Drawing for MOFI

USPTO serial 79180467

MOFI

Reviewed by CopyMark Law Group

Reg. 5238545Status 404
Filing date
Status date
Registration date
Jul 11, 2017
Examiner
BELENKER, ESTHER
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MOFI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James L. Bikoff

JAMES L. BIKOFF SMITH, GAMBRELL & RUSSELL, LLPSTE 4001055 THOMAS JEFFERSON ST NWWASHINGTON, DC 20007

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; metal hardware, namely, nuts, pulleys, springs, clips, bushings, washers, screws, mounting bars, threads, sockets, bolts, props; building and construction materials of metal, namely, fixing dowels, fixing sockets, nuts, bolts, fixing anchors from metal, fasteners from metal, hinges; metal fastening anchors, namely, sockets, dowels and connecting metal parts, namely, lashes, steel angles used in building construction, tension rods to connect construction parts, namely, screws, washers, nuts, and springs; elements of metal, namely, metal connectors for precast concrete reinforcement systems, connectors for precast or cast-in-situ concrete elements or semi-precast elements; architectural fasteners of metal, namely, hinges, door fasteners; nuts of metal; metal nuts and bolts; metal fastenings, namely, ropes, cables, cords, metal fastening anchors, hooks, pegs, dowels, embeddable metal fastening anchors; connecting means and fastening elements of metal for building construction, namely, metal fastening anchors; non-electric cables and wires of common metal; metal hardware and small items of metal hardware, namely, nuts, pulleys, springs, bushings, washers, screws, threads, sockets, bolts; pipes and tubes of metal; and parts of the aforesaid goodsSECTION 71 - CANCELLED—
019Non-metallic building materials, namely, fixing dowels, fixing sockets, nuts, bolts, fastening anchors, fasteners and hinges from non-metallic material; non-metallic anchors, namely, sockets, dowels and connecting non-metallic parts, namely, lashes, angles used in building construction, tension rods to connect construction parts, namely, screws, washers, nuts, springs; non-metallic bracing pipes, rods, bars, goods of plastic for building, namely, plastic pipe supports, anchors, dowels and connectors of plastic for use in building; non-metal construction supports, namely, props, push-pull props, clips, connectors and connections, and braces; and parts for all the aforesaid goodsSECTION 71 - CANCELLED—
020Screw-threaded fasteners, not of metal; non-metallic anchoring devices, namely, bolts, nails, rivets, screws, threads, clips, props; non-metal fasteners in the nature of bolts, nails, rivets, screws, threads, clips, props; non-metal clips in the nature of pipe clips, cable clips; non-metal connectors and connections in the nature of bushings, slide nuts, plastic screws, plastic nuts, plastic bolts; non-metal hooks; nonmetal brackets, namely, for connecting precast concrete elements and buildings or for the temporary assembly of walls or building elements; non-metal pegs; non-metal protectors and support equipment, namely, accessories for protection against external influences or tilting of precast concrete elements, buildings, temporary assembled walls or building elements, namely, nonmetal rings, namely, bearing rings, washers, adapters, fixtures; non-metal poles; connecting means and fastening elements, not of metal, for building, namely, plastic screws, plastic bolts, nails, rivets, screws, threads, clips, props; and parts for the aforesaid goodsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 18, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 18, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 18, 2024INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 1, 2024INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 1, 2024INPCINVALIDATION PROCESSED—
Sep 27, 2024INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 26, 2024C71TCANCELLED SECTION 71—
Jul 11, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 21, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 22, 2018LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Mar 16, 2018LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Nov 10, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 19, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 19, 2017FIMPFINAL DISPOSITION PROCESSED—
Oct 11, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 11, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 23, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 7, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 7, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 25, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 25, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 22, 2017GPNXNOTIFICATION PROCESSED BY IB—
Apr 5, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 5, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 5, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 17, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 1, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 27, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Feb 27, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 27, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 27, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 21, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 21, 2017ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 27, 2016GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 27, 2016GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 27, 2016CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 17, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 17, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 15, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 13, 2016RFNTREFUSAL PROCESSED BY IB—
Mar 21, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 21, 2016RFRRREFUSAL PROCESSED BY MPU—
Mar 19, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 18, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 17, 2016DOCKASSIGNED TO EXAMINER—
Feb 20, 2016ACECAMENDMENT FROM APPLICANT ENTERED—
Feb 20, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 10, 2016ALIEASSIGNED TO LIE—
Feb 5, 2016FAXXFAX RECEIVED—
Jan 16, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 12, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 7, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance