Drawing for B IN MOTION

USPTO serial 79168674

B IN MOTION

Reviewed by CopyMark Law Group

Reg. 4953499Status 404
Filing date
Status date
Registration date
May 10, 2016
Examiner
TRUSILO, KELLY JEAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with B IN MOTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jacqueline M. Lesser

Jacqueline M. Lesser Baker & Hostetler LLP2929 Arch StreetCira Centre 12th FloorPhiladelphia, PA 19104-2891

Goods and services

ClassDescriptionStatusFirst use
019non-metallic building materials for constructing buildings, namely, plaster, gypsum boards, gravel, chippings, coarse gravel, sand for use in construction, natural stone, building stone, natural stone slabs and tiles, building bricks, glass building bricks, tiles for building, wood panels, boards made of wood particles, timber building boards, wood-fiber reinforced cement boards, construction timber, stone slates, slate slabs, tiles of slate; all of the foregoing having environmental and energy performance enhancing properties; civil engineering works and other types of permanent buildings, non-metallic constructions, namely, buildings in the form of cabins, pre-fabricated buildings, portable cabins, pre-fabricated storage sheds, storage sheds, mobile homes; transportable buildings not of metal; monuments not of metal; concrete; cement; building glass; stained-glass windows; lumber; asphalt, pitch and bitumenSECTION 71 - CANCELLED—
037Construction and renovation of buildings, roads, bridges and all types of civil engineering works and permanent buildings; building construction information; consulting services in the field of construction and organization of building site operations; supervision and management of construction and renovation works; supervision and management of construction works, namely, advisory services for operational organization of site work with a sustainable development and energy-saving approach; painting, plastering, plumbing and roofing work; building sealing services; building insulation installation services; demolition of buildings; provision of consulting services in sustainable and energy-saving interior furnishings and appliances; maintenance, interior cleaning and repair of buildings, outer surfaces of buildings and other types of works, namely, stadiums, tunnels, bridges, cruise terminal buildings, harbors, airports, data center, shopping centers, factories ; managing and supervising construction works, namely, services for assignments as main contractors, agents for main contractors and project owners; services of installation, maintenance and repair of apparatus for heating, ventilation, air-conditioning, fire detection and security systems provided to occupants or proprietors of buildings of all kinds, for residential, commercial and industrial use; rental of building site construction machines; scaffolding erection and repair; maintenance of water, gas and electricity distribution networks and lines; building construction servicesSECTION 71 - CANCELLED—
042Industrial analysis and research services, namely, assessment, estimation and research services in the technical, scientific and technological fields provided by engineers, in connection with building construction operations, civil engineering works and other types of permanent buildings; research, design and technical study services in the field of construction, connector technology for connected buildings, digital communications, the environment, energy and renewable energies, namely, wind and photovoltaic, these services can come with tariff simulations; design, production, development, programming, installation, updating and maintenance of software; technological supervision of construction partners, suppliers of building products, and subcontractors in the field of sustainable and environmentally friendly building and construction methods; digital modeling and planning in relation to the construction of buildings and other types of works; advice in relation to information technology; architecture; design of interior decor; all the aforementioned services fitting into a process of sustainable construction and developmentSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 29, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 11, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 22, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 22, 2023INPCINVALIDATION PROCESSED—
Jul 25, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 25, 2022C71TCANCELLED SECTION 71—
Sep 2, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 12, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 12, 2016FIMPFINAL DISPOSITION PROCESSED—
Aug 10, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 10, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 23, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 20, 2016GPNXNOTIFICATION PROCESSED BY IB—
Feb 3, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 3, 2016NPUBNOTICE OF PUBLICATION—
Feb 3, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 18, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 16, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 15, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 15, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 15, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 15, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 7, 2015RFNTREFUSAL PROCESSED BY IB—
Jul 21, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 21, 2015RFRRREFUSAL PROCESSED BY MPU—
Jul 19, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 18, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 15, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 12, 2015DOCKASSIGNED TO EXAMINER—
Jul 11, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 9, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance