Drawing for HRD

USPTO serial 79181303

HRD

Reviewed by CopyMark Law Group

Reg. 5253039Status 707Renewal
Filing date
Status date
Registration date
Aug 1, 2017
Examiner
SEVERSON, JUSTIN
Law office
—

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with HRD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*

Plus Government fees of $650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

F. William McLaughlin

F. William McLaughlin Wood Phillips500 West Madison StSuite 1130Chicago, IL 60661

Goods and services

ClassDescriptionStatusFirst use
017Sealing, [ packing, and insulating ] materials; [ non-metal flexible pipes; ] joint packings for non-metal rigid pipes and non-metal flexible pipes; [ expansion joint fillers; ] sealing compounds in the nature of sealants for wall and floor ducts; [ sealing means, namely, non-metal seals and gaskets for preventing leakage of fluids not being for use in machinery or land vehicle engines; non-metal sealing rings for use as connection seals; non-metal sealing strips for use in sealing against wall and floor ducts; substances for insulating buildings against moisture; sealants for pipe and cable joints; gum, raw or semi-worked; rings of rubber for use as pipe and cable connection seals; ] sealing plugs, namely, rubber plugs; [ vulcanite ebonite; semi-processed artificial resins and synthetic resins; semi-processed plastics; pipe gaskets; pipe jackets, not of metal; junctions for pipes, not of metal; flexible tubes of textile material for insulating cables and wires and pipes; synthetic rubber; ] waterproof sealings, namely, non-metal seals for mounting at wall and floor ducts; [ rubber spacers, other than pipe clamps, namely, washers, rings for use as pipe and cable connection seals; sealing and insulating materials in the nature of sealing sleeves and spacer blocks for sealing through holes in wall and floor ducts and that also enclose cables and pipes; sealing and insulating materials in the nature of sealing wall and floor ducts for leading through electricity lines, gas lines, water lines, heating lines, telecommunication lines, signal lines and data lines; sealing and insulating materials in the nature of sealing wall ducts for ship walls and housing walls; sealing and insulating materials in the nature of sealing wall and floor ducts for setting in concrete in walls and floors of buildings; sealing and insulating materials in the nature of sealing wall and floor ducts comprised of a modular assembly of a plurality of ducts forming a module together for an integration into a wall or floor all sold as a unit; sealing and insulating materials in the nature of assemblies comprised of a number of interconnected sealing wall and floor ducts all sold as a unit; ] sealing and insulating materials in the nature of flexible sealing ducts for leading through a line, plastic tubes, flexible pipes and flexible shrink tubes [, and non-metal connection couplings for flexible tubes and pipes; non-metal connection couplings for flexible tubes; sealing and fire protection assembly kits for use in updating wall and floor ducts for leading through cables and lines through walls and floors, comprising intumescent fire retardant sealant and insulating materials in pad form for insertion into through holes, in particular core drillings and wall sleeves and for upgrading wall and floor ducts; sealing and insulating materials in the nature of sealing wall and floor ducts of gastight and watertight construction, for leading through lines through walls and floors; parts and accessories for all the aforesaid goods, namely, pipe gaskets, non-metal jackets, non-metal pipe junctions, rubber sealing plugs, rubber washers ]ACTIVE—
019[ Non-metal building materials, namely, press seals; non-metal building materials, namely, press seals in the nature of a sealing closure for wall and floor openings; non-metal building materials, namely, press seals in the nature of a sealing closure for wall and floor openings penetrated by a line; non-metal building materials, namely, cable entries, wall sleeves, waste water entries, single building entries, multiple-service building entries, roof entries, all of the foregoing being in the nature of non-metal ducts; non-metal rigid pipes for use with foundations; non-metal rigid pipes for building, namely, wall sleeves in the form of pipes, feed tubes, protective tubes, drain pipes; asphalt; pitch and bitumen; non-metal transportable buildings; non-metal monuments; drain pipes, not of metal; concrete; concrete building elements, namely, prefabricated concrete water wells, prefabricated concrete sump pits in the nature of sump reservoirs, prefabricated concrete storm water cisterns and elements of the foregoing in the nature of prefabricated sections of concrete water wells, concrete sump pits in the nature of sump reservoirs and concrete storm water cisterns; concrete walls, concrete pipes and concrete plates in the nature of reinforcing plates for concrete and wood building construction; non-metal concrete casting forms, namely, boarded panels, shuttering panels, shuttering rails, pre-cast concrete wall forms; non-metal outlet pipes, namely, non-metal drain pipes, non-metal gutter pipes, non-metal drop pipes in the nature of drain pipes; non-metal penstock pipes; kits for constructing prefabricated non-metal houses; non-metal fireproof construction materials, namely, intumescent materials in the nature of pads; sandstone tubes for building, in the nature of sandstone pipes; non-metal manhole covers; non-metal manhole liners; non-metal props in the nature of support stanchions for building construction; non-metal beams; non-metal water-pipes; building materials primarily of plastics, namely, wall and floor ducts; attachments for non-metal wall and floor ducts, namely, non-metal covers for floor and wall ducts through which lines can be led and blind non-metal covers for wall and floor ducts, namely, closing covers for closing the duct prior to leading through a line, the covers being provided for an insertion into or a connection to the wall and floor ducts ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 1, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 25, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 4, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 29, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 1, 2025INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jan 27, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jan 27, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Dec 10, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 9, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 9, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 9, 202471.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Apr 8, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 27, 2023ES71TEAS SECTION 71 RECEIVED—
Aug 13, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 1, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 9, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 9, 2017FIMPFINAL DISPOSITION PROCESSED—
Nov 1, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 13, 2017GPNXNOTIFICATION PROCESSED BY IB—
Oct 13, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 11, 2017CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Oct 6, 2017CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Aug 1, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 28, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 28, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 16, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 26, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 26, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 26, 2017NPUBNOTICE OF PUBLICATION—
Apr 10, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 31, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 9, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 9, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 6, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 26, 2016CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 23, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 2, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 2, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 31, 2016ALIEASSIGNED TO LIE—
Aug 18, 2016ALIEASSIGNED TO LIE—
Aug 11, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 8, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 4, 2016RFNTREFUSAL PROCESSED BY IB—
Feb 17, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 17, 2016RFRRREFUSAL PROCESSED BY MPU—
Feb 12, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 11, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 9, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 3, 2016DOCKASSIGNED TO EXAMINER—
Feb 3, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 30, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance