Drawing for RIVERO

USPTO serial 79163186

RIVERO

Reviewed by CopyMark Law Group

Reg. 4920107Status 404
Filing date
Status date
Registration date
Mar 22, 2016
Examiner
JAGANNATHAN, SIDDHARTH
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RIVERO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

David J. Ervin

David J. Ervin Crowell & Moring LLPP.O. Box 14300Washington, DC 20044-4300UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Generating plants, namely, electric power supply and emergency power supply generators; turbines for power generation; machines and devices for energy generation, energy saving, and energy recovery, namely, water turbines and water pumps; control mechanisms for machines, engines, or motors, namely, pump control systems comprised of high voltage generators, frequency drives, frequency inverters or contactors, float switches, and pressure sensors; turbine shafts being parts of machines; turbine blades for power generation; emergency power supply generators; hydraulic turbines; installations for ecological power generation, namely, fluid pumping installations consisting of brackets, floating bodies, fittings, tubes, cables, and pipes, pump installations consisting of impellers, motors, casings, bearings, shafts, and gaskets, and power installations consisting of relays, sensors, clutches and apparatus for power transmission other than for land vehicles, electric generators, electrical cabinets, plugs, and connectorsSECTION 71 - CANCELLED—
011Energy facilities and infrastructure, namely, energy transformation plants and plants for heating, cooling, air conditioning, ventilating, and steam generating, specifically, solar energy systems in the nature of solar thermal-based power plants, alternative energy generation power plants, and power plants for private households and industry, food production, building technology, fountains, pressure booster systems, and sewage treatment plants, the aforesaid goods being operated with renewable energy; water supply and water treatment installations being operated with renewable energy, namely, sewage purification installations, heating installations, and water purification installations; taps for the control of water flow; draught accelerators in the nature of industrial-water purifying installation apparatus; installations for sanitary purposes, namely, toilets, showers, bath tubs, lifting units in the nature of waste water lifting units without feces and sewage lifting units; wells in the nature of well-water storage tanks, well seals, and blowers, pumps being parts of sanitary facilities and bath plumbing installations, and mobile sanitary facilities in the nature of portable toilets; purification installations for sewage; regulating apparatus for water apparatus, namely, water pressure reducers, stop cocks, and stop valvesSECTION 71 - CANCELLED—
040Energy production; rental, leasing, and providing of parts and components for generating or converting energySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 11, 2025DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jul 11, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Jul 31, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 11, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 11, 2023INPCINVALIDATION PROCESSED—
Jun 7, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 7, 2022C71TCANCELLED SECTION 71—
Mar 22, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 22, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 29, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 5, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 5, 2016FIMPFINAL DISPOSITION PROCESSED—
Jun 22, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 22, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 5, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 5, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 4, 2016GPNXNOTIFICATION PROCESSED BY IB—
Dec 16, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 16, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 16, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 3, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 1, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 1, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Dec 1, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 1, 2015GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 1, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 13, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 13, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 6, 2015ALIEASSIGNED TO LIE—
Oct 16, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 2, 2015RFNTREFUSAL PROCESSED BY IB—
Apr 16, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 16, 2015RFRRREFUSAL PROCESSED BY MPU—
Apr 14, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 14, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 13, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2015DOCKASSIGNED TO EXAMINER—
Apr 10, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 9, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance