Drawing for THE GREEN MACHINE DORNIER

USPTO serial 79173094

THE GREEN MACHINE DORNIER

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
CAPSHAW, DANIEL
Law office
TMO LAW OFFICE 110 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with THE GREEN MACHINE DORNIER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
004Industrial oils and greases, lubricants, gear oilSECTION 70 - CANCELLED—
007Machines for textile industry; weaving machines; couplings and transmission components; gear units, drives and motors and engines for aforesaid machines; parts of machines, namely, leno devices, mechanical and pneumatic inserting devices (tucked-in device), shedding devices, weft insertion elements, weft brakes, weft cutting devices and weaving reeds; machines and plants consisting thereof for processing plastics; film stretching machines; coating machines, longitudinal stretching machines; transverse stretching machines; extruders; parts of machines, namely, metering and mixing device (for raw material); dies for extruders, take-up devices, winders, tentering clips; machines and plants consisting thereof for producing fibre-composite semi-finished products and fibre-composite components; parts, fittings and accessories for all aforesaid goodsSECTION 70 - CANCELLED—
009Electronic data processing equipment; electrical/electronic control panels; computer software; none of the aforesaid goods being for land, air and water vehicles; electrical/electronicc apparatus and instruments for quality control, measurement, control, regulation and monitoring of process phases during the manufacture of textile goods, goods of plastic and fibre-composite semi-finished products and fibre-composite componentsSECTION 70 - CANCELLED—
037Repair/servicing, maintenance, assembly and modification of machines for the textile industry, machines and plants consisting thereof for processing plastics, machines and plants consisting thereof for producing fibre-composite semi-finished products and fibre-composite components; none of the aforesaid services being for land, air and water vehiclesSECTION 70 - CANCELLED—
042Technical project planning and development of industrial processes in connection with the production of textile goods, goods of plastic and fibre-composite semi-finished products and fibre-composite components; engineering and design of machines for the textile industry, machines and plants consisting thereof for processing plastics and machines and plants consisting thereof for producing fibre-composite semi-finished products and fibre-composite componentsSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 25, 2025DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 8, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 3, 2017FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
May 16, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 16, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 20, 2017LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Mar 17, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 1, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 1, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 6, 2017LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jan 12, 2017LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Dec 8, 2016LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jun 9, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 16, 2016MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 16, 2016ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Oct 30, 2015RFNTREFUSAL PROCESSED BY IB—
Oct 9, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 9, 2015RFRRREFUSAL PROCESSED BY MPU—
Oct 9, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 8, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 6, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 2, 2015DOCKASSIGNED TO EXAMINER—
Oct 2, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 1, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance