Drawing for DIRIS DIGIWARE

USPTO serial 79163903

DIRIS DIGIWARE

Reviewed by CopyMark Law Group

Reg. 4957803Status 706Renewal
Filing date
Status date
Registration date
May 17, 2016
Examiner
YARD, JOHN S
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with DIRIS DIGIWARE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*

Plus Government fees of $850

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JANET G RICCIUTI

JANET G RICCIUTI JANET GILBERT RICCIUTI, PC2003 KALORAMA ROAD NWWASHINGTON, DC 20009United States

Goods and services

ClassDescriptionStatusFirst use
009Scientific, measuring, signaling and checking (supervision) apparatus and instruments, apparatus, instruments and equipment for [ conducting, distributing, converting, storing, ] regulating or controlling electric current, namely, electronic apparatus for controlling and analyzing an electricity distribution network; electronic apparatus for measuring parameters on an electricity network for distributing electricity; electronic apparatus for counting and managing the electrical energy of an electricity distribution network; [ voltage regulators, voltage stabilizers, voltage testers, high-voltage power supplies, static voltage regulators, high-voltage power sources in the nature of power supplies, power line voltage stabilizers, electric voltage transformers, high-voltage transformers, ] voltage control units, [ electrical switches, disconnect electrical switches, fuse electrical switches, disconnecting electrical switches, circuit breakers, fuses, fuse holders; cutouts, namely, circuit breakers for photovoltaic installations and UPS systems; electrical switches and remote electrical switches; electrical relays, commutators, rectifiers; chargers for electric batteries; electronic or electric power rectifiers and regulators; electronic transformers and converters for current, for voltage and frequency; static converters, static inverters, electronic and electric inverters, ] current and voltage sensors; electric counters, namely, electric meter for electrical energies; analog and digital electricity meters; fitted covers for electrical equipment, namely, [ low-voltage electric equipment, power switching and ] supply systems and measurement systems; [ electrical cables and electric cable connectors, batteries, battery chargers, battery converters, accumulators; load transfer units, namely, current rectifiers; rectifier modules, AC/DC power supplies, inverters, rephasing condensers, ] electrical controllers; electronic instruments, namely, logic analyzers [ and electrical network analyzers] ; programmable electrical controllers for controlling and protecting circuits, goods and persons; apparatus and instruments for measuring quantities and electrical parameters, namely, circuit testers, [ ammeters, oscilloscopes ] and voltmeters; electronic display interfaces, [ electric switch boards, electric switch, ] electric control panels [, electric connectors; protection and cutout boxes, namely, cutout switches; electronic circuit boards, integrated circuit cards and components; static uninterruptible electrical power circuits, remote control circuits; electric insulation monitors, circuit overload protector devices, namely, protection detector devices and circuits for electric and static uninterruptible power supplies ]ACTIVE—
037[ Maintenance, repair and functional verification inspection of installations in the sector of electricity, namely, electrotechnical installations, electric and electronic installations for monitoring, checking and the remote control of industrial operations and electronic installations featuring industrial, urban and household distribution equipment in the electricity sector ]SECTION 71 - CANCELLED—
042[ Technical consultancy in the scientific field of energy consumption and conservation with energy measures; engineering services in the field of energy technology and the supply of electricity; inspection and monitoring of electricity distribution installations, electric converters and inverters for quality control purposes and to ensure proper functioning ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 17, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Aug 17, 202671AGREGISTERED-SEC.71 ACCEPTED—
Aug 17, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 13, 2026ES71TEAS SECTION 71 RECEIVED—
May 17, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Aug 9, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 3, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 23, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 23, 2023INPCINVALIDATION PROCESSED—
Apr 12, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 12, 2022NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Aug 12, 2022C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Aug 2, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 7, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 3, 2022ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 6, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 15, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 19, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 19, 2016FIMPFINAL DISPOSITION PROCESSED—
Aug 17, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 17, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 1, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 27, 2016GPNXNOTIFICATION PROCESSED BY IB—
Feb 10, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 10, 2016NPUBNOTICE OF PUBLICATION—
Feb 10, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 25, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 13, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 12, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 12, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 6, 2016ALIEASSIGNED TO LIE—
Dec 16, 2015ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 16, 2015CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 15, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 19, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 18, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 18, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 7, 2015RFNPREFUSAL PROCESSED BY IB—
May 18, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 18, 2015RFRRREFUSAL PROCESSED BY MPU—
May 15, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 14, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 5, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
May 1, 2015DOCKASSIGNED TO EXAMINER—
May 1, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 30, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance