Drawing for TRANCHÉ

USPTO serial 79165196

TRANCHÉ

Reviewed by CopyMark Law Group

Reg. 4848687Status 404
Filing date
Status date
Registration date
Nov 10, 2015
Examiner
VERHOSEK, WILLIAM T
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with TRANCHÉ?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Richard M. Goldberg

RICHARD M. GOLDBERG GOLDBERG PATENT LAW OFFICE25 E SALEM ST STE 419HACKENSACK, NJ 07601-7416UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Rigid pipes, not of metal for building purposes; asphalt; pitch; bitumen; monuments, not of metal; alabaster; roof flashing, not of metal; angle irons, not of metal; lintels, not of metal; slate; roofing slates; potters' clay; scaffolding, not of metal; reinforcing materials, not of metal, for building purposes; door frames, not of metal; floating docks, not of metal, for mooring boats; tarred strips, for building purposes; crash barriers, not of metal, for roads; beacons, not of metal, non-luminous; letter boxes of masonry; busts of stone, concrete or marble; cabanas, not of metal; paint spraying booths, not of metal; telephone booths, not of metal; concrete; chimneys, not of metal; roof gutters, not of metal; duck boards, not of metal; wood pulp board, for building; caissons for construction work under water; coal tar; cement; asbestos cement; magnesia cement; advertisement columns, not of metal; plywood; water-pipes, not of metal; ducts, not of metal, for ventilating and air-conditioning installations; flashing, not of metal, for building; manhole covers, not of metal; roofing, not of metal; roofing, not of metal, incorporating solar cells; roof coverings, not of metal; cornices, not of metal; buildings, transportable, not of metal; quartz; asbestos mortar; windows, not of metal; chimney cowls, not of metal; plaster; gravel; aquarium gravel; glass granules for road marking; granite; trellises, not of metal; sandstone for building; street gutters, not of metal; wood veneers; greenhouse frames, not of metal; fireproof cement coatings; cement slabs; paving slabs, not of metal; slabs, not of metal, for building; grave slabs, not of metal; luminous paving blocks, not of metal; paving blocks, not of metal; building timber; manufactured building timber; veneer wood; wood for making household utensils; rough sawn timber; wood, semi-worked; laths, not of metal; mortar for building; marble; refractory construction materials, not of metal; asphalt paving compositions; bricks; moldings, not of metal, for cornices; works of art of stone, concrete or marble; olivine for building; framework, not of metal, for building; cement posts; posts, not of metal; poles, not of metal, for electric power lines; telegraph posts, not of metal; door panels, not of metal; signs, non-luminous and non-mechanical, not of metal, for roads; parquet flooring; floor tiles, not of metal; floors, not of metal; macadam; tar and pitch; porches, not of metal, for building; jalousies, not of metal; tiles, not of metal, for building; wall tiles, not of metal; tile floorings, not of metal; stones; artificial stone; natural stone; limestone; building stone; mooring bollards, not of metal; gravestones; porphyry stone; gates, not of metal; folding doors, not of metal; doors, not of metal; joists, not of metal; rocket launching platforms, not of metal; fences, not of metal; bituminous coatings for roofing; cladding, not of metal, for building; wainscotting, not of metal; wood paneling; wall claddings, not of metal, for building; vinyl siding; aquarium sand; sand, except foundry sand; staircases, not of metal; roofing shingles, not of metal; non-luminous and non-mechanical signs, not of metal; greenhouses, transportable, not of metal; silos, not of metal; ceiling panels, not of metal; statues of stone, concrete or marble; outdoor blinds, not of metal and not of textile; tombstone plaques, not of metal; parquet floor boards; wooden floor boards; planks of wood for building; roofing tiles, not of metal; window frames, not of metal; tombs, not of metal; turnstiles, not of metal; diving boards, not of metal; beams, not of metal; gutter pipes, not of metal; rigid pipes, not of metal; chimney pots, not of metal; stained glass windows; building glass; window glass, for building; window glass, except glass for vehicle windows; aviaries, not of metal structures; insect screens, not of metalSECTION 71 - CANCELLED—
040Treatment of construction materials, namely, natural and artificial stones and natural and artificial stone plates; processing of natural and artificial stones; refining of natural and artificial stones; finishing of natural and artificial stones; sandblasting of natural and artificial stones; processing of natural and artificial stone plates; refining of natural and artificial stone plates; finishing of natural and artificial stone plates; sandblasting of natural and artificial stone platesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 28, 2025DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Feb 28, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Apr 12, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 26, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 19, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 19, 2023INPCINVALIDATION PROCESSED—
Jan 27, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 27, 2022C71TCANCELLED SECTION 71—
Nov 10, 2020REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 23, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 7, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 16, 2016XXSSGENERIC MADRID TRANSACTION SENT TO IB—
May 16, 2016XXCRGENERIC MADRID TRANSACTION CREATED—
Feb 10, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 10, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 25, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 25, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 21, 2015GPNXNOTIFICATION PROCESSED BY IB—
Aug 5, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 5, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 5, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 17, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 17, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 17, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 17, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 13, 2015ALIEASSIGNED TO LIE—
Jul 2, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 13, 2015RFNTREFUSAL PROCESSED BY IB—
May 30, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
May 28, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 28, 2015RFRRREFUSAL PROCESSED BY MPU—
May 28, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 27, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 26, 2015DOCKASSIGNED TO EXAMINER—
May 26, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 22, 2015LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
May 21, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance