Drawing for T. RAD-SMART

USPTO serial 79169380

T. RAD-SMART

Reviewed by CopyMark Law Group

Reg. 4975438Status 404
Filing date
Status date
Registration date
Jun 14, 2016
Examiner
MAKHDOOM, SAIMA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with T. RAD-SMART?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Parts for construction equipment, namely, fans, shrouds, and dust protection nets; machine parts in the nature of heat exchanger for construction equipment; non-electric prime movers not for land vehicles, other than water mills and wind mills, namely, gasoline engines, diesel engines, steam engines, gas turbines, and Stirling engines; parts for non-electric prime movers, other than water mills and wind mills, namely, heat exchangers, fans, shrouds, dust and protection nets; machine parts in the nature of heat exchanger for internal combustion engines and parts thereof; cooling radiator for motorcycle; cooling radiator for automobilesSECTION 71 - CANCELLED—
009Heat exchanger for electronic machines, namely, electric control devices for heating, electric heat sequencers, heat sinks for use in electronic components; heat sink for semi-conductor elements for use in electronic componentsSECTION 71 - CANCELLED—
011Air conditioning apparatus for industrial purposes and parts thereof, namely, filters for air conditioning, evaporators for air conditioners, fans for air conditioning apparatus; heat exchanger not being parts of machines for air conditioning apparatus for industrial purposes; air conditioning apparatus for vehicles and parts thereof, namely, filters for air conditioning, evaporators for air conditioners, fans for air conditioning apparatus; heat exchanger not being parts of machines for air conditioning apparatus for vehicles; air conditioning apparatus for household purposes and parts thereof, namely, filters for air conditioning, evaporators for air conditioners, fans for air conditioning apparatus; heat exchanger not being parts of machines for air conditioning apparatus for household purposes; heat exchangers not being parts of machines for electric refrigerators or freezers for household purposes; household electrothermic appliances, other than for beauty or sanitary purposes, namely, heating installations, laundry drying machines, industrial dryers for heating and dehumidifying; heat exchangers for household electrothermic appliances, other than for beauty or sanitary purposes, namely, heat generators, heating elements, heating installations; heat exchangers not being machine parts for freezing machines and apparatus for industrial purposes; heat exchangers not being machine parts for water heatersSECTION 71 - CANCELLED—
012Motorcycle parts in the nature of heat exchanger for motorcycles and motorcycle parts in the nature of oil coolers for gear for motorcycles, other than heat exchanger for internal combustion engines; automotive parts in the nature of heat exchanger for automobiles and automotive parts in the nature of oil coolers for gear for automobiles, other than heat exchanger for internal combustion enginesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 3, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 9, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 16, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 16, 2023INPCINVALIDATION PROCESSED—
Aug 30, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 30, 2022C71TCANCELLED SECTION 71—
Nov 11, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 20, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 20, 2016FIMPFINAL DISPOSITION PROCESSED—
Sep 14, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 14, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 29, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 25, 2016GPNXNOTIFICATION PROCESSED BY IB—
Mar 9, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 9, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 9, 2016NPUBNOTICE OF PUBLICATION—
Feb 18, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 22, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 22, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 22, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 15, 2015RFNTREFUSAL PROCESSED BY IB—
Jul 29, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 29, 2015RFRRREFUSAL PROCESSED BY MPU—
Jul 29, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 28, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 27, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 25, 2015DOCKASSIGNED TO EXAMINER—
Jul 25, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 23, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance