Drawing for HYSELECT

USPTO serial 79165659

HYSELECT

Reviewed by CopyMark Law Group

Reg. 4948519Status 404
Filing date
Status date
Registration date
May 3, 2016
Examiner
FLETCHER, TRACY L
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with HYSELECT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Hydraulic turbines; electric generators; hydropower equipment, namely, francis turbines, pelton wheels and kaplan turbines; kaplan tube turbines; pump-turbines; storage pumps, in the nature of hydraulic pumps; radial, semi-axial and axial hydraulic pumps; pump shut-off devices, namely, valves, ball valves, shutter valvesSECTION 71 - CANCELLED—
009Measuring, regulating and control installations for hydroelectric power stations, in the nature of flow regulators utilizing wicket gate feedback devices and voltage and current regulators for conversion of hydraulic energy to electric energy for commercial use; control devices, namely, customized power electronics to vary the magnetic fields in generators in the nature of thyristors, capacitors, transistors, resistors and inductorsSECTION 71 - CANCELLED—
037Hydro-electric factory construction; maintenance and repair of hydroelectric power stations; hydraulic construction services, namely, construction of hydroelectric power stationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 26, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 11, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 17, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 17, 2023INPCINVALIDATION PROCESSED—
Jul 18, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 18, 2022C71TCANCELLED SECTION 71—
Aug 26, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 9, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 9, 2016FIMPFINAL DISPOSITION PROCESSED—
Aug 3, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 3, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 16, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 13, 2016GPNXNOTIFICATION PROCESSED BY IB—
Jan 27, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 27, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 27, 2016NPUBNOTICE OF PUBLICATION—
Jan 11, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 21, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 21, 2015CNEAEXAMINERS AMENDMENT MAILED—
Dec 21, 2015XAECEXAMINER'S AMENDMENT ENTERED—
Dec 21, 2015CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 21, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 21, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 18, 2015ALIEASSIGNED TO LIE—
Dec 7, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 4, 2015RFNTREFUSAL PROCESSED BY IB—
Jun 16, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 16, 2015RFRRREFUSAL PROCESSED BY MPU—
Jun 14, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 13, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 10, 2015DOCKASSIGNED TO EXAMINER—
Jun 5, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 1, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 30, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance