Drawing for LAUNCH

USPTO serial 79171768

LAUNCH

Reviewed by CopyMark Law Group

Reg. 5019692Status 404
Filing date
Status date
Registration date
Aug 16, 2016
Examiner
POLZER, NATALIE M
Law office
—

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LAUNCH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thomas D. Bratschun

Thomas D. Bratschun Adsero IP8210 Southpark TerraceLittleton, CO 80120UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007[ Machines and machine tools, namely, filter machines for production and processing of fertilizers, urea, urea derivatives and industrial chemicals; separating machines, namely, gas separators, liquid separators and solids separators; centrifuges; coating machines for applying chemical coatings to commercial products and packaging; waste processing machines, namely, waste compacting and recycling crushing machines; machines for the production of materials, namely, machines for the processing of raw materials for extracting fertilizers, urea, urea derivatives and industrial chemicals; machine tools, tools and parts thereof, namely, filters and filter components for use in production of fertilizers, urea, urea derivatives and industrial chemicals; condensing installations, namely, pool condensers; ejectors, namely, chemical process ejectors and industrial process ejectors, namely, pumps and compressors as parts of chemical and industrial process lines, pumps and compressors for the chemical industry and industrial processing industry, kinetic energy pumps and compressors used in chemical and industrial processes; granulators, namely, granulators in the nature of granulating machines used in chemical and industrial processing; pressure vessels, namely, industrial chemical reactors, cyclones, autoclaves, separators, cyclone separators, tanks and drums, all for use in chemical and industrial processing; heat exchangers being parts of machines for use in chemical and industrial processes; gas compressors; vacuum pumps; gas turbines engines not for land vehicles; turbine generators, namely, generators of electricity; processing apparatus for rubber, namely, rubber forming and mixing machines; machines for processing plastic; pelletizing machines, namely, pelletizers; mixing machines, extrusion machines for plastic, injection molding machines, industrial robots for handling material; pelletizing industrial robots; processing equipment for solid waste, namely, waste compacting machines, waste crushing machines and waste processing machines; all aforesaid machinery and apparatus for use in the chemical industry ]SECTION 71 - CANCELLED—
011[ Apparatus for heating, steam generating, cooking, refrigerating, drying, ventilating and water supply and sanitary purposes for use in the chemical industry, namely, heating systems composed of shell and tube heat exchangers and plate-type heat exchangers and separators for the cleaning and purification of gases and liquids, steam generating installations, refrigerators, dryers for fertilizers and urea, ventilators for chemical processes and industrial processes; chemical reactors, namely, chemical reactors for heating and cooling; gas scrubbers; industrial scrubbers for removing particulate matter from the air during industrial processing, namely, dynamic air scrubbers; anti-splash devices; evaporators ]SECTION 71 - CANCELLED—
035Business advisory services related to the setting up of chemical plants and installations; advise on business organization and business economics in the field of chemical plants and installations; managing business conference centers for others for technical training and courses for the benefit of the chemical industry; business advisory services relating to the setting up of centers for technical training and courses for the benefit of the chemical industrySECTION 70 - CANCELLED—
037Building construction supervision of building work in the field of the construction of chemical plants and installationsSECTION 70 - CANCELLED—
041Provision of technical training and courses in the field of business and chemical plants for the benefit of the chemical industry and also advice thereforSECTION 70 - CANCELLED—
042Technological advice in the field of engineering featuring construction of chemical plants and installations and the providing of technical information hereupon; design of chemical plants and installations, parts thereof and control systems therefor; technical planning and advisory services relating to the design of chemical plants and installations; engineering services related to the technical operation of chemical plants and installations and advisory services related thereto; technical advisory services for the automation of chemical plants and installations; simulation of chemical and/or physical processes for the purpose of optimization of the engineering design of chemical plants and the design of equipment systems for these simulations; development of software for the chemical industry and the processing industry and for the simulation of processes for the benefit of education and industrySECTION 70 - CANCELLED—
045Licensing of industrial property rights in the field of chemical plants and installations and related products and servicesSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Feb 12, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Dec 18, 2025DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Dec 18, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Aug 16, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jun 11, 2024INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 11, 2024INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 11, 2024INPCINVALIDATION PROCESSED—
May 3, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 3, 2023NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Sep 3, 2023C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Sep 3, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 15, 2023ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 3, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 17, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 17, 2017FIMPFINAL DISPOSITION PROCESSED—
Nov 16, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 16, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 31, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 11, 2016NPUBNOTICE OF PUBLICATION—
Apr 25, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 15, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 13, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 13, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 6, 2016ALIEASSIGNED TO LIE—
Mar 30, 2016ALIEASSIGNED TO LIE—
Mar 17, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 23, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 2, 2015RFNTREFUSAL PROCESSED BY IB—
Sep 17, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 17, 2015RFRRREFUSAL PROCESSED BY MPU—
Sep 17, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 16, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 12, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 9, 2015DOCKASSIGNED TO EXAMINER—
Sep 8, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 3, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance