Drawing for BOSON ENERGY

USPTO serial 79178491

BOSON ENERGY

Reviewed by CopyMark Law Group

Reg. 5202122Status 404
Filing date
Status date
Registration date
May 16, 2017
Examiner
SPARER, KATERINA DOROTHY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BOSON ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Construction, repair and installation services of electricity and heat generating plants; construction, assembly in the nature of building, maintenance, conditioning in the nature of restoration, repair and installation services of installations in the nature of a plant for use in energy production; installation, construction, maintenance and repair of apparatus and instruments for generating power, namely, plants that use gasification to convert biomass, coal and waste; construction of plants for the purposes of production of electricity and thermal energy, structures for the storage of fuels, structures for the storage of electricity and thermal energy, in the field of energy, gas, environmental and air conditioning technology; installation, assembly in the nature of building, maintenance and repair of gas production apparatus and installations for generating electrical and thermal energy, namely, plants that use gasification to convert biomass, coal and wasteSECTION 71 - CANCELLED—
040Treatment of materials by gasification, plasma gasification, drying, milling, crushing and heating in the fields of heat and energy production, and in particular in the field of cogeneration; production of energy, by power generating plants; simultaneous production of heat and power, namely, cogeneration of energy; information on the treatment of materials in the field of heat and energy production, and cogeneration; production of energy; electricity generation; production of purified water, namely, water purification; generating electricity, thermal energy and steam from renewable energy sources, in particular from biomass; generation of electricity; generating gas from biomass and valuable materials, in particular from renewable raw materials; water treatment; incineration of waste and the remains of valuable materials; rental of equipment for the generation of energy; waste processing and recycling, and waste treatment; waste treatment transformation, namely, the gasification of waste; waste destruction; vitrification of ashes and residues in the nature of recycling services; post-treatment gas processing in the nature of purification and cleansing of gas and flue gases; purification of gases; drying, processing and milling of solid fuels such as biomass and coal; extraction of fuels, solid or liquid fuels, from coal and biomass as coal and biomass treatmentSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 19, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Aug 24, 2024INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 8, 2024INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 8, 2024INPCINVALIDATION PROCESSED—
Aug 2, 2024INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 1, 2023C71TCANCELLED SECTION 71—
Oct 2, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 29, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 18, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 18, 2017FIMPFINAL DISPOSITION PROCESSED—
Aug 16, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 16, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 5, 2017DOCKASSIGNED TO EXAMINER—
Feb 28, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 24, 2017GPNXNOTIFICATION PROCESSED BY IB—
Feb 8, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 8, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 8, 2017NPUBNOTICE OF PUBLICATION—
Jan 19, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 18, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 17, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 17, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 1, 2016CPRAPRIORITY ACTION MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jul 29, 2016CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jul 8, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 7, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 7, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 25, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 1, 2016RFNTREFUSAL PROCESSED BY IB—
Jan 8, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 8, 2016RFRRREFUSAL PROCESSED BY MPU—
Dec 31, 2015RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 30, 2015CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 29, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 21, 2015DOCKASSIGNED TO EXAMINER—
Dec 21, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 18, 2015LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Dec 17, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance