Drawing for AQUASTILL

USPTO serial 79177766

AQUASTILL

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
PINO, BRIAN
Law office
TMO LAW OFFICE 114 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with AQUASTILL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Condensing installations; steam condensers parts of machines; water heaters parts of machines; water separators; steam engines; heat exchangers parts of machines; steam engine boilers; feeding apparatus for engine boilers; pumps for heating installations; filtering machines; air suction machines; pumps machines; vacuum pumps; suction machines for industrial use; cartridges for filtering machinesSECTION 70 - CANCELLED—
011Apparatus and installations for effluent treatment; apparatus and installations for water treatment; water softening apparatus and installations; ionization apparatus for the treatment of water; water conduits installations; apparatus and installations for sea water desalination; water filtering apparatus; water purifying apparatus and machines; water purification installations; water cooling installations; filters for drinking water; water sterilizers; heat exchangers; evaporators; steam boilers, other than parts of machines; steam generating installations; fans air-conditioning; apparatus for heating, steam generating, refrigerating, ventilating, water distribution and sanitary installations; boilers other than parts of machines; heating boilersSECTION 70 - CANCELLED—
037Installation and repair of apparatus and installations for effluent treatment, for water treatment and for sea water desalination; installation and repair of industrial thermal apparatus and their components; information and consulting relating to the installation and repair of apparatus and installations for effluent treatment, for water treatment, for sea water desalination and industrial thermal apparatusSECTION 70 - CANCELLED—
040Sea water desalination and effluent and water treatment services; information and consulting relating to water and effluent treatment and sea water desalination; water purification; water recycling; waste treatment transformation; sorting of waste and recyclable material transformationSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 16, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
May 27, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 6, 2017FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 22, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 22, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 23, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 15, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 10, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 10, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 22, 2016MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 22, 2016ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Feb 5, 2016RFNTREFUSAL PROCESSED BY IB—
Jan 19, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 19, 2016RFRRREFUSAL PROCESSED BY MPU—
Jan 16, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 15, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2016DOCKASSIGNED TO EXAMINER—
Dec 15, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 11, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 10, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance