metal building materials, namely, drainage channels, pipes, and non-metal profiles; non-metal manholes; non-metal storm manholes; [ non-metal rigid channels for drainage; ] non-metal sluice channels, other than parts for machines, for use with gases and liquids; run-off channels, not of metal; walling of non-metallic materials; non-metal wall panels; non-metal pavers; non-metal paving and building materials, namely, pavers; paving and walling blocks and bricks; non-metal paving materials, namely, paving stones; stone paving; non-metallic curbing blocks; non-metal paving materials, namely, concrete compositions; wood pavers; non-metal bollards; [ non-metal road signs and signage; ] non-metal gates and fence posts; portable non-metal free-standing barriers; non-metal parking installations for bicycles and motorcycles; non-metal bicycle storage racks; non-metal paving materials and products, namely, blocks, setts, slabs and bricks; non-metal paving and walling blocks, setts, slabs and bricks; paving stones; stone paving; natural stone paving; stone walling; natural stone walling; natural stone walling products, namely, stone slabs; concrete paving; concrete walling; concrete walling products, namely, concrete slabs; non-metal parking curbs; curbstones; non-metal curbing and curb units; curbstones of concrete; curbstones of stone; curbstones of natural stone; non-metal drainage structures, namely, drainage channels, including of concrete and stone; edging stones and non-metal slabs, including of concrete; edging stones and non-metal slabs, including of natural stone; natural and artificial stone; natural and artificial stone products, namely, pavers | ACTIVE | — |
| 020 | [ Landscape edging of plastic; ] outdoor furniture, namely, benches, seats and tables, [ bulletin boards, ] non-metal bins [, display boards ] ; outdoor furniture made of plastic or of wood; outdoor furniture, namely, benches, seats and tables, [ bulletin boards, ] [ display panels, ] non-metal bins; [ furniture; garden furniture; ] outdoor furniture parts [ ; furniture parts; garden furniture parts ] | ACTIVE | — |
| 035 | [ The bringing together, for the benefit of others, of a variety of items of street furniture, including bollards, benches, seats, bins, cycle storage products, shelters and parking products, metal and non-metal building materials, metal and non-metal paving materials and products, metal and non-metal walling and walling products, metal and non-metal curbing products, metal and non-metal drainage products, metal and non-metal edgings, apparatus for lighting, lamps, luminaires, lamp support columns and brackets, street lamps, enabling customers to conveniently view and purchase those goods, including from an Internet website specialising in the same, or by means of telecommunications; retail store services featuring street furniture, including bollards, benches, seats, bins, cycle storage products, shelters and parking products, metal and non-metal building materials, metal and non-metal paving materials and products, metal and non-metal walling and walling products, metal and non-metal curbing products, metal and non-metal drainage products, metal and non-metal edgings, apparatus for lighting, lamps, luminaires, lamp support columns and brackets, street lamps; mail order retail store services featuring street furniture, including bollards, benches, seats, bins, cycle storage products, shelters and parking products, metal and non-metal building materials, metal and non-metal paving materials and products, metal and non-metal walling and walling products, metal and non-metal curbing products, metal and non-metal drainage products, metal and non-metal edgings, apparatus for lighting, lamps, luminaires, lamp support columns and brackets, street lamps; online retail store services featuring street furniture, including bollards, benches, seats, bins, cycle storage products, shelters and parking products, metal and non-metal building materials, metal and non-metal paving materials and products, metal and non-metal walling and walling products, metal and non-metal curbing products, metal and non-metal drainage products, metal and non-metal edgings, apparatus for lighting, lamp support columns and brackets, street lamps; business consultancy, advisory and information services for or in relation to any or all of the aforementioned services in this class; * none of the aforesaid services relating to cable management, power distribution or wiring products and solutions, or any electrical and electronic apparatus and instruments relating thereto, including but not limited to trunking, conduits, ducting power units, power poles, switches or sockets, guttering, soil and sanitary waste pipeworks and/or systems, underground systems for moving waste water and foul discharge from above ground systems, rainwater systems, drainage systems other than linear and block drainage channels, manholes or sluices for paving solutions * ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building construction; building repairs; provision of information, advisory services and consultancy regarding all of the aforesaid; building construction services; construction of driveways, roadways, flooring, walling and paved areas; installation of driveways, roadways, flooring, walling and paved areas; roofing services; repair of buildings, driveways, roadways, flooring, walling, paved areas and roofs; construction and installation of building projects in the nature of driveways, roadways, flooring, walling and paved areas ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 1, 2025 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Sep 19, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Apr 22, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 20, 2024 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 20, 2024 | INPC | INVALIDATION PROCESSED | — |
| Mar 9, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 9, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jul 9, 2023 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Jun 16, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 29, 2022 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 31, 2021 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 31, 2018 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Oct 19, 2018 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 27, 2018 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Feb 19, 2018 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Feb 19, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 15, 2018 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Dec 28, 2017 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Sep 29, 2017 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Feb 9, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 23, 2016 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 1, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 1, 2016 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 31, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 31, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 15, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 15, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 11, 2016 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 24, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 24, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 24, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 2, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 2, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 2, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 2, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 2, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 13, 2015 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 13, 2015 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 13, 2015 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 31, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 19, 2015 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 18, 2015 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 18, 2015 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 18, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 18, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 13, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 21, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 20, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 20, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 20, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 19, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 17, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 17, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 17, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 13, 2015 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Feb 12, 2015 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |