USPTO serial 79171013
MABEY
Reviewed by CopyMark Law Group
Reg. 5075591Status 708Renewal
- Filing date
- Status date
- Registration date
- Nov 8, 2016
- Examiner
- YOUNG, THOMAS PAUL
- Law office
- —
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with MABEY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $2,550
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Brian L Petrequin, Esq.
Brian L Petrequin, Esq. Greenberg Traurig LLP500 Campus DriveSuite 400Florham Park, NJ 07932Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Construction items primarily made of metal, namely, shores, supports and braces all for use in preventing collapse of, or otherwise supporting the ground during the course of excavation; supports and frames for use in the building and construction of formwork, made primarily of metal; metal sheeting; metal clamps for use in beam formwork; ] construction equipment primarily made of metal, namely, panel bridges, support floats, frames, deck units, bridge towers, trestles, gantries all for use in creating temporary or permanent bridges, or providing frames and foundations for those bridges; prefabricated modular bridges primarily made of metal [ ; wind turbine support towers made of metal; metal pylons in the nature of metal beams for use in electricity transmission; steel structures for offshore energy applications, namely, oil drilling platforms made mostly of metal, gas drilling platforms made mostly of metal, and floating offshore oil or gas drilling platforms made mostly of metal ] | ACTIVE | — |
| 007 | [ Hydraulic jacks ] | SECTION 71 - CANCELLED | — |
| 009 | [ Electronic sensors for noise, gaseous air pollution, particle air pollution, or dust; electronic sensors for measurement of strain for installation on structures; electronic sensors for measurement of movement for installation on structures ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metallic construction materials and elements, namely, shores, supports and braces all for use in preventing collapse of, or otherwise supporting the ground during the course of excavation, supports and frames for use in the building and construction of formwork; concrete panels; concrete beams; plastic panels for use in building or bridge construction; plastic posts, namely, posts to support safety barriers; temporary roadway panels primarily made of plastic; construction items primarily made of plastics, namely, braces and struts in the nature of supports ] | SECTION 71 - CANCELLED | — |
| 037 | [ Civil engineering construction, namely, construction of roads; ] construction, modification and refurbishment of steel structures; construction, maintenance and repair of bridges; [ construction, maintenance and repair of wind turbine towers and windfarms; construction and installation of electricity transmission pylon structures; ] installation [ and repair ] of machinery, namely, [ cranes, launching nose parts, ] launching roller parts, jacking equipment [ and pneumatic or hydraulic rams, ] for bridge building; rental of non-mechanical construction equipment, namely, posts, panels, shores, supports, braces, launching nose parts, launching roller parts and girders, for [ groundwork, formwork, falsework and ] temporary bridging [ ; rental of scaffolding; rental of shuttering; rental of bracing systems; rental of ladders; rental of drainage pumps; rental of air compressors; rental of propping and jacking equipment; rental of portable crash barriers ] | ACTIVE | — |
| 040 | [ Rental of electricity generators; treating steel structures and steel components by shot blasting; applying protective coatings to structural steel products by means of galvanization ] | SECTION 71 - CANCELLED | — |
| 042 | Engineering consultancy services; civil engineering drawing, design and consultancy services [ ; rental of electronic sensors for monitoring structures; technical data analysis services, namely, analysis of environmental noise, gaseous air pollution, particulate air pollution, particulate air pollution or dust, or for stress or strain of structures ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Mabey Holdings Limited
- Other trademarks owned by Mabey Holdings Limited
- Other trademarks owned by Mabey Holdings Limited
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named MABEY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 9, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Nov 8, 2025 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Feb 13, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 30, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 30, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 30, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 3, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 1, 2024 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 1, 2024 | INPC | INVALIDATION PROCESSED | — |
| Jan 20, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 20, 2023 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| May 20, 2023 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 20, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 2, 2022 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jul 12, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 9, 2017 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 25, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 2, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 2, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 8, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 8, 2016 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 23, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 3, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 3, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 3, 2016 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 19, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 15, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 14, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 14, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 11, 2016 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 11, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 8, 2016 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Mar 7, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 7, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 16, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 15, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 15, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 25, 2015 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 9, 2015 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 9, 2015 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 9, 2015 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 8, 2015 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 25, 2015 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 21, 2015 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 21, 2015 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 20, 2015 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |