USPTO serial 79180559
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
F-75009 Paris, FR
F-75009 Paris, FR
FR
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Julia C. Archer
Julia C. Archer Enns & Archer LLP939 Burke StreetWinston-Salem, NC 27101UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | separator machines, namely, centrifugal separators; centrifuges in the nature of machines; compressors for machines; punching machines, namely, punching presses for metalworking; pumps for machines; centrifugal pumps; compressed air pumps; vacuum pumps; pumps for heating installations | SECTION 71 - CANCELLED | — |
| 009 | heat control apparatus, namely, thermostats and water heater controls; pressure measuring apparatus; fluid monitoring and testing apparatus, namely, automatic fluid-behavior control machines and instruments and liquid testing instrumentation for monitoring and detecting leaks or poor performance | SECTION 71 - CANCELLED | — |
| 011 | heating installations, apparatuses for steam generation, namely, steam generating installations; apparatus for drying, namely, industrial dryers for heating and dehumidifying; heat accumulators; water heaters, heating ducts and tubes for boilers, electric heating apparatus, namely, furnaces, industrial furnaces, quenching apparatus for heat treatment fueled by liquids or gases; heat pumps; cooling installations, namely, apparatus for cooling solids, liquids, and gases, namely, air cooling apparatus, cooling evaporators, cooling installations for water, cooling units for industrial purposes, industrial cooling apparatus, namely, compax coolers; cooling evaporators; evaporators for chemical processing; recyclers, namely, gas recycling system comprised primarily of pressure swing adsorption equipment for the recovery, purification and return of gases in industrial applications; heat exchangers, not being parts of machines; brazed aluminum exchangers for cryogenic processes, namely, heat exchangers not being parts of machines | SECTION 71 - CANCELLED | — |
| 037 | Installation, maintenance, and repair of industrial equipment; repair of apparatus for heating, steam generating, and drying; air conditioning apparatus installation and repair; machinery installation, maintenance and repair; installation and repair of refrigeration apparatus | SECTION 71 - CANCELLED | — |
| 042 | Evaluation, estimates, research and reports in the fields of science and technology, namely, engineering; design and development of computers and software; services of engineers in the nature of studies and expert reports, not including expert witness services in legal matters; engineering services in the fields of cryogenics and the energy industry; calculation and technical project study services, namely, engineering design services; consulting in mechanical engineering; industrial design; materials testing; technical project studies in the nature of engineering consultation; expert reports of engineers not including expert witness reports; mechanical research; physics research; technical research in the fields of cryogenics and the energy industry; design and research services supplied by engineers in the fields of mechanical and civil engineering; providing expert reports and scientific advice relating to evaluations, appraisals, research and construction, in the fields of chemistry, metallurgy, the iron and steel industry, engineering, physics, mechanics, electricity, electronics, home heating, optics, cryogenics, energy, textiles, paper, biology, medicine, agriculture, geology, the sugar industry, agri-food, ethanol, automotive services, the aluminum, glass and cement industries | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 2, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 2, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Aug 30, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 22, 2024 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 3, 2024 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 2, 2024 | INPC | INVALIDATION PROCESSED | — |
| Mar 21, 2024 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 21, 2023 | C71T | CANCELLED SECTION 71 | — |
| Jan 10, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 9, 2017 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 28, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 12, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 12, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 10, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 10, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 4, 2016 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 25, 2016 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 25, 2016 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 5, 2016 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 5, 2016 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 5, 2016 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 19, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 6, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 6, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 6, 2016 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 6, 2016 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 6, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 16, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 15, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 15, 2016 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 5, 2016 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 5, 2016 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 5, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 15, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 15, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 15, 2016 | ALIE | ASSIGNED TO LIE | — |
| Jul 11, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 13, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 27, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 27, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 26, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 25, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 19, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 15, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 15, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 14, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |