Drawing for SAIPEM

USPTO serial 79164400

SAIPEM

Reviewed by CopyMark Law Group

Reg. 4876487Status 706Registered
Filing date
Status date
Registration date
Dec 29, 2015
Examiner
LAPTER, ALAIN J
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SAIPEM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrea S. Fuelleman

Andrea S. Fuelleman Neal, Gerber & Eisenberg LLP225 West Randolph Street, Suite 2800Chicago, IL 60606United States

Goods and services

ClassDescriptionStatusFirst use
011[ Installations for dissociating, purifying, washing, liquefying and re-evaporating hydrocarbons, gas, petroleum or petroleum fractions, refinery gases and methane; installations for cracking mixtures of liquid and gaseous hydrocarbon; installations for generating synthetic gases and artificial methane; installations for liquefying carbon and for reducing carbon to gas, reactors for chemical reactions; machines for liquefying gas and industrial liquid gases, and natural and refinery gases; gas pipelines being parts of the above-referenced installations; installations for the production of fertilizers; installations for the production of chemical additives for fuels ]SECTION 71 - CANCELLED—
037Construction, construction supervision, installation, repair, modification, maintenance services of industrial plants and infrastructure to produce, refine, conduct, storing, transporting and distributing fluids and liquids, in particular water, hydrocarbons, petroleum, gas, natural and refined gas, liquid gas and chemicals; construction, construction supervision, installation, repair, modification, maintenance services of petrochemical plants, chemical installations, distribution networks for the transport of fluids, liquids and fuels, in particular water, hydrocarbons, petroleum, natural and refined gas, gas and liquid gas, or fuel gas, gaseous mixtures of fuels; [ environmental land reclamation of industrial sites; ]construction, repair, modification and maintenance services of facilities for the production, storage and transport of energy; [ construction, repair, modification or maintenance services of plants for the production of fertilizer; ] construction of onshore and offshore oil and gas wells for exploration and production of oil and gas fields or for geothermal power; construction, construction supervision of floating means in the nature of barges, semisubs, vessels and platforms, boats or subsea means in the nature of submarines, AUT (autonomous underwater vehicles), ROV (Remotely Operated Vehicles) and subsea packages and modules [ ; construction, construction supervision of railways, rail networks and infrastructure in the nature of roads, highways, bridges, tunnels, viaducts, overpasses and underpasses for the transport of people and goods; construction, construction supervision of marine, lake and river infrastructure in the nature of bridges, harbors, jetties, weirs, dams ]ACTIVE—
039[ Transporting, storage, distribution and terminalling through pipelines, by road, sea and air of water, hydrocarbons, crude oil, petroleum products, gas, liquid natural gas and liquefied petroleum gas, petrochemical and chemical products]SECTION 71 - CANCELLED—
040[ Treatment of materials, namely, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas and chemicals; production, refining, processing and purification of hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas and chemicals, reclamation of production waste through separation, treatment, gathering and removal of waste of all kinds ]SECTION 71 - CANCELLED—
042Scientific and technological services, namely, research analysis and testing in the field of production, processing, transport and supplying of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas, of chemical and petrochemical apparatus, of oil or gas wells and of oil or gas fields, including on-shore, marine or offshore oil or gas wells and oil or gas fields; research, design and engineering services of installations and plants for the production, processing, transport and supplying of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas, of chemical and petrochemical apparatus, of oil or gas wells and of oil or gas fields, including on-shore, marine or offshore oil or gas wells and oil or gas fields; research services, engineering and providing technical calculations in the fields of extraction, production, refining, processing of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas and chemicals, development of industrial processes for processing water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas and chemicals, exploration of water, petroleum and natural gas; [ analyses of water, oil and gas wells; ] consulting, research and development of new technologies in relation to reclamation of areas, installations and/or industrial processes in the field of production, processing, transport and supplying of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas, of chemical and petrochemical apparatus, of oil or gas wells and of oil or gas fields, including on-shore, marine or offshore oil or gas wells and oil or gas fields; [ design services of railways, rail networks and infrastructure for the transport of people and goods; ] engineering services, design and development of installations, equipment and plants for generating, storing and transporting energy; design services of railway and transport of people and goods; engineering, design and development services of floating and underwater means in the nature of barges, semisubs, vessels and platforms and of submarines, AUT (autonomous underwater vehicles), ROV (Remotely Operated Vehicles) and subsea packages and modules [ ; engineering, design and development services of marine, lake and river infrastructure in the nature of bridges, harbors, jetties, weirs, dams ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 30, 2026INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 28, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 30, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 30, 202571AGREGISTERED-SEC.71 ACCEPTED—
Sep 8, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 11, 2025ES71TEAS SECTION 71 RECEIVED—
Dec 29, 2024REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 10, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Nov 10, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 15, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Aug 30, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 30, 2023INPCINVALIDATION PROCESSED—
Aug 1, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 1, 2022NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Dec 1, 2022C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Nov 22, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 13, 2022ES75TEAS SECTION 71 & 15 RECEIVED—
Jun 13, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 13, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 13, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jun 13, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 13, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 13, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 29, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 15, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 30, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 30, 2016FIMPFINAL DISPOSITION PROCESSED—
Mar 29, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 29, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 13, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 13, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 9, 2015GPNXNOTIFICATION PROCESSED BY IB—
Sep 23, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 23, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 23, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 8, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 31, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 17, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 17, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 10, 2015ALIEASSIGNED TO LIE—
Jul 28, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 7, 2015RFNTREFUSAL PROCESSED BY IB—
May 15, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 15, 2015RFRRREFUSAL PROCESSED BY MPU—
May 15, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 14, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
May 9, 2015DOCKASSIGNED TO EXAMINER—
May 9, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 7, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance