Drawing for ENERGYTUBE

USPTO serial 79171844

ENERGYTUBE

Reviewed by CopyMark Law Group

Reg. 5038384Status 404
Filing date
Status date
Registration date
Sep 13, 2016
Examiner
FALK, JONATHAN ROBERT
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ENERGYTUBE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Accumulators, electric; accumulators, electric, for vehicles; battery jars; battery boxes; ammeters; electronic apparatus for testing the electrical conductivity of materials, namely, gas, liquids and solids, for testing materials, namely, gas, liquids and solids, for testing compression, strength, hardness and tensile characteristics of industrial materials, for controlling, adjusting and testing of drives and motors, for testing the state of operability of electronic sirens and public address systems, for testing anti-theft warning, alarms, motion detection, printed circuit boards, vehicles, drives, motors, for testing the performance, efficiency and modularization of accumulators, for testing the communication and regulation in regard to batteries and power networks; electric junction boxes; connections for electric lines; batteries, electric; elictricity limiters; data processing apparatus; diagnostic apparatus for vehicles, drives, motors, anti-theft warning, alarms, motion detection, software, controlling units, printed circuit boards, vehicles, drives, motors, accumulators, energy storages, not for medical purposes; fuse wire; dynamometers; electric installations for the remote control of industrial operations; coils, electric; electricity transformers; resistances, electric; wires, electric; cables, electric; condensers being capacitors; electromagnetic coils; conductive silicone packing for electromagnetic interference; remote controls for electrical, mechanical devices, namely, motors, vehicles, radios, televisions, stereos, computers, stoves, fireplaces, doors, alarms, batteries, energy storages, power networks; frequency meters; galvanic cells; galvanic batteries; galvanometers; printed circuit boards; printed circuits; grids for batteries; electrical inductors; interfaces for computers; wire connectors for electricity; electrical current collectors; regulating apparatus, electric; contacts, electric; couplings, electric; battery chargers; chargers for electric batteries; conductors electric; magnets; electric measuring devices for accumulators, batteries, energy storages, electricity, tools, vehicles, engines; plates for batteries; relays, electric; switches, electric; electric apparatus for commutation, namely, commutators; sockets, plugs, and other contacts all being electric connections; covers for electric outlets; current rectifiers; converters, electric; step-up transformers; voltage surge protectors; electric monitoring apparatus for monitoring flowmeters, electric current and electrical signals, energy usage, batteries, energy storages, mobile devices, temperature, vehicles, vehicle tracking devices, alarms, for monitoring the communication and regulation between batteries and power networks; voltmeters; electrical cell switchesSECTION 71 - CANCELLED—
039Electricity distribution; distribution of energy; water distributionSECTION 71 - CANCELLED—
042Consultancy in the field of energy-saving; provision of scientific information, advice and consultancy in relation to carbon offsetting; engineering; chemistry services, namely, chemistry consultation, research in the field of chemistry, research and development in the field of cell chemistry in regard to accumulators and batteries; energy auditing; technical research in the field of electricity, batteries, energy usage, energy storage, mobility, aeronautics, traffic, vehicles, infrastructure, engineering; construction drafting; technical project studies in the field of electricity, batteries, energy usage, energy storage, mobility, mobility, aeronautics, traffic, vehicles, infrastructure, engineeringSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 22, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 7, 2024INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 18, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 18, 2023INPCINVALIDATION PROCESSED—
Nov 24, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 24, 2023C71TCANCELLED SECTION 71—
Dec 30, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 14, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 14, 2016FIMPFINAL DISPOSITION PROCESSED—
Dec 13, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 12, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 1, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 13, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 28, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 8, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 8, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 8, 2016NPUBNOTICE OF PUBLICATION—
May 23, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 16, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 25, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 25, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 18, 2016ALIEASSIGNED TO LIE—
Apr 4, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 8, 2015RFNPREFUSAL PROCESSED BY IB—
Oct 19, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 19, 2015RFRRREFUSAL PROCESSED BY MPU—
Oct 16, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 15, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 9, 2015DOCKASSIGNED TO EXAMINER—
Sep 12, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 8, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 3, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance