USPTO serial 79168423
MABEY
Reviewed by CopyMark Law Group
Reg. 4995314Status 706Renewal
- Filing date
- Status date
- Registration date
- Jul 12, 2016
- Examiner
- THOMAS, JULIE
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with MABEY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $2,550
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey C. Joyce
Jeffrey C. Joyce Viridian Law, P.C.204 Main St.Ellsworth, ME 04605United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Construction items primarily made of metal, namely, shores, supports and braces all for use in preventing collapse of, or otherwise supporting the ground during the course of excavations; supports and frames for use in the building and construction of formwork, made primarily of metal; metal sheeting; metal clamps for use in beam form work; ] Construction equipment primarily made of metal, namely, panel bridges, support floats, frames, deck units, bridge towers, trestles, gantries all for use in creating temporary or permanent bridges, or providing frames and foundations for those bridges; prefabricated modular bridges primarily made of metal [ ; wind turbine support towers made of metal; metal pylons for use in electricity transmissions; steel structures for offshore energy applications ] | ACTIVE | — |
| 007 | [ Hydraulic jacks ] | SECTION 71 - CANCELLED | — |
| 009 | [ Electronic sensors for noise; gaseous air pollution, particle air pollution, or dust; electronic sensors for installation on structures for measurement of strain; electronic sensors for installation on structures for measurement of movement ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metallic construction materials and elements, namely, shores, supports and braces all for use in preventing collapse of, or otherwise supporting the ground during the course of excavation, supports and frames for use in the building and construction of formwork; concrete panels; concrete beams; plastic panels for use in building or bridge construction; plastic posts, namely, posts to support safety barriers; temporary roadway panels primarily made of plastics; construction items primarily made of plastics, namely, clips, struts and braces ] | SECTION 71 - CANCELLED | — |
| 037 | [ Civil engineering construction, namely, construction of roads; ] Construction, modification and refurbishment of steel structures; construction, maintenance and repair of bridges; [ construction, maintenance and repair of wind turbine towers and wind farms; installation of electricity transmission pylons; ] installation [ and repair ] of machinery, namely, [ cranes, ] launching nose parts, launching roller parts, jacking equipment [ and pneumatic or hydraulic rams ] for bridge building; rental of non-mechanical [ plant and non-mechanical ] equipment, namely, posts, panels, shores, supports, braces, launching nose parts, launching roller parts and girders, for [ groundwork, formwork, falsework and ] temporary bridging [ ; rental of scaffolding; rental of shuttering; rental of bracing systems; rental of ladders; rental of drainage pumps; rental of air compressors; rental of propping and jacking equipment; rental of portable crash-barriers ] | ACTIVE | — |
| 040 | [ Rental of electricity generators; treating steel structures and steel components by shot blasting; providing protective coatings to structural steel products by painting or galvanizing ] | SECTION 71 - CANCELLED | — |
| 042 | Engineering consultancy services; civil engineering drawing, design and consultancy services [ ; rental of electronic sensors for monitoring structures; technical data analysis services, for analyzing data relating to environmental noise, gaseous air pollution, particulate air pollution, particulate air pollution or dust, or for stress or strain of structures ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Mabey Holdings Limited
- Other trademarks owned by Mabey Holdings Limited
- Other trademarks owned by Mabey Holdings Limited
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named MABEY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 22, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 22, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 20, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 29, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 1, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jul 12, 2025 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jul 10, 2025 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 10, 2025 | INPC | INVALIDATION PROCESSED | — |
| Apr 11, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 6, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 30, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 30, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 30, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 11, 2024 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Aug 11, 2024 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 22, 2024 | PCGR | PETITION TO DIRECTOR GRANTED | — |
| May 17, 2024 | APET | ASSIGNED TO PETITION STAFF | — |
| Feb 21, 2024 | TPDR | TEAS PETITION TO DIRECTOR RECEIVED | — |
| Feb 4, 2024 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 27, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 20, 2023 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| Sep 19, 2023 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| May 27, 2023 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| May 20, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 2, 2022 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jul 12, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 12, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 12, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 2, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Apr 26, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 6, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 6, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 6, 2016 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 21, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 17, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 17, 2016 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Mar 17, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 17, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 4, 2016 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 3, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 22, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 22, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 22, 2016 | ALIE | ASSIGNED TO LIE | — |
| Jan 19, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 18, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 18, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 15, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 28, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 28, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 26, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 25, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 14, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 10, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 10, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 9, 2015 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |