Drawing for MEVA

USPTO serial 79177576

MEVA

Reviewed by CopyMark Law Group

Reg. 5000744Status 706Renewal
Filing date
Status date
Registration date
Jul 19, 2016
Examiner
WILLIS, PAMELA Y
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with MEVA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $3,191*

Plus Government fees of $7,650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jessica S. Sachs

Jessica S. Sachs Harness, Dickey & Pierce, PLC100 Bloomfield Hills ParkwaySuite 200Bloomfield Hills, MI 48304

Goods and services

ClassDescriptionStatusFirst use
006Formwork for concreting of walls, slabs, beams, joists, formwork for pillars, columns and other special formwork, textured formwork to form concrete surfaces, the aforesaid goods mainly made of metal; clamps for connecting concrete formwork and other formwork accessories made of metal, namely, formwork beams, pillars and push-pull props for formwork and concreting, prop heads made of metal, falsework, shoring, supporting, working, and safety scaffolds, front and side guard rails for working and safety scaffolds made of metal; barriers of metal; fall protection systems made of metal; beams of metal; slab props made of metal; crane-dependent and crane-independent climbing scaffolds and climbing formwork, automatically climbing scaffolds and formwork made of metalACTIVE—
007Hydraulically, pneumatically, engine or manually lifted work platforms, lifts, formwork for concreting, machines for horizontal and vertical movement of formworkACTIVE—
009Computer programs and calculation programs, stored on data carriers, in particular for planning of construction and formworkACTIVE—
019Formwork for concreting of walls, slabs, beams, joists, formwork for pillars, columns and other special formwork, textured formwork to form concrete surfaces, the aforesaid goods mainly not of metal; multilayer boards made of plastic as shuttering panels for concrete formwork, formwork not of metal; props and beams of wood for building construction, in particular for concrete formwork, formwork beams, not of metal, pillars and push-pull props, not of metal, for formwork and concreting, falsework, shoring, supporting, working, and safety scaffoldsACTIVE—
037Building construction, in particular building construction above and below ground, construction services relating to civil engineering; formwork and scaffolding assembly; erection of scaffolds; rental equipment services in the field of construction, namely, rental of construction equipment, formwork, framework, scaffolds, working and building platforms; repair and cleaning services of formwork and scaffoldingACTIVE—
039Transport, in particular transport of building construction equipment, formwork and its accessories; transport of falsework and shoring scaffolds and its accessories by truck, train, ship or airplane; transport of building construction accessories in general by truck, train, ship or airplane; packaging and storage of goods, in particular storage and packaging of building construction equipment, formwork and its accessories; storage and packaging of falsework and shoring scaffolds and its accessories for transportation; storage and packaging for others of construction accessories generally for transportationACTIVE—
040Contract manufacturing of formwork for concreting of walls, slabs, beams, joists, formwork for pillars, columns and other special formwork, textured formwork to form concrete surfaces; contract manufacturing of clamps for connecting concrete formwork and other formwork accessories, formwork beams, pillars and push-pull props for formwork and concreting, prop heads, falsework, shoring, supporting, working, and safety scaffolds, front and side guard rails for work and safety scaffolds made of metal; contract manufacturing of barriers made of metal; contract manufacturing of all protection systems made of metal; contract manufacturing of beams made of metal; contract manufacturing of ceiling props made of metal; contract manufacturing of crane-dependent and crane-independent climbing scaffolds and climbing formwork, automatically climbing scaffolds and formwork, contract manufacturing of machines for horizontal and vertical movement of formwork; manufacturing of formwork for othersACTIVE—
041Education services, namely, and training in the field of building construction, in particular in the field of formwork technology, organization of educational training events; publication of printed matter and electronic publications namely scientific papers in the field of building constructionACTIVE—
042Scientific and technological services namely research in the field of civil engineering; industrial analysis and research in the field of civil engineering; design and development of computer hardware and software, in particular updating of computer software; services of engineers; building design, construction planning; construction planning of construction sites, in particular for building construction, repair and installation work; engineering consultancy for formwork and scaffolding technology, in particular for building formwork; structural engineering analysis of scaffolding and concrete formworkACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 16, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 16, 202671AGREGISTERED-SEC.71 ACCEPTED—
Sep 8, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 16, 2026ES71TEAS SECTION 71 RECEIVED—
Jul 6, 2026EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Jul 6, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 6, 2026ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jul 6, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 6, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 6, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 6, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 20, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 24, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Mar 22, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 12, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 24, 2022NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jun 24, 2022C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jun 10, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 7, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 5, 2022ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 19, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 17, 2019CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jun 7, 2019CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Nov 25, 2016FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 3, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 3, 2016FIMPFINAL DISPOSITION PROCESSED—
Oct 19, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 19, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 3, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 3, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 13, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 30, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 17, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 16, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 5, 2016RFNTREFUSAL PROCESSED BY IB—
Dec 17, 2015RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 17, 2015RFRRREFUSAL PROCESSED BY MPU—
Dec 16, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 15, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 7, 2015DOCKASSIGNED TO EXAMINER—
Dec 7, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 3, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance