Drawing for FERROGLOBE

USPTO serial 79178715

FERROGLOBE

Reviewed by CopyMark Law Group

Reg. 5243290Status 707Renewal
Filing date
Status date
Registration date
Jul 18, 2017
Examiner
RADEMACHER, APRIL LUEDERS
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with FERROGLOBE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Sullivan

Todd A. Sullivan Hayes Soloway PC175 Canal StreetManchester, NH 03101United States

Goods and services

ClassDescriptionStatusFirst use
001Silicon ; silica fume used as an additive for general industrial use especially in the field of construction; strontium [ ; silica-based goods as cement substitutes and additives to enhance the properties of fresh or hardened concrete, namely, silica gel, silica powder and silica sol; carbon black for industrial purposes; inoculants, namely, ferrosilicon-based foundry alloys for general industrial use especially in the field of construction ]ACTIVE—
006Common metals and alloys [ ; building materials of metal, namely, rebar, wire mesh, corner chairs in the nature of a structural joint connector, foundations in the nature of metal components for building foundations, tie bars for use as fasteners in road construction, tie wire anchors, belts of metal for handling loads, seals, expansion joints, cavity caps, scaffolding, shutters, railings, windows, doors; metal building elements, namely, supports, pillars, wall panels; transportable buildings of metal; metallic materials for railway tracks; non-electric cables and metal wires; metal tubes; metal safes; hard metal strong boxes ]ACTIVE—
007[ Foundry machinery for metal working, namely, molding machinery, gravity welders; mining machinery, specifically, dragline excavators, shoveling machines, excavating machines, bucket wheel excavators, scrapers, bulldozers, road headers, brushing machines, loaders, compactors, and earthmoving machines; machine coupling and transmission components other than for land vehicles ]SECTION 71 - CANCELLED—
037[ Construction services, namely, planning, layout and construction of buildings; mining services, namely, mining extraction; rental of machinery for use in mining extraction; construction of mine workings and installations; quarrying ]SECTION 71 - CANCELLED—
039[ Packaging and warehousing of metals and ferroalloys ]SECTION 71 - CANCELLED—
040[ Treatment of materials and ferroalloys for general industrial use especially in the field of construction, namely, the addition of additives to molten metals; Metallurgical processing of melted iron; metal tempering; processing and treatment of bauxite, alumina, aluminum and silicon oxide; grinding and polishing of bauxite, alumina, aluminum and silicon oxide for the packaging, automobile, aviation, marine, building, machinery, sheet-metal, electronics, household appurtenance, decorative, sports and leisure, and kitchen equipment industries; smelting, namely, extracting base metals from their ores; and founding of metals ]SECTION 71 - CANCELLED—
042[ Engineering services ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 18, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Feb 12, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Dec 8, 2025INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 8, 2025LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Dec 8, 2025INPCINVALIDATION PROCESSED—
Aug 29, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Aug 28, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 30, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 30, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 30, 202471.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Sep 23, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 11, 2024ES71TEAS SECTION 71 RECEIVED—
Aug 19, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 18, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 8, 2022CHLDCHANGE OF OWNER RECEIVED FROM IB—
Nov 17, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 28, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 28, 2017FIMPFINAL DISPOSITION PROCESSED—
Oct 18, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 12, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 18, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 8, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 30, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 22, 2017CHPBPOST PUBLICATION AMENDMENT - ENTERED—
May 22, 2017APETASSIGNED TO PETITION STAFF—
May 17, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 17, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 11, 2017EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
May 2, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 2, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 28, 2017GPNXNOTIFICATION PROCESSED BY IB—
Apr 12, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 12, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 12, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 24, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 10, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 4, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 4, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 2, 2017ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 2, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 4, 2017GNS1NOTIFICATION OF SUBSEQUENT FINAL EMAILED—
Feb 4, 2017GNCFCONTINUATION OF FINAL REFUSAL E-MAILED—
Feb 4, 2017CNCFACTION CONTINUING A FINAL - COMPLETED—
Jan 12, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 11, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 11, 2017ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 9, 2016GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 9, 2016GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 9, 2016CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 1, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 1, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 28, 2016ALIEASSIGNED TO LIE—
Jun 21, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2016RFNPREFUSAL PROCESSED BY IB—
Jan 20, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 20, 2016RFRRREFUSAL PROCESSED BY MPU—
Jan 16, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 15, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 29, 2015MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 22, 2015DOCKASSIGNED TO EXAMINER—
Dec 22, 2015NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 17, 2015REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance